Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹5.8 L
Closing Date
7 Mar 2025, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DIRECTOR
National Institute of Ocean Technology NIOT Campus Palikkaranai Chennai 600100
As Per SCC of NIT document
2025_NIOT_849709_1
NIOT/SnP/SnGH/100162/2024-25
Single
Miscellaneous Goods
Item Rate
360 days
NIOT
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5.8 L
7 Mar 2025
18 Feb 2025
7 Mar 2025
18 Feb 2025
7 Mar 2025
4 Mar 2025
Annual Maintenance Contract (AMC) for PBOF Lithium Polymer Batteries of Manned Submersible for Three Years
Service Technical Assistance by M/s. ICTINEU for the 1st year (To be quoted in Euro)
Remote Technical Assistance for Periodic Battery Inspection – 1, as specified in SCC 3.3, for the items covered under AMC (SCC 3.1), by M/s. OEM M/s. ICTINEU Submarins SL. Inspection Period: 8 days (8 hours/day), tentative
Remote Technical Assistance for Periodic Battery Inspection – 2, as specified in SCC 3.3, for the items covered under AMC (SCC 3.1), by M/s. OEM M/s. ICTINEU Submarins SL. Inspection Period: 8 days (8 hours/day), tentative.
Remote Technical Assistance for Periodic Battery Inspection –3, as specified in SCC 3.3, for the items covered under AMC (SCC 3.1), by M/s. OEM M/s. ICTINEU Submarins SL. Inspection Period: 8 days (8 hours/day), tentative.
A) Attending Major Issues & Replacement of Battery System Parts by M/s. ICTINEU (Covers Junction BOX, Pressure Compensators, Pressure Relief Mechanisms, Chargers) (It will be used upto 10 days depending upon the requirement time to time)
B) Travel charges (1 round trip Barcelona-Chennai- Barcelona). Includes Flight, visa, hotel, logistics expenses. (Travel days will be charged extra as per day rate) (It will be used 2 times per year depending upon the requirement basis)
Any other Remote Consultancy Support - By the OEM M/s. ICTINEU beyond 200 Hrs (To be utilized based on requirement basis)
Service Inspection by M/s. Samhitha Marine Pvt Ltd for the 1st year (To be quoted in INR with GST)
Periodic Battery Inspection – 1, as specified in SCC 3.2, for the items covered under AMC (SCC 3.1), by M/s. Samhitha Marine Private Limited.
Periodic Battery Inspection – 2, as specified in SCC 3.2, for the items covered under AMC (SCC 3.1), by M/s. Samhitha Marine Private Limited.
Periodic Battery Inspection – 3, as specified in SCC 3.2, for the items covered under AMC (SCC 3.1), by M/s. Samhitha Marine Private Limited.
Trial Support Onboard NIOT Vessel/harbour/lake Trials/minor repair by M/s. Samhitha marine. Minor repairs would be attended by M/s. Samhitha Marine with remote consultancy service from OEM. (It will be used upto 20 days depending upon the requirement time to time)
Service Technical Assistance by M/s. ICTINEU for the IInd year (To be quoted in Euro)
Remote Technical Assistance for Periodic Battery Inspection – 1, as specified in SCC 3.3, for the items covered under AMC (SCC 3.1), by M/s. OEM M/s. ICTINEU Submarins SL. Inspection Period: 8 days (8 hours/day), tentative
Remote Technical Assistance for Periodic Battery Inspection – 2, as specified in SCC 3.3, for the items covered under AMC (SCC 3.1), by M/s. OEM M/s. ICTINEU Submarins SL. Inspection Period: 8 days (8 hours/day), tentative.
Remote Technical Assistance for Periodic Battery Inspection –3, as specified in SCC 3.3, for the items covered under AMC (SCC 3.1), by M/s. OEM M/s. ICTINEU Submarins SL. Inspection Period: 8 days (8 hours/day), tentative.
Attending Major Issues & Replacement of Battery System Parts by M/s. ICTINEU (Covers Junction BOX, Pressure Compensators, Pressure Relief Mechanisms, Chargers) (It will be used upto 10 days depending upon the requirement time to time)
Travel charges (1 round trip Barcelona-Chennai- Barcelona). Includes Flight, visa, hotel, logistics expenses. (Travel days will be charged extra as per day rate) (It will be used 2 times per year depending upon the requirement basis)
Any other Remote Consultancy Support - By the OEM M/s. ICTINEU beyond 200 Hrs (To be utilized based on requirement basis)
Service Inspection by M/s. Samhitha Marine Pvt Ltd for the IInd year (To be quoted in INR with GST)
Periodic Battery Inspection – 1, as specified in SCC 3.2, for the items covered under AMC (SCC 3.1), by M/s. Samhitha Marine Private Limited.
Periodic Battery Inspection – 2, as specified in SCC 3.2, for the items covered under AMC (SCC 3.1), by M/s. Samhitha Marine Private Limited.
Periodic Battery Inspection – 3, as specified in SCC 3.2, for the items covered under AMC (SCC 3.1), by M/s. Samhitha Marine Private Limited.
Trial Support Onboard NIOT Vessel/harbour/lake Trials/minor repair by M/s. Samhitha marine. Minor repairs would be attended by M/s. Samhitha Marine with remote consultancy service from OEM. (It will be used up to 20 days depending upon the requirement time to time)
Service Technical Assistance by M/s. ICTINEU for the 3rd year (To be quoted in Euro)
Remote Technical Assistance for Periodic Battery Inspection – 1, as specified in SCC 3.3, for the items covered under AMC (SCC 3.1), by M/s. OEM M/s. ICTINEU Submarins SL. Inspection Period: 8 days (8 hours/day), tentative.
Remote Technical Assistance for Periodic Battery Inspection – 2, as specified in SCC 3.3, for the items covered under AMC (SCC 3.1), by M/s. OEM M/s. ICTINEU Submarins SL. Inspection Period: 8 days (8 hours/day), tentative.
Remote Technical Assistance for Periodic Battery Inspection –3, as specified in SCC 3.3, for the items covered under AMC (SCC 3.1), by M/s. OEM M/s. ICTINEU Submarins SL. Inspection Period: 8 days (8 hours/day), tentative.
A) Attending Major Issues & Replacement of Battery System Parts by M/s. ICTINEU (Covers Junction BOX, Pressure Compensators, Pressure Relief Mechanisms, Chargers) (It will be used upto 10 days depending upon the requirement time to time)
B) Travel charges (1 round trip Barcelona-Chennai- Barcelona).Includes Flight, visa, hotel, logistics expenses. (Travel days will be charged extra as per day rate) (It will be used 2 times per year depending upon the requirement basis)
Any other Remote Consultancy Support - By the OEM M/s. ICTINEU (To be utilized based on requirement basis)
Service Inspection by M/s. Samhitha Marine Pvt Ltd for the 3rd year (To be quoted in INR with GST)
Periodic Battery Inspection – 1, as specified in SCC 3.2, for the items covered under AMC (SCC 3.1), by M/s. Samhitha Marine Private Limited.
Periodic Battery Inspection – 2, as specified in SCC 3.2, for the items covered under AMC (SCC 3.1), by M/s. Samhitha Marine Private Limited.
Periodic Battery Inspection – 3, as specified in SCC 3.2, for the items covered under AMC (SCC 3.1), by M/s. Samhitha Marine Private Limited.
Trial Support Onboard NIOT Vessel/harbour/lake Trials/minor repair by M/s. Samhitha marine. Minor repairs would be attended by M/s. Samhitha Marine with remote consultancy service from OEM. (It will be used up to 20 days depending upon the requirement time to time)
US Dollar
European Euro
British Pound
Norwegian Kroner
Portion of Quoted Rate in Currency
US Dollar
European Euro
British Pound
Norwegian Kroner
Portion of Quoted Rate in Currency
Items 13
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .