Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Finance | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | POWERLINK INFRASTRUCTURE L1 |
|---|---|---|---|---|
| 1.00 | Loading, Transporting and unloading of poles and associated materials from substore/vellore to Virinjipuram section work spot upto 8 kms | 19 | Per Pole | 2,300 ₹43,700 Lowest |
| 2.00 | Excavation and erection of 8.0m pole | 19 | Per Pole | 1,050 ₹19,950 Lowest |
| 3.00 | Excavation, erection of stay set complete for HT/LT pole | 17 | each | 1,000 ₹17,000 Lowest |
| 4.00 | Stringing of 7/2.50 AAAC size of conductor (circuit length as mentioned in sanction copy) | 1.16 | Per Km | 2,300 ₹2,661.1 Lowest |
| 5.00 | Stringing of 7/3.15 AAAC size of conductor (circuit length as mentioned in sanction copy) | 0.62 | Per Km | 2,500 ₹1,555 Lowest |
| 6.00 | Fixing of 3 Phase cross arm | 12 | each | 120 ₹1,440 Lowest |
| 7.00 | Fixing of 1 Phase cross arm | 19 | each | 80 ₹1,520 Lowest |
| 8.00 | Fixing of LT Pinwith Insulator | 12 | each | 30 ₹360 Lowest |
| 9.00 | Fixing of Alu Knob | 25 | each | 30 ₹750 Lowest |
| 10.00 | Fixing of LT Shackle | 46 | each | 50 ₹2,300 Lowest |
Tender Value
Refer Docs
Closing Date
24 Aug 2026, 2:00 pmClosed
EE Vellore
Gandhi Nagar Katpadi
Works Contract for Extension of supply works in HT LT feeders for erection poles ,transporting of poles, paving HT LT Line in various work orders in respect of Assistant Engineer O M Ussoor section in AEE O m Urban I Vellore Sub Division of Vellor
2026_EB_693484_1
EEVLR028
Limited
Electrical and Maintenance Works
Works
180 days
Ussoor
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
2 Sept 2026
12 Aug 2026
25 Aug 2026
12 Aug 2026
24 Aug 2026
12 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Loading, Transporting and unloading of poles and associated materials from substore/vellore to Virinjipuram section work spot upto 8 kms | 19 | Per Pole | - | - |
| 2 | Excavation and erection of 8.0m pole | 19 | Per Pole | - | - |
| 3 | Excavation, erection of stay set complete for HT/LT pole | 17 | each | - | - |
| 4 | Stringing of 7/2.50 AAAC size of conductor (circuit length as mentioned in sanction copy) | 1.16 | Per Km | - | - |
| 5 | Stringing of 7/3.15 AAAC size of conductor (circuit length as mentioned in sanction copy) | 0.62 | Per Km | - | - |
| 6 | Fixing of 3 Phase cross arm | 12 | each | - | - |
| 7 | Fixing of 1 Phase cross arm | 19 | each | - | - |
| 8 | Fixing of LT Pinwith Insulator | 12 | each | - | - |
| 9 | Fixing of Alu Knob | 25 | each | - | - |
| 10 | Fixing of LT Shackle | 46 | each | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BOQ_833805.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .