Construction of cement concrete road at house of babu bhai to waseem kirana in bari colony Prabhag no. 13(D)
2026_AMCA_1333128_1
CSMC/EE/WARDNO03/2026/297
Open Tender
Civil Works
Percentage
90 days
TOWN HALL CHHATRAPATI SAMBHAJINAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
₹8,354
29 Aug 2026
29 Aug 2026
7 Sept 2026
29 Aug 2026
4 Sept 2026
29 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 metres, stacking serviceable and unserviceable materials separately etc. complete. | - | M3 | 0.01 | - |
| 2 | Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as directed. | - | M3 | 315 | - |
| 3 | Conveying materials obtained from road cutting including all lifts, laying in layers of 20cm to 30cm. breaking clods, dressing to the required lines, curves, grades and section, watering and compacting to not less than 97% of standard Proctor density for a lead of over 50m. to 300m. inclusive from the site of excavation to | - | M3 | 412.65 | - |
| 4 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader / Paver on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 | 1 | M3 | 2,294.94 | ₹2,294.71 |
| 5 | Construction of dry lean cement concrete Sub-base overa prepared sub grade with coarse and fine aggregate (naturalsand / VSI grade finely was hed crushed sand conforming to IS:383, the size of coarse aggregate not exceeding 25 mm,, cement content not to belesst han 150 kg/cum, optimum moisture content to be determined during triallength construction, concrete strengt h not to beless than 10 Mpaat 7 days, mix edina batching plant / Weigh batch mixer, transported to site with all lead sand lifts, laid with a paver with electronic sensor/ by suitable means as approved by Engineer-in-charge,compacting with vibratory roller, finishing,curing and including preparation of sub aade surface if required ate | - | M3 | 4,289.83 | - |
| 6 | Providing and laying in-situ M30 Grade unreinforced plain cement concrete pavement over a prepared sub base with 43 grade cement, coarse and fine aggregate( natural sand/ VSI grade finely washed crushed sand) conforming to IS 383, using fine and coarse aggregates combined gradation as per Table 600-3 of MORTH Specification 2013, mixed in a batching and mixing plant non tilting mixer and Weigh batcher as per approved mix design, admixtures, transporting to site, spreading, laying with approved make paver, compacted and finished in a continuous operation, finishing to lines and arodas as directed by Engineer in charge and curing | - | M3 | 8,570.68 | - |
| 7 | Raising the existing manhole chamber with 23 cm thick brick work in cm 1:5 prop in 30 cm concentric cone including 12 mm thik cement plaster in CM 1:4 prop on both side complete. (As per rate analysis) No | - | No | 1,732.5 | - |
| 8 | Repairing to existing manhole chambers after fixing pipes with necessary brick works, benching, channeling, plastering etc. complete. (as per rate analysis | - | No | 1,375.5 | - |
| 9 | Fixing of SFRC frame and cover to manhole chamber / rectangular S.F.R.C. cover and frame in c.c. M-15 (concrete 1:2:4 prop) etc. complete (as per rate analysis) 22-circular HD 540/630 with frame. | - | No | 689.85 | - |
| 10 | Taking for Compressive strength of cement concrete 10 cube (Set of 3cubes) Etc Complete SSR Page No.387 Sr.no.25/2017-18. | - | No | 690 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
BOQ_2281227.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].