Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹59.9 LAccepted-Finance 92 M DHARAMPUR DHARAMPUR SHAHPUR VILLAGE TOWN SHAHPUR CITY GORAKHPUR GORAKHPUR UTTAR PRADESH 273006 INDIA | GORAKHPUR | UTTAR PRADESH | 273006 | L1 | Accepted-Finance Quoted rate is lowest | |
| 2 | L2₹85.1 L+₹25.1 L (42.0%)Rejected-Finance | L2 | Rejected-Finance Quoted rate is on higher side |
Tender Value
Refer Docs
EMD Value
₹72,000
Closing Date
12 Aug 2025, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUPERINTENDING ENGINEER
ELECTRICITY TRANSMISSION CIRCLE, 220 KV SUB STATION GIDAHI BASTI
Dismantling and shifting of tower of 132 KV Bansi-Itwa and 132 KV Basti-Dumariyaganj lines on the bank of Rapti River near Dumariyaganj town under ETD-II, Basti H.Q. at Siddharth Nagar
2025_UPTCL_1060920_1
Short Term E-Tender No.18/ETC(B)/2025-26
Open Tender
Electrical Works
Lump-sum
90 days
220 KV SUB STATION GIDAHI BASTI
AS PER TENDER
2 documents required · 2 mandatory
₹1,770
UPSEB ELECTRICITY TRANSMISSION DIVISION BASTI
₹72,000
18 Aug 2025
29 Jul 2025
13 Aug 2025
29 Jul 2025
12 Aug 2025
29 Jul 2025
Amount
WORK Following works are to be carried out between Tower Location No- 91 to 101 of 132 KV S/C Bansi-Itwa line and Location no-141 to 151 of 132 KV S/C Basti-Dumariyaganj line as per technical specification with all cost of men material misc. consumable T&P Transpotation Loading /Unloading etc. for proper completion of work with care of safety and precaution as per instruction of the supervising Engineer
Anchoring by providing of stay on cross arm of 132 KV bansi-Itwa line at tower Location No. 91 and 101 before removal of old conductor including suitable fixing of stay rod by making C C Foundation and removal there of, after completion of work ( 1 Job per stay)
Anchoring by providing of stay on cross arm of 132 KV Basti -Dumariyaganj line at tower Location No. 141 and 151 before removal of old conductor including suitable fixing of stay rod by making C C Foundation and removal there of, after completion of work (1 Job per stay)
Safe dismantaling of all 3 phases of existing ACSR Panther conductor of 132 KV Bansi-Itwa line , including all Hardware fittings & conductor accessories e.g. armour rod , Vibration dampers ,insulator strings etc of existing line and re-rolling of dismantled conductor on empty drums for re-use,safely transportation of all removed material from Dismantaled place to 132 KV SS Itwa.
Safe dismantaling of all 3 phases of existing ACSR Panther conductor of 132 KV Basti-Dumariyaganj line , including all Hardware fittings & conductor accessories e.g. armour rod , Vibration dampers ,insulator strings etc of existing line and re-rolling of dismantled conductor on empty drums for re-use,safely transportation of all removed material from Dismantaled place to 132 KV SS dumariyaganj.
Safe dismantaling of Existing earthwire necessary hardware, Rerolling of Earthwire & safely transportation of all removed material from Dismantaled place to 132 KV SS Itwa of 132 KV Bansi-Itwa line. (between tower location 91 to 101)
Destringing of 24 fiber OPGW cable along with hardware fitting, joint box and its proper rolling of 132 KV Basti- Dumariyaganj line. (between tower location 141 to 151 )
Dismantaling of tower parts at location no-(92C+5,93C+10,94C+10,95C+5,96A+0,97A+0,98C+0,99A+0,100C+0) stacking of tower parts and all associated work ( Including necessary use of gas cutter for cutting of welded bolts & Nuts/ tower parts ) of 132 kv bansi-itwa line
Dismantaling of tower parts at location no-(142B+0,143C+5,144A+0,145C+0,146A+0,147A+0,148A+0,149C+0,150B+0) stacking of tower parts and all associated work ( Including necessary use of gas cutter for cutting of welded bolts & Nuts/ tower parts ) of 132 kv basti-dumariyaganj line.
Check Survey
Cost of excavation of 132 kv tower foundation pits including all earth work , back filling ,levelling etc
Setting of stub of 132 kv S/C tower including all foundation work , excluding the cost of concreting and excavation
132 KV DC/DE
Concreting of foundation with M20 grade cement concrete mixture in the ratio of 1:2:4 with 20mm stone metal for bottom pad, including cost of material Dewatering shoring ,shuttering , farming, curing etc. For 132 kv S/C Bansi-Itwa Line foundation.
Installation of steel reinforcement bars in R.C.C foundation Including cost of steel reinforcement bars with cutting, bending, placeing, binding etc.
Erection of supper structure of 132 kv Bansi-Itwa Line and its parts including all wrok above ground level excluding hoisting of insulator, hardware and accessories but including fitting of danger plates ,phase plate , number plates, bird guard and fixing & punching of bolts
Tack welding of all the bolts uo to the height of one section of the tower or 5 meter from ground level whichever is higher with three tacks at 1200 seperation of minimum 10 mm thickness with 10mm/12mm electrode & application of zinc rich alumiium paint on the affected surface including cost of all material including tack welding of angle towers
Laying, stringing, Tensioning, clamping , jointing etc of ACSR Panther conductor including hoisting of insulator , fitting of all necesory hardware and accessories .Fitting of armour rod, vibration damper etc between section tower location no-91 to 101.
Installation, laying, test & commissioning of links etc of 48 fibre (DWSM)OPGW Fibre optic cable alongwith all necessary hardware sets
Splicing & Installation of joint box 48 fibre
Grounding work including earth work etc for pipe type grounding including cost of coke & salt.
Carriage Work
Safe carriage of dismantled Tower Parts /remaining material from working site to 132 kv S/S Itwa on private vehicle arranged by the contractor including unloading of the same at site and proper Stacking at 132 KV SS Itwa. Including Measurement of Tower Weight on Nearest Dharamkata and Providing of its measurment reports.
Safe carriage of dismantled Tower Parts /remaining material from working site to 132 kv S/S Dumariyaganj on private vehicle arranged by the contractor including unloading of the same at site and proper Stacking at 132 KV SS dumariyaganj.Including Measurement of Tower Weight on Nearest Dharamkata and Providing of its measurment reports.
Supply
48 fibre (DWSM) OPGW Fibre optic cable
Number plate
Danger Plate
Phase plate
Bird gaurd
Earthing Material
Vibration damper
M S Joint
Repair sleeve and other Items
Single Tension Fitting For ACSR Panthar
Single Suspension Fitting For ACSR Panthar
Hardware for OPGW
Hardware set for 48 fibre (DWSM) OPGW
joint box (48 fibre)
Copper bond
Insulator 70 KN
Insulator 120 KN
P A Rod
MS RK ERACTORS (BID ID -5422598)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .