Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.5 LAccepted-Finance | ₹26.5 L | L1 | Accepted-Finance AS per BOQ comparative |
| 2 | L2₹31.6 L+₹5.2 L (19.5%)Accepted-Finance SHAYOK | LEH LADAKH | LADAKH | 194101 | ₹31.6 L+₹5.2 L (19.5%) | L2 | Accepted-Finance AS per BOQ comparative |
| 3 | L3₹36.0 L+₹9.5 L (36.0%)Accepted-Finance | ₹36.0 L+₹9.5 L (36.0%) | L3 | Accepted-Finance AS per BOQ comparative |
| 4 | L4₹46.2 L+₹19.8 L (74.6%)Accepted-Finance | ₹46.2 L+₹19.8 L (74.6%) | L4 | Accepted-Finance AS per BOQ comparative |
| 5 | Not Admitted-Fee/PreQual/Technical S O TUNDUP TSEWANG R O HEMISHUKPACHAN LADAKH UT | KARGIL | LADAKH | 194102 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹48.7 L
EMD Value
₹1.1 L
Closing Date
10 Aug 2026, 4:00 pmClosed
Executive Engineer InFC division Leh
Office of the Executive Engineer InFC division Leh
Construction of irrigation canal Farkhathang Shayok (by way of PCC Channel in M-10 mix, stone pitching, M10 mix lining and by way of steel manual gates.(Under BADP)
2026_PWD_19167_5
18 of I and FC Division Leh 2026-27
Open Tender
Civil Works - Canal
Percentage
90 days
LEH
Please refer to tender document
3 documents required · 3 mandatory
₹2,000
Yes
Payable To Executive Engineer InFC division Leh
₹1.1 L
18 Aug 2026
1 Aug 2026
12 Aug 2026
1 Aug 2026
10 Aug 2026
1 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) in
foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),
including dressing of sides and ramming of bottoms, lift upto 1.5 m, including
getting out the excavated soil and disposal of surplus excavated soil as directed,
within a lead of 50 m.
A. All kinds of soil 85%. | 1,937.81 | Cum | 278.09 | ₹5,38,885.58 |
| 2 | B. Ordinary rock 15%. | 341.97 | Cum | 504.48 | ₹1,72,517.03 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) over areas
(exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including
getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as
directed by Engineer-in-charge. | 38.25 | Cum | 208.42 | ₹7,972.07 |
| 4 | Dumping stone including cost of stones in Horizontal on level | 63.53 | Cum | 953.02 | ₹60,545.36 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 42.35 | Cum | 5,725.33 | ₹2,42,467.73 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 214.84 | Cum | 6,606.07 | ₹14,19,248.08 |
| 7 | Providing and laying in-situ concrete lining using M-10 nominal mix concrete
(max. size of aggregates: 20mm nominal).
A. In beds | 25.2 | Cum | 6,642.88 | ₹1,67,400.58 |
| 8 | B. Side slope. | 40.8 | Cum | 7,081.12 | ₹2,88,909.7 |
| 9 | Steel work welded in built up sections/ framed work, including cutting, hoisting,
fixing in position and In stringers, treads, landings etc. of stair cases, including use of chequered plate wherever required, all | 236.98 | Kg | 146.29 | ₹34,667.8 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for : A.Foundations, footings, bases for columns. | 255.09 | Sqm | 306.15 | ₹78,095.8 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_45879.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .