| 1 | L1₹18.9 LAccepted-AOC | ₹18.9 L Quoted ₹20.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹20.7 LRejected-AOC | ₹20.7 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | MSC ENTERPRISES | UDAYAPPA ENTERPRISES |
|---|---|---|---|---|---|
| 1.00 | Dismantling the existing doors & windows including removal of frames, hinges & fastenings, including cost of all materials, labours, lead, lift, devolution to stores, etc. complete | 37.8 | M2 | 6,388.2 ₹7,538.08 | 4,762.8 ₹5,620.10 |
| 2.00 | Dismantling the existing brick masonry for the required height including cost of all materials, labours, lead, lift, curing, etc. complete. | 1.29 | M3 | 478.59 ₹564.74 | 496.65 ₹586.05 |
| 3.00 | Dismantling the existing false ceiling with careful removal of Thermocoal aluminium grid of L and T angle the in its position including cost of all materials, labour, Lead, lift etc., complete. | 149.73 | M2 | 15,272.46 ₹18,021.50 | 15,871.38 ₹18,728.23 |
| 4.00 | Brick work in CM 1:5 using fly ash bricks including cost of all materials, labours, lead, lift, curing, etc. complete. | 8.51 | M3 | 57,791.41 ₹68,193.86 | 59,986.99 ₹70,784.65 |
| 5.00 | Clean removal of cement plaster from walls and providing Plastering with C.M 1:5, 12 mm thick including cost of all materials, labours, lead, lift, curing, etc. complete. | 140.42 | M2 | 42,828.1 ₹50,537.16 | 44,513.14 ₹52,525.51 |
| 6.00 | Providing shuttering arrangements for supporting the reinforced cement concrete surfaces rate including cost of all labour, lead, lift, etc., complete. | 14.63 | M2 | 7,885.57 ₹9,304.97 | 8,192.8 ₹9,667.50 |
| 7.00 | Providing RCC 1:1.5:3 using OP cement with 12mm to 20mm HBG metal including cost of all materials, labours, lead, lift, tools, curing, etc. complete - excluding cost of form work and reinforcement. | 3.06 | M3 | 30,394.98 ₹35,866.08 | 31,551.66 ₹37,230.96 |
| 8.00 | Supplying fabricating and fixing in position of RTS rod for reinforcement including cutting bending tying and fixing in position including cost of all materials, labour, binding wire, lead, lift, tools etc., complete. | 244.5 | Kg | 23,472 ₹27,696.96 | 24,450 ₹28,851 |
| 9.00 | Plastering with CM 1:5, 12mm thick including cost of all materials, labour, lead, lift etc., complete. | 86.83 | M2 | 25,701.68 ₹30,327.98 | 26,656.81 ₹31,455.04 |
| 10.00 | Terrace flooring (weathering course) with one course of pressed tiles 200 x 200 x 20mm over CM 1:3, 20mm thick mixed with crude oil 10% by weight of cement and pointing with the same oiled mortar over a bed of 80mm thick concrete broken brick jelly 20mm size in pure slaked lime with required slope over RCC roof slab including cost of all materials, labours, lead, lift, curing, etc. complete. | 265.75 | M2 | 4,56,824.25 ₹5.4 L | 4,74,363.75 ₹5.6 L |
Tender Value
Refer Docs
EMD Value
₹16,800
Closing Date
18 Aug 2025, 2:00 pmClosed
CE TTPS Thoothukudi
Office of the SE Civil TTPS Thoothukudi
Rectification works to the ESP 4 Building and Transformer Yard in Power House Unit 4 area
2025_EB_588937_1
CE SE C TTPS 205 2025 26
Open Tender
Civil Works - Others
60 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹16,800
Yes
7 Apr 2026
4 Aug 2025
19 Aug 2025
4 Aug 2025
18 Aug 2025
4 Aug 2025
Dismantling the existing doors & windows including removal of frames, hinges & fastenings, including cost of all materials, labours, lead, lift, devolution to stores, etc. complete
Dismantling the existing brick masonry for the required height including cost of all materials, labours, lead, lift, curing, etc. complete.
Dismantling the existing false ceiling with careful removal of Thermocoal aluminium grid of L and T angle the in its position including cost of all materials, labour, Lead, lift etc., complete.
Brick work in CM 1:5 using fly ash bricks including cost of all materials, labours, lead, lift, curing, etc. complete.
Clean removal of cement plaster from walls and providing Plastering with C.M 1:5, 12 mm thick including cost of all materials, labours, lead, lift, curing, etc. complete.
Providing shuttering arrangements for supporting the reinforced cement concrete surfaces rate including cost of all labour, lead, lift, etc., complete.
Providing RCC 1:1.5:3 using OP cement with 12mm to 20mm HBG metal including cost of all materials, labours, lead, lift, tools, curing, etc. complete - excluding cost of form work and reinforcement.
Supplying fabricating and fixing in position of RTS rod for reinforcement including cutting bending tying and fixing in position including cost of all materials, labour, binding wire, lead, lift, tools etc., complete.
Plastering with CM 1:5, 12mm thick including cost of all materials, labour, lead, lift etc., complete.
Terrace flooring (weathering course) with one course of pressed tiles 200 x 200 x 20mm over CM 1:3, 20mm thick mixed with crude oil 10% by weight of cement and pointing with the same oiled mortar over a bed of 80mm thick concrete broken brick jelly 20mm size in pure slaked lime with required slope over RCC roof slab including cost of all materials, labours, lead, lift, curing, etc. complete.
Supplying and fixing wash basin of size 550 x 400mm with all accessories such as cast iron brackets, 32 mm dia C.P waste coupling, rubber plug & chain, 32mm dia. B class G.I wasre pipe, 15mm dia. G.M wheel valve, 15mm dia neylon connection, 15mm dia. brass nipples, 15mm C.P pillar tap, mirror including cost of all materials, labours, lead, lift, curing, etc. complete.
Providing and fixing in position of Aluminium anodized glazed double leaf door with inner frame section using 45 x 45 x 2mm for top and middle and vertical, door frame section using 100 x 45 x 2mm for door and shutter bottom with 5mm thick plain glass with sun control film on top and bottom using aluminum anodized beading with all necessary standard hardware such as handle, tower bolts, safety rod with full thread locking arrangement etc., complete including cost of all materials, labour, lead, lift etc., complete.
Providing and fixing in position of new anodised aluminium windows of approved manufacture with aluminium 65x38x2.50 mm as main outer frame and inner frame with section 62x30x1.50 mm for top sides and bottom and shutter frame with section 39x19x1.50 mm for vertical plain inter lock and bottom etc including all fittings/ fixture confirming to relevant IS to ensure smooth operation and glazed with 4 mm plain glass panels as sliding type as per instruction's of site Engineer, rubber lining with standard hardwares such as special wheel maruthi lock 'U' Rubber beading screws, join cleats etc., including cost of all material, lead lift, transporting including the dismantling existing broken glasses and damaged Aluminium shutter from the window and devoluting the same to the stores etc., complete.
Providing false ceiling with Thermocool 25mm thick over the Aluminium section 25 x 25 x 1.6 mm (T & L angle) with 50cm c/c in one direction 100cm c/c in another direction with 6mm dia M.S. rod as stiffner at a distance of 1.25m c/c including cost of all materials, labour, lead, lift, scaffolding charges etc., complete.
Providing PCC 1:4:8 using OP/PP cement with 20mm size machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete.
Supplying laying and jointing in position of 25mm dia GI pipes ('B' Class) as instructed by the site Engineer rate including cost of all materials, labour, lead, lift etc., complete.
Removing the spalled/distressed concrete for an average thickness of 50mm including disposal of debris with a lead of 1km and roughening the surface thoroughly with Reebaklens fosroc acid/ equivalent with all lead, lift, labour, etc., complete.
Supplying, cutting, bending & tying in position secondary reinforcement wherever using GI weld mesh of size 75 X 50 mm 10gauge to the existing concrete surface prepared as per specification including transporting, fabricating bending & tying in position as per the engineer at site including cost of all materials labours, lead, lift, etc., complete.
Micro Concrete for RCC Column with shuttering a) Applying One coat of Nito Zinc/equivalent primer after thorough cleaning of rust in the reinforcement rate including cost of all materials, labour, lead, lift etc., complete as directed by the engineer at site. B) Providing fabricating and erecting slurry tight form work with plywood shutters with suitable supports, which do not deform due to micro concrete including cost of all materials, labours, lead, lift, etc., complete as directed by the engineer at site. C) Providing micro concrete Rendroc RG (or) equivalent as per manufacture's specifications. This mixed micro concrete should be placed continuously for an average thickness of 75mm including cost of all materials, labours, lead, lift, etc., complete as directed by the engineer at site. d)Applying one coat of polymer modified Acrylic Emulsion (Nito bond AR or equivalent) on the finished concrete surfaces as a curing membrane including cost of all materials, labours, lead, lift, etc., complete as directed by the engineer at site.
Providing two legged scaffolding at different elevations using 10-13 cm dia casuarina props, the distance between the two rows being 1.25m and the spacing of posts being 2m in both the rows with two horizontal posts with 0.5m overlap on either side and braces at 2m c/c including longitudinal & transverse middle braces to step up and providing a platform with country wood planks of 40 mm thick & 1m width, etc. complete using coir and nails.
Supplying and fixing in position of 160mm dia PVC pipe of 4 Kg/Sqm (ISI Mark) pressure Pipe approved dept. Engineer with the necessary PVC specials, clamps, bolts & Nuts by replacing the existing damaged/ broken C.I. pipe water down fall pipes including cost of all materials, labour, lead, lift, tools etc., complete.
Providing two coats with ready mixed plastic emulsion (interior walls) of first class quality paint & approved colour including cost of all materials, scaffolding charges, thorough cleaning of surface, labours, lead, lift, curing, etc. complete.
Providing two coats with ready mixed plastic emulsion (exterior walls) of first class quality paint & approved colour over a priming coat including cost of all materials, labour, lead, lift, etc. complete.
Providing two coats of anticorrosive black paint to the newly plastered surface over a one coat of primer, including cost of all materials, labour, lead, lift etc., complete
stage.html
html • 0.04 MB
techsummary_703557.pdf
BOQ Comparative Chart
xlsx
finsummary_703557.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
BOQ_703557.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid