Loading…
Loading…
Tender Value
₹1.8 L
EMD Value
₹1,750
Closing Date
10 Sept 2026, 3:00 pm
Block Development Officer (BP)
Block Development Officer (BP), Vathalgundu
Repairs and Renovation of Anganwadi Building Sengattampatti HO Sengattampatti
2026_RDTN_697497_1
TN05-02-SFC DP
Open Tender
Civil Works
Item Wise
60 days
Union office, Vathalagundu
Repairs and Renovation of Anganwadi Building Sengattampatti HO Sengattampatti
3 documents required · 3 mandatory
₹0
₹1,750
Yes
24 Aug 2026
24 Aug 2026
10 Sept 2026
24 Aug 2026
10 Sept 2026
24 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1 | Name of the work:Repair and Renovation of Anganwadi Building at Sengattampatti H/O Sengattampatti. Est Amount: 1,75,000/- | - | - | - | - | - |
| 2 | Removing and clearing the damaged plastering surface including cost and conveyance of all materials to site and all labour charges etc complete | 18.24 | sqm | 65 | ₹1,185.6 | 18% |
| 3 | Removing clearing away and carefully stacking materials for Pressed tiles including all charges etc., complete | 39.84 | sqm | 65 | ₹2,589.6 | 18% |
| 4 | Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers(10%) | 39.84 | sqm | 65 | ₹2,589.6 | 18% |
| 5 | Pointing for RR Masonry with CM1:3 Mix Including all charges | 9.05 | sqm | 65 | ₹588.25 | 18% |
| 6 | Plastering with Cement Mortar 1:5 (One cement and Five P.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 9.19 | sqm | 65 | ₹597.35 | 18% |
| 7 | Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer | 127.17 | sqm | 65 | ₹8,266.05 | 18% |
| 8 | Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358 | 131.98 | sqm | 75 | ₹9,898.5 | 18% |
| 9 | Painting two coats with approved Black Oxide for Old Black board including all Charges | 13.44 | sqm | 65 | ₹873.6 | 18% |
| 10 | Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) | 13.32 | sqm | 65 | ₹865.8 | 18% |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
Tendernotice_2.pdf
PDF • 1.57 MB
BOQ_838529.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].