Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹76,000
Closing Date
22 Jul 2022, 3:00 pmClosed
ADDITIONAL COLLECTOR (D) MADURAI
0/0 ADDITIONAL COLLECTOR (D) DRDA MADURAI
Providing Interlocking CC Paver blocks and other improvements to the Streets and Lanes _13 nos. in AGAMT-II-2021-22 Village panchayats of Sedaptti Block in Madurai District in Package no. Sed_02
2022_RDTN_238767_2
568/2022/D7 /sed02/24.06.22
Open Tender
Civil Works
Item Rate
180 days
sedapatti
REFER TENDER DOCUMENT
4 documents required · 4 mandatory
₹0
₹76,000
1 Aug 2022
5 Jul 2022
22 Jul 2022
5 Jul 2022
22 Jul 2022
6 Jul 2022
Amount
Earth work excavation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,SS 20 B
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Plain Cement concrete 1:3:6 mix using 20 mm HBGS including cost and conveyance of all materials to site and all labour charges etc complete
Constn. Of Granular sub base by providing well graded materials (25 mm to 4.75 mm IRC HBG metal @ 65 % , 4.75 to 2.36 mm IRC HBG metal @ 20%, and 2.36 mm below IRC HBG including cost and conveyance and all labour charges etc complete
Providing and Laying of Interlocking Concrete (Surface Textured) Block Pavements having thickness 60mm and compacted including cost and conveyance and all labour charges etc complete
Towards Name board
Earth work excavation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,SS 20 B
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Plain Cement concrete 1:3:6 mix using 20 mm HBGS including cost and conveyance of all materials to site and all labour charges etc complete
Constn. Of Granular sub base by providing well graded materials (25 mm to 4.75 mm IRC HBG metal @ 65 % , 4.75 to 2.36 mm IRC HBG metal @ 20%, and 2.36 mm below IRC HBG including cost and conveyance and all labour charges etc complete
Providing and Laying of Interlocking Concrete (Surface Textured) Block Pavements having thickness 60mm and compacted including cost and conveyance and all labour charges etc complete
Towards Name board
Earth work excavation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,SS 20 B
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Plain Cement concrete 1:3:6 mix using 20 mm HBGS including cost and conveyance of all materials to site and all labour charges etc complete
Constn. Of Granular sub base by providing well graded materials (25 mm to 4.75 mm IRC HBG metal @ 65 % , 4.75 to 2.36 mm IRC HBG metal @ 20%, and 2.36 mm below IRC HBG including cost and conveyance and all labour charges etc complete
Providing and Laying of Interlocking Concrete (Surface Textured) Block Pavements having thickness 60mm and compacted including cost and conveyance and all labour charges etc complete
Towards Name board
Earth work excavation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,SS 20 B
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Plain Cement concrete 1:3:6 mix using 20 mm HBGS including cost and conveyance of all materials to site and all labour charges etc complete
Constn. Of Granular sub base by providing well graded materials (25 mm to 4.75 mm IRC HBG metal @ 65 % , 4.75 to 2.36 mm IRC HBG metal @ 20%, and 2.36 mm below IRC HBG including cost and conveyance and all labour charges etc complete
Providing and Laying of Interlocking Concrete (Surface Textured) Block Pavements having thickness 60mm and compacted including cost and conveyance and all labour charges etc complete
Towards Name board
Earth work excavation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,SS 20 B
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Plain Cement concrete 1:3:6 mix using 20 mm HBGS including cost and conveyance of all materials to site and all labour charges etc complete
Constn. Of Granular sub base by providing well graded materials (25 mm to 4.75 mm IRC HBG metal @ 65 % , 4.75 to 2.36 mm IRC HBG metal @ 20%, and 2.36 mm below IRC HBG including cost and conveyance and all labour charges etc complete
Providing and Laying of Interlocking Concrete (Surface Textured) Block Pavements having thickness 60mm and compacted including cost and conveyance and all labour charges etc complete
Towards Name board
Earth work excavation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,SS 20 B
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Plain Cement concrete 1:3:6 mix using 20 mm HBGS including cost and conveyance of all materials to site and all labour charges etc complete
Constn. Of Granular sub base by providing well graded materials (25 mm to 4.75 mm IRC HBG metal @ 65 % , 4.75 to 2.36 mm IRC HBG metal @ 20%, and 2.36 mm below IRC HBG including cost and conveyance and all labour charges etc complete
Providing and Laying of Interlocking Concrete (Surface Textured) Block Pavements having thickness 60mm and compacted including cost and conveyance and all labour charges etc complete
Towards Name board
Earth work excavation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,SS 20 B
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Plain Cement concrete 1:3:6 mix using 20 mm HBGS including cost and conveyance of all materials to site and all labour charges etc complete
Constn. Of Granular sub base by providing well graded materials (25 mm to 4.75 mm IRC HBG metal @ 65 % , 4.75 to 2.36 mm IRC HBG metal @ 20%, and 2.36 mm below IRC HBG including cost and conveyance and all labour charges etc complete
Providing and Laying of Interlocking Concrete (Surface Textured) Block Pavements having thickness 60mm and compacted including cost and conveyance and all labour charges etc complete
Towards Name board
Earth work excavation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,SS 20 B
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Plain Cement concrete 1:3:6 mix using 20 mm HBGS including cost and conveyance of all materials to site and all labour charges etc complete
Constn. Of Granular sub base by providing well graded materials (25 mm to 4.75 mm IRC HBG metal @ 65 % , 4.75 to 2.36 mm IRC HBG metal @ 20%, and 2.36 mm below IRC HBG including cost and conveyance and all labour charges etc complete
Providing and Laying of Interlocking Concrete (Surface Textured) Block Pavements having thickness 60mm and compacted including cost and conveyance and all labour charges etc complete
Towards Name board
Provision for Photo charges
Earth work excavation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,SS 20 B
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Plain Cement concrete 1:3:6 mix using 20 mm HBGS including cost and conveyance of all materials to site and all labour charges etc complete
Constn. Of Granular sub base by providing well graded materials (25 mm to 4.75 mm IRC HBG metal @ 65 % , 4.75 to 2.36 mm IRC HBG metal @ 20%, and 2.36 mm below IRC HBG including cost and conveyance and all labour charges etc complete
Providing and Laying of Interlocking Concrete (Surface Textured) Block Pavements having thickness 60mm and compacted including cost and conveyance and all labour charges etc complete
Towards Name board
Earth work excavation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,SS 20 B
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Plain Cement concrete 1:3:6 mix using 20 mm HBGS including cost and conveyance of all materials to site and all labour charges etc complete
Constn. Of Granular sub base by providing well graded materials (25 mm to 4.75 mm IRC HBG metal @ 65 % , 4.75 to 2.36 mm IRC HBG metal @ 20%, and 2.36 mm below IRC HBG including cost and conveyance and all labour charges etc complete
Providing and Laying of Interlocking Concrete (Surface Textured) Block Pavements having thickness 60mm and compacted including cost and conveyance and all labour charges etc complete
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
Towards Name board
Earth work excavation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,SS 20 B
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Plain Cement concrete 1:3:6 mix using 20 mm HBGS including cost and conveyance of all materials to site and all labour charges etc complete
Constn. Of Granular sub base by providing well graded materials (25 mm to 4.75 mm IRC HBG metal @ 65 % , 4.75 to 2.36 mm IRC HBG metal @ 20%, and 2.36 mm below IRC HBG including cost and conveyance and all labour charges etc complete
Providing and Laying of Interlocking Concrete (Surface Textured) Block Pavements having thickness 60mm and compacted including cost and conveyance and all labour charges etc complete
Towards Name board
Earth work excavation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,SS 20 B
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Plain Cement concrete 1:3:6 mix using 20 mm HBGS including cost and conveyance of all materials to site and all labour charges etc complete
Constn. Of Granular sub base by providing well graded materials (25 mm to 4.75 mm IRC HBG metal @ 65 % , 4.75 to 2.36 mm IRC HBG metal @ 20%, and 2.36 mm below IRC HBG including cost and conveyance and all labour charges etc complete
Providing and Laying of Interlocking Concrete (Surface Textured) Block Pavements having thickness 60mm and compacted including cost and conveyance and all labour charges etc complete
Towards Name board
Earth work excavation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,SS 20 B
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Plain Cement concrete 1:3:6 mix using 20 mm HBGS including cost and conveyance of all materials to site and all labour charges etc complete
Constn. Of Granular sub base by providing well graded materials (25 mm to 4.75 mm IRC HBG metal @ 65 % , 4.75 to 2.36 mm IRC HBG metal @ 20%, and 2.36 mm below IRC HBG including cost and conveyance and all labour charges etc complete
Providing and Laying of Interlocking Concrete (Surface Textured) Block Pavements having thickness 60mm and compacted including cost and conveyance and all labour charges etc complete
Towards Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
LAKSHMI JEYARAM
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .