Loading…
Loading…
Tender Value
₹16.4 L
EMD Value
₹16,373
Closing Date
20 Jul 2026, 5:00 pm
Executive Officer,Kashinagar NAC
Executive Officer,Kashinagar NAC
Construction of 1st Floor of SKCG Market Complex
2026_ORULB_134833_6
KNGR/NAC/01/2026-27
Open Tender
Civil Works - Others
120 days
Kashinagar NAC
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
Executive Officer, Kashinagar NAC
₹16,373
Yes
9 Jul 2026
9 Jul 2026
23 Jul 2026
9 Jul 2026
20 Jul 2026
9 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in all kinds of soil within 50m initial lead and 1.5m initial lift as per the direction approved by the Department. | 36.46 | Cum | 312.13 | ₹11,380.26 |
| 2 | Supplying Filling sand in foundation with well Watered & Rammed including cost ,conveyance and royality of sand and cost of labour T&P etc. complete | 15.16 | Cum | 577.47 | ₹8,754.45 |
| 3 | CC (1:3:6) using 40 mm size CBHG Metal including cost of all materials labour ,T & P watering curing etc . Complete | 10.38 | Cum | 5,960.6 | ₹61,871.03 |
| 4 | Brick Masonary with Flyash Brick of size 23x11x8 in CM (1:6) in foundtion & Plinth comp. Per cum | 2.94 | Cum | 5,429.83 | ₹15,963.7 |
| 5 | CC (1:4:8) using 40 mm size CBHG Metal including cost of all materials labour ,T & P watering curing etc . Complete | 4.75 | Cum | 5,569.28 | ₹26,454.08 |
| 6 | Supplying,cutting ,bending ,binding and tying iron rods & placing uncoted HYSD bar reinforcement In position etc.comp. per Qtl. | 28.31 | Qtl | 9,271.92 | ₹2,62,488.06 |
| 7 | Reinforced Cement concrete M20 using 20mm down-graded HGCB chips | 28.31 | Cum | 6,450.43 | ₹1,82,611.67 |
| 8 | 2.5 cm thick A.S Flooring in CC (1:2:4) with 12mm size CBG chips | 58.76 | Sqm | 412.2 | ₹24,220.87 |
| 9 | Rigid & smooth centering shuttering for Rcc work including false work & dismantling after casting etc. comp. Per sqm (Wall Beam) | 72.34 | Sqm | 1,247.94 | ₹90,275.98 |
| 10 | Rigid & smooth centering shuttering for Rcc work including false work & dismantling after casting etc. comp. Per sqm (Grade beam) | 42.38 | Sqm | 249.83 | ₹10,587.8 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.64 MB
BOQ_600347.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid