| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 CrAdmitted-Finance 9 206 UDAY SINGH JAIN ROAD ALIGARH 202001 | ALIGARH | UTTAR PRADESH | 202001 | ₹3.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.6 Cr+₹50.2 L (16.4%)Admitted-Finance | ₹3.6 Cr+₹50.2 L (16.4%) | L2 | Admitted-Finance |
| 3 | L3₹4.2 Cr+₹1.1 Cr (35.5%)Admitted-Finance | ₹4.2 Cr+₹1.1 Cr (35.5%) | L3 | Admitted-Finance |
| 4 | L4₹6.1 Cr+₹3.1 Cr (100.3%)Admitted-Finance | ₹6.1 Cr+₹3.1 Cr (100.3%) | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical EMD/Fee not received |
| Sl No | Description | Qty | Unit | Technical Construction Company L1 | CHAUHAN BROTHERS L2 | SGB INFRA LIMITED L4 | M/S AGARWAL BROTHERS L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Clearing grass and removal of the rubbish including clearing of jungle and uprooting of rank vegetation, shrubs, bushes, trees upto 300mm girth measured 1.00 metre above ground level and in-equalities which includes removal/levelling of boulder/blasted/crushed rock upto a depth of 300mm under the pipe rack or under the fire water line or in between the drain and footpath or any other area inside the plant premises either mechanically or manually and disposal of rubbish up to a distance of 150 m outside the periphery of the area cleared as per the direction of EIC. | 34,000 | Sqm | 10 ₹3,40,000 | 7 ₹2,38,000 | 55 ₹18,70,000 | 5 ₹1,70,000 Lowest |
| 2.00Earth work in over areas/foundation/Pits/Trenches etc. by mechanical means (Hydraulic excavator) / manual means/controlled blasting to required profile, level, grade, camber, etc in all soils/strata as mentioned below upto 1.5meter depths, including dressing of excavated sides and ramming of bottoms and disposal / stacking of excavated materials within NFC campus for all leads and all inherent lifts and filling in layers with available earth in the NFC not exceeding 150m, watering, consolidation etc. complete all as per specifications, drawing and as directed by Engineer-in-charge. Note: Excavation to be done at certain distance for tree plantation, area grading or for any other purpose required as per the diection of EIC. | |||||||
| 2.01 | Filled up rock/Boulders/Crushed rock/Soil | 2,800 | Cum | 80 ₹2,24,000 Lowest | 150 ₹4,20,000 | 200 ₹5,60,000 | 279 ₹7,81,200 |
| 2.02 | Hard rock (by chiselling or wedging or rock hammer and cutter or hydraulic splinter or controlled blasting/by using machine/ such as poclain with jack hammer or controlled blasting or by approved chemical method as directed by EIC. | 6,500 | Cum | 750 ₹48,75,000 | 600 ₹39,00,000 Lowest | 1,000 ₹65,00,000 | 960 ₹62,40,000 |
| 3.00 | Lead charges for all additional leads over the initial lead of 150 m by mechanical transport, including loading. unloading, stacking, the disposable soil, rock, debris etc within NFC Plant premises.
Note: measurement of lead charges wlll be based on truck measurement with a deduction of voids @ 20% and 50% for soils and rock/debris respectively. | 6,000 | Cum | 60 ₹3,60,000 Lowest | 100 ₹6,00,000 | 100 ₹6,00,000 | 96 ₹5,76,000 |
| 4.00 | Supplying, stacking and levelling of good earth black or red soil at NFC Campus including the cost of excavation, loading, unloading at site, royality from outside and complete as directed by Engineer-in-charge including levelling, neatly dressing, rolling and watering as per specification (earth measured in stacks will be reduced by 20% for payment).
Note :- 1. Earth to be approved by EIC before supplying and shall be suitable for landscaping.
2. Earth to be dumped near the pipe rack or near the fire water line or near the drain and footpath as per the direction of EIC for spreadding mechanically or manually under those areas. | 20,000 | Cum | 500 ₹1,00,00,000 Lowest | 600 ₹1,20,00,000 | 1,050 ₹2,10,00,000 | 780 ₹1,56,00,000 |
| 5.00 | Plain/Reinforced Cement Concrete with Nominal Mix 1:1.5:3 using Portland Pozzolana Cement conforming to IS 1489 Part-1 (M/s. ACC, Ultra Tech, Raasi, Birla, Coromandal, Andhra Cements Ltd., KCP make) with river/ manufactured/robo sand and graded stone aggregates of 20mm maximum size at all depths/heights below/above plinth level including pumping, laying in proper line, slope, level, profile, consolidation, finishing smooth/broom finish as applicable, curing,etc., complete as specified and directed. | 120 | Cum | 4,500 ₹5,40,000 Lowest | 7,000 ₹8,40,000 | 5,600 ₹6,72,000 | 7,500 ₹9,00,000 |
| 6.00 | Providing centering and shuttering using 12mm thick marine plyboard at all depths and heights below and above plinth level, vertical, horizontal, inclined,circular including strutting, propping using steel pipes/acro stagging, removal, cleaning of the same for insitu reinforced cement concrete and in plain cement concrete work, pockets for machine/equipmet foundations as required including chamfers, splays, keys, wedges, nails, bracings, brackets and applying one coat of shuttering oil on all shuttering surfaces coming in contact with concrete etc., complete as directed.
Note :- Plywood shall not be used for more than eight repitions. | 1,000 | Sqm | 300 ₹3,00,000 Lowest | 450 ₹4,50,000 | 600 ₹6,00,000 | 400 ₹4,00,000 |
| 7.00 | Brick work using quality flyash bricks of class designation 7.5 or more conforming to IS 12894 using cement mortar 1:4 (1 cement :4 using crushed stone sand of grade conforming to BIS 2116) at all depths below/Above plinth level in foundation and in plinth, storm water drains, etc., simultaneous pointing with same mortar below ground level, and ranking out joints above ground level, curing,steel/ tubular scaffolding etc., complete as per specifications and as directed by E.I.C. | 100 | Cum | 5,200 ₹5,20,000 Lowest | 5,700 ₹5,70,000 | 6,000 ₹6,00,000 | 6,300 ₹6,30,000 |
| 8.00 | Cement plastering 15 mm thick for external walls using ready made plaster in cement mortar (1cement:4 Sand) of make M/s Enduraplast, Walplast, Ultratech or approved equivalent fininshed smooth at all height above plinth level over brick walls or concrete surface including making necessary grooves in between junctions or brick masonary and RCC , providing & fixing GI plaster mesh/chicken mesh 150 mm wide along route of walls chipped for service lines, junction between RCC and brick walls and also other places wherever required over brick walls or concrete surface, preparation of surface, hacking of surface, steel/tubular scaffolding curing etc., complete as specified and directed. | 1,200 | Sqm | 400 ₹4,80,000 | 300 ₹3,60,000 Lowest | 470 ₹5,64,000 | 360 ₹4,32,000 |
Tender Value
₹5.0 Cr
EMD Value
₹9.9 L
Closing Date
10 Jun 2026, 2:00 pmClosed
Chief Engineer and DCE (CED, PD and EP)
Civil Engineering Division, Nuclear Fuel Complex Hyderabad
Civil and allied works required for providing green belt at NFC-Kota plant, Rawatbhata.
2026_NFC_909982_1
C/1432/2026
Open Tender
Civil Works
Item Rate
365 days
NFC, Rwatbhata
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹9.9 L
Yes
24 Aug 2026
23 May 2026
11 Jun 2026
23 May 2026
10 Jun 2026
26 May 2026
23 May 2026 - 25 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of the rubbish including clearing of jungle and uprooting of rank vegetation, shrubs, bushes, trees upto 300mm girth measured 1.00 metre above ground level and in-equalities which includes removal/levelling of boulder/blasted/crushed rock upto a depth of 300mm under the pipe rack or under the fire water line or in between the drain and footpath or any other area inside the plant premises either mechanically or manually and disposal of rubbish up to a distance of 150 m outside the periphery of the area cleared as per the direction of EIC. | 34,000 | Sqm | - | - |
| 2Earth work in over areas/foundation/Pits/Trenches etc. by mechanical means (Hydraulic excavator) / manual means/controlled blasting to required profile, level, grade, camber, etc in all soils/strata as mentioned below upto 1.5meter depths, including dressing of excavated sides and ramming of bottoms and disposal / stacking of excavated materials within NFC campus for all leads and all inherent lifts and filling in layers with available earth in the NFC not exceeding 150m, watering, consolidation etc. complete all as per specifications, drawing and as directed by Engineer-in-charge. Note: Excavation to be done at certain distance for tree plantation, area grading or for any other purpose required as per the diection of EIC. | |||||
| 2.01 | Filled up rock/Boulders/Crushed rock/Soil | 2,800 | Cum | - | - |
| 2.02 | Hard rock (by chiselling or wedging or rock hammer and cutter or hydraulic splinter or controlled blasting/by using machine/ such as poclain with jack hammer or controlled blasting or by approved chemical method as directed by EIC. | 6,500 | Cum | - | - |
| 3 | Lead charges for all additional leads over the initial lead of 150 m by mechanical transport, including loading. unloading, stacking, the disposable soil, rock, debris etc within NFC Plant premises.
Note: measurement of lead charges wlll be based on truck measurement with a deduction of voids @ 20% and 50% for soils and rock/debris respectively. | 6,000 | Cum | - | - |
| 4 | Supplying, stacking and levelling of good earth black or red soil at NFC Campus including the cost of excavation, loading, unloading at site, royality from outside and complete as directed by Engineer-in-charge including levelling, neatly dressing, rolling and watering as per specification (earth measured in stacks will be reduced by 20% for payment).
Note :- 1. Earth to be approved by EIC before supplying and shall be suitable for landscaping.
2. Earth to be dumped near the pipe rack or near the fire water line or near the drain and footpath as per the direction of EIC for spreadding mechanically or manually under those areas. | 20,000 | Cum | - | - |
| 5 | Plain/Reinforced Cement Concrete with Nominal Mix 1:1.5:3 using Portland Pozzolana Cement conforming to IS 1489 Part-1 (M/s. ACC, Ultra Tech, Raasi, Birla, Coromandal, Andhra Cements Ltd., KCP make) with river/ manufactured/robo sand and graded stone aggregates of 20mm maximum size at all depths/heights below/above plinth level including pumping, laying in proper line, slope, level, profile, consolidation, finishing smooth/broom finish as applicable, curing,etc., complete as specified and directed. | 120 | Cum | - | - |
| 6 | Providing centering and shuttering using 12mm thick marine plyboard at all depths and heights below and above plinth level, vertical, horizontal, inclined,circular including strutting, propping using steel pipes/acro stagging, removal, cleaning of the same for insitu reinforced cement concrete and in plain cement concrete work, pockets for machine/equipmet foundations as required including chamfers, splays, keys, wedges, nails, bracings, brackets and applying one coat of shuttering oil on all shuttering surfaces coming in contact with concrete etc., complete as directed.
Note :- Plywood shall not be used for more than eight repitions. | 1,000 | Sqm | - | - |
| 7 | Brick work using quality flyash bricks of class designation 7.5 or more conforming to IS 12894 using cement mortar 1:4 (1 cement :4 using crushed stone sand of grade conforming to BIS 2116) at all depths below/Above plinth level in foundation and in plinth, storm water drains, etc., simultaneous pointing with same mortar below ground level, and ranking out joints above ground level, curing,steel/ tubular scaffolding etc., complete as per specifications and as directed by E.I.C. | 100 | Cum | - | - |
| 8 | Cement plastering 15 mm thick for external walls using ready made plaster in cement mortar (1cement:4 Sand) of make M/s Enduraplast, Walplast, Ultratech or approved equivalent fininshed smooth at all height above plinth level over brick walls or concrete surface including making necessary grooves in between junctions or brick masonary and RCC , providing & fixing GI plaster mesh/chicken mesh 150 mm wide along route of walls chipped for service lines, junction between RCC and brick walls and also other places wherever required over brick walls or concrete surface, preparation of surface, hacking of surface, steel/tubular scaffolding curing etc., complete as specified and directed. | 1,200 | Sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.84 MB
Biddocument4GCCSCC.pdf
Tender Documents • 1.19 MB
Bidderdeclaration.pdf
Tender Documents • 0.46 MB
Biddocument7_AERBControlofWorks.pdf
Tender Documents • 0.27 MB
Biddocument5TECHFORMSATOH.xls
Tender Documents • 0.08 MB
FinancialBidDocument.pdf
Tender Documents • 0.93 MB
BOQ_956396.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .