| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.8 LAccepted-AOC GANGASAGAR PO SAGAR | L1 | Accepted-AOC L1 | |
| 2 | L2₹15.0 L+₹12,752.30 (0.86%)Rejected-Finance VILL P O GANGASAGAR | L2 | Rejected-Finance Higher than L1 | |
| 3 | L3₹15.0 L+₹15,325.30 (1.03%)Rejected-Finance 11A MUKHERJEE PARA LANE KOLKATA 700026 | KOLKATA | KOLKATA | WEST BENGAL | 700026 | L3 | Rejected-Finance Higher than L1 |
Tender Value
Refer Docs
EMD Value
₹21,000
Closing Date
16 Dec 2024, 11:00 amClosed
Executive Engineer SMD PHE Dte
Chetla , Kolkata
Reparing of 12 (twelve) nos Telescopic type Tilting Mobile High Mast at Ganga Sagar Mela Ground in connection with Ganga Sagar Mela-2025
2024_PHED_772024_9
WBPHE/EE/SMD/NIeT-57 of 2024-25
Open Tender
Miscellaneous Works
Item Rate
35 days
Sagar Island
Please refer Tender documents.
6 documents required · 6 mandatory
₹21,000
3 Apr 2025
2 Dec 2024
18 Dec 2024
2 Dec 2024
16 Dec 2024
2 Dec 2024
Amount
N.B:-All Quoted Rates are inclusive of GST @ 18% + CESS @ 1%
Dismantling of Telescopic type Tilting Mobile High Mast & find out the fault for proper operation at Sagar Mela Ground as per direction.
Supply & delivery of the following materials as per sample:-
8 SWG stranded steel rope
MS shaft for above roller(dia- 20mm, length-105mm with both end lock pin hole-3mm dia) with lock pin set
8mm SWG wire "U" clamp
750-16 tyre -tube-flap
750-16 wheel rim
Superior quality Grease
Superior quality gear oil
Re-assemblying of the High Mast by using the supplied materials as in item above for proper operation of the system.
Dismantling of the step motor from the unit, rewinding and connected with the high mast unit.
Dismantling of the step motor from the unit, heat vernish and connected with the high mast unit.
Dismantling of the gearbox unit from the trolley
Cleaning ,Overhauling , greasing , lubricating of the inner spare of the gearbox unit includig dismantling part by part with reassembling the same all complete
Fitting-fixing of the gearbox unit to the trolley with proper allignment all complete
Supply & delivery of the following materials as per sample:-
MS plate for pedastral base : 250mm x 250mm x 10mm(t) = 6 pcs ( wt. approx 44.15 kg ) for each trolley of 12 units
MS hollow pipe : A } 100mm x 100mm = 11 ft x 4pcs + 8ft x 2 pcs ;; B } 75mm x 75mm = 13 ft x 1 pc. ;;;; [ Total A + B = 65 ft - wt. approx 204.8 kg for each trolley of 12 units
Fitting-fixing charges of the supplied base plate to the trolley units pedastral balancing unit including welding, jointing , cleaning of rough surface , hiring of welding machine with welder-helper , cutting of damaged portion etc all complete
Fitting-fixing charges of the supplied MS hollow pipe to the trolley units pedastral balancing unit including welding, jointing , cleaning of rough surface , hiring of welding machine with welder-helper , cutting of damaged portion etc all complete
Supply-delivery-fitting-fixing of the pedastral leg lock unit with nut bolts all complete ; [ 6 nos. for each trolley unt ]
Painting redoxide and black paint to the pedestral unit including cleaning of rough surface , derusting etc all complete
Making internal Illumination of 42 Nos Departmental Bio Toilet Units by LED chain light and allied works at Ganga Sagar Mela Ground in connection with Ganga Sagar Mela -2025
Supply of decorative LED chain light for pole decoration on hire basis for 07-01-2025 to 16-01-2025
Supply of 2 x 2.5 sq. mm. and 1 x 1.5 sq. mm. PVC insulated single core copper wire for connection of chain light on hire basis
Supply of LED adaptor for the LED chain light as per direction
Supply of 10 AMP DPMCB with enclosure
Labour charges for installation of chain light arrangement for Bio Toilet Illumination with connection of DPMCB as per direction
Nimpith Asram
Withdrawing the Hand TW sets from the existing TW and carrying with stored at PHE Bunglow site store including loading and unloading as per direction
Transportation charges of Departmental 1 HP cora Pump with Column pipe etc from PHE Bunglow site store to Nimpith Asram including loading and unloading as per direction
Lowering the Departmental 1 HP cora Pump with Column pipe etc at the TW taken with all precaution all complete.
Labour charges for operation of the pumping machinery as and when required from 08-01-2025 to 16-01-2025
Withdrawing the Departmental cora pump with Column pipe etc from the existing TW and carrying back with stored at PHE Bunglow site store including loading and unloading as per direction after completation of Mela
Transportation charges of Withdrawn Hand TW from PHE Bunglow site store to Nimpith Asram including loading and unloading as per direction
SUDIP PRADHAN (BID ID -5859092)
MS BABUSONA ENTERPRISE (BID ID -5859050)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .