Salem District - Ayothiyapattnam Block - Construction of Public Toilet at AnnaNagar Area H/O D.Perumapalayam in 15th CFC 2023-2024 Work No. 01.
2023_RDTN_356561_1
1230/2023/A2
Open Tender
Civil Works
Item Rate
180 days
BDO BP Ayothiyapattnam
AS on below
2 documents required · 2 mandatory
₹0
₹6,500
BDO BP Ayothiyapattnam
24 Aug 2023
8 Aug 2023
14 Aug 2023
8 Aug 2023
14 Aug 2023
8 Aug 2023
8 Aug 2023
Amount
Construction of Public Toilet at AnnaNagar Area H/O D.Perumapalayam
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement per SS 20 A.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation
Random Rubble Masonry in cement Mortar 1 : 5 for foundation and basement including necessary provision for Bond stones with simultaneous flush pointing with the same mortar above ground level complying with standard specifications.
Filling in Basement with excavated Earth in layers of not more than 15cm. Thick well rammed, watered and consolidated complying with standard specifications etc., complete.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Supplying & Erecting centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification
Cement concrete 1:11/2:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
Supplying and fixing of Indian type water closet including all charges etc.
Supplying and fixing of Europian type water closet including all charges etc.
PLASTERING with cement mortar 1:4 mix 20mm thick in all floors complying with standard specifications
Finishing the exposed surface of RCC item of work such as slabs, beams, sunshade, facia, canopy slab, staircase waist slab, landing slab etc., with CM 1:3, 10mm thick including raking the surface
Plastering with CM 1:5, 12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Distempering two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
Exterior emulsion two coats using best freshly burnt shell lime in all the floors using best quality & approved variety of colouring pigments including cost of lime, colouring pigment, Fevicol type gum, brushes,scaffolding charges etc., complete
Painting two coats over new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SM Bricks & Constructions
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .