Loading…
Loading…
| Sl No | Description | Qty | Unit | MADASAMY L2 | K MURUGAN L1 |
|---|---|---|---|---|---|
| 1.00Providing CC road pavement at Uganthanpatti in Pudur Panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lift of 2m in hard stiff clay cotton soil , hard red earth ,earth mixed wit small sized boulders and hard gravelly soil as per SS 20B | 22.68 | Cum | 197.84 ₹4,487.01 | 197.83 ₹4,486.78 Lowest |
| 3.00 | C.C. 1:4:8 mix using 40mm metal including cost and conveyance of all materials to site and all labour charges etc., complete | 64.76 | Cum | 5,376.76 ₹3,48,198.98 | 5,376.75 ₹3,48,198.33 Lowest |
| 4.00 | Supply and erection of Centerin shuttering including necessary support for plane surface in foundation and basement and in all floor for RCC colum footing colum plinth beam , beams roof slab, staircase steps,bed block , critical pier etc using mild steel sheets of 90x60 cm and 10 guage including conveyance of all materials to site and proper centering etc complete. | 151.2 | Sqm | 365 ₹55,188 Lowest | 365 ₹55,188 Lowest |
| 5.00 | C.C. 1:3:6 mix using 20mm metal including cost and conveyance of all materials to site and all labour charges etc., complete | 17.39 | Cum | 6,127.81 ₹1,06,562.62 | 6,127.8 ₹1,06,562.44 Lowest |
| 6.00 | C.C. 1:2:4 mix using 20mm metal including cost and conveyance of all materials to site and all labour charges etc., complete | 47.25 | Cum | 6,667.81 ₹3,15,054.02 | 6,667.8 ₹3,15,053.55 Lowest |
| 7.00 | Supply and fixing Tarpat | 9.38 | Sqm | 234.3 ₹2,197.73 | 234.29 ₹2,197.64 Lowest |
Tender Value
₹9.9 L
EMD Value
₹9,950
Closing Date
1 Mar 2026, 3:00 pmClosed
BDO (B.Pt.)
Panchayat Union, Manur.
CC Road
2026_RDTN_667595_1
A2/5647/2025
Open Tender
Civil Works - Roads
Item Wise
180 days
Manur
Refer Tender Doc
2 documents required · 2 mandatory
₹0
₹9,950
26 May 2026
27 Feb 2026
1 Mar 2026
27 Feb 2026
1 Mar 2026
27 Feb 2026
Providing CC road pavement at Uganthanpatti in Pudur Panchayat
Earth work excavation and depositing on bank with in initial lift of 2m in hard stiff clay cotton soil , hard red earth ,earth mixed wit small sized boulders and hard gravelly soil as per SS 20B
C.C. 1:4:8 mix using 40mm metal including cost and conveyance of all materials to site and all labour charges etc., complete
Supply and erection of Centerin shuttering including necessary support for plane surface in foundation and basement and in all floor for RCC colum footing colum plinth beam , beams roof slab, staircase steps,bed block , critical pier etc using mild steel sheets of 90x60 cm and 10 guage including conveyance of all materials to site and proper centering etc complete.
C.C. 1:3:6 mix using 20mm metal including cost and conveyance of all materials to site and all labour charges etc., complete
C.C. 1:2:4 mix using 20mm metal including cost and conveyance of all materials to site and all labour charges etc., complete
Supply and fixing Tarpat
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
BOQ_802016.xls
BOQ • 1.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].