Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance B 176 SECTOR 71 NOIDA GAUTAM BUDH NAGAR | NOIDA | GAUTAM BUDH NAGAR | UTTAR PRADESH | Admitted-Finance |
| 2 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹83 L
EMD Value
₹83,000
Closing Date
18 Apr 2023, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE, ECWD, SAHARANPUR
EE, ECWD, SAHARANPUR
(i) Increasing capacity and (ii) New 11KV Feeder from 33/11 KV SS RAMPUR MANIHARAN TEHSIL SAHARANPUR
2023_PVVNL_796470_1
01/ECWD/SRE/2023-24
Open Tender
Electrical Works
Lump-sum
90 days
SAHARANPUR
PLEASE REFER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹5,900
EE, ECWD, SAHARANPUR
₹83,000
20 Apr 2023
11 Apr 2023
18 Apr 2023
11 Apr 2023
18 Apr 2023
12 Apr 2023
(i) Increasing capacity of 33/11 KV Sub-Station RAMPUR MANIHARAN, TEHSIL (Saharanpur) from (2×5) MVA to (1×5+ 1×10) MVA. 1. Supply of following Items :- i) Supply of Heat shrinkable Out door jointing kits suitable for 11KV, 3x300q.mm XLPE cable (Raychem / Dension or PVVNL Approved vender).
ii) Supply of Heat shrinkable indoor jointing kits suitable for 11KV, 3x300q.mm XLPE cable (Raychem / Dension or PVVNL Approved vender).
iii) Supply of Heat shrinkable Out door jointing kits suitable for 11KV, 3x185q.mm XLPE cable (Raychem / Dension or PVVNL Approved vender).
iv) Supply of Heat shrinkable indoor jointing kits suitable for 11KV, 3x185q.mm XLPE cable (Raychem / Dension or PVVNL Approved vender).
2. 33 KV Lightening Arrestor
3. M.S. Round 32 mm dia
4. Supply of G.I. Strip size 50x6mm for earthing of outdoor & indoor equipment
5. Supply for cable support Galvanised Structure i) Galvanised Channel (100x50x6)mm
ii) Galvanised Angle (50x50x6)mm
iii) G.I.Pipe 110mm Dia 2mm thickness 2Mtr long with G.I.Clamp.
6. Supply of copper bus bar of size (2500x50x6)mm
7. Supply for Water level earthing i) G.I. pipe size 40 mm inner dia & thickness 2mm
ii) Solid copper cone Approx 225 mm long and 750 gm in weight
iii) Copper wire 6 SWG
iv) Copper flexible earthing strip of size 50x6mm for neutral
8. Supply of ready mixed primer & ISI mark Aluminium Paint & ISI mark synthetic enaimel green paint for painting of installed all Structure & G.I.Strip.
9. 24 'V' Battery with Battery Charger & Cabinet
10. Safe carriage of with loading & unloading at both ends respectively. (under jurisdiction of PVVNL) i) ACSR Dog Conductor
ii) 11KV XLPE cable 3x300mm²
iii) 11KV XLPE cable 3x185mm²
iv) 11KV Incoming VCB CTR 600/300, 5AMP
v) 11KV Outgoing VCB 200/100/5
vi) 33KV control panel of Double T/F
vii) 33KV VCB 800A 750 MVA
11. Miscellaneous Civil works of Increasing Capacity of 33/11 KV Substation RAMPUR MANIHARAN, TEHSIL (Saharanpur) from (2×5) MVA to (1×5+ 1×10) MVA. Construction of Plinth for 33/11KV T/F of (3.46x4.46x1.0)m 0.5 m above ground level) as per details:- i) Supply of 90 lbs rail pieces for T/F (44.64Kg/Mtrs.)
ii) Supply & Erection of 1st Class brick work for side walls size 0.23 m wide upto 0.35 m height cm C.C. ratio of 1:4 (cement & fine sand)
iii) Supply & Filling of brick ballast in plinth in ratio 1:4:8 (cement, coarse sand & brick ballast) with proper ramming. Size (3.0x4.0x0.65)m.
iv) Supply & Erection of R.C.C. work on the top of plinth in ratio 1:2:4 in (3.46x4.46)m size and 0.20m in thickness by using M.S. Tor of 12 mm dia. 12 Nos. in each direction across to each other & M.S.Channel (125x65x6mm) 52Kgs. The work also includes cutting, bending of M.S. Tor etc.
v) Supply & Erection of Quantity of M.S. Tor of size 12 mm dia required for reinforcement of plinth in R.C.C. work, work also includes cutting, winding and laying etc. in the T/F plinth.
vi) Grouting of 02 Nos. 90/105 lb. Rail pieces of 3.46m long and (50x50x6)mm M.S. Angle in R.C.C. work at the top of plinth work also includes cutting of rail and angles pieces etc.
vii) Supply & Erection of 12mm thick plaster with cement mortar ratio 1:4 (cement & fine sand) of plinth of 0.4m upper side.
12. Hiring of D/G Set including carriage, loading, unloading & operating charges (with fuel) at 33/11 KV Substation under construction in case L.T. supply is not available near S/S within prescribed accessible limit. 63 KVA, Three phase, D/G Set for fabrication of different structure at Substation.
13. Dismantling of Existing ( 5 MVA-1 Nos) Transformer Kept at suitable place outside switchyard i) Disconnecting HT cable connection from 33KV side & 11KV side of 05MVA Power transformer for removing power transformer from plinth after proper shutdown. Dismantling of 11KV cable support structure, copper bus bar structure, M.S.Frame etc.
ii) Disconnecting copper flexible/Earthing strip from Power transformer neutral & Dismantling neutral earthing system to facilitate removal of Power transformer from plinth.
iii) Disconnecting Earthing strip from body of 05MVA Power transformer.
iv) Draining of transformer oil from conservator, radiators of existing 05 MVA T/F, at 33/11 KV S/S RAMPUR MANIHARAN, TEHSIL (Saharanpur) into the dry & clean drums and stacking at the safe place in Substation outside of switchyard. Empty drums shall be provided by contractor.
v) Removal of conservator, radiators and other accessories from existing 05 MVA Power transformer.
vi) Safe Shifting of 05 MVA Power transformer main body and other accessories from the substation switchyard to outside the switchyard at suitable place assigned by concern J.E/S.D.O (Distribution).
vii) Re-assembling of conservator, radiators and other accessories to existing 05 MVA Power transformer.
viii) Re-filling the transformer oil (old & used in existing 5MVAT/F)
14. Miscellaneous Electrical works of Increasing Capacity of 33/11 KV Substation RAMPUR MANIHARAN, TEHSIL (Saharanpur) from (2×5) MVA to (1×5+ 1×10) MVAInstallation of 33/11 KV, 10 MVA Transformer :i) Shifting of available 10 MVA 33/11 KV, Transformer to transformer plinth in Switch Yard.
ii) Erection of shifted Transformer at plinth by fixing all accessories like radiators, conservator tank, filling the transformer oil to desired level and ensuring that there is no leakage, complete job in all respect.
15. Water level earthing by Boring and lowering of G.I. pipe size 40 mm dia & thickness 2mm into the ground at 20 Mtr depth or upto the water level with the lower end of solid copper cone Approx 225 mm long and 750 gm in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 SWG from the cone up to the ground surface where it will be bolted to the G.I. earth Strip for Transformer neutral connection, the earth strip will be welded to the G.I. pipe and neutral earthing support.
16. i) Fabrication and erection of cable support made of two pieces of M.S. Channel (100x50x6)mm, 2.75 meter long, joined to each other by means of 5 Nos. M.S. Angle (50x50x6) mm pieces of size 0.75Mtr long each by welding at equal intervals and grouting in a block of size (300x1000x1000)mm in C.C. 1:3:6 complete with one coat of ready mixed primer and two coats of Al. paint. Work includes providing of three Nos. M.S. clamps made of (50x6)mm M.S. Flat for holding the cable including nuts and bolts with stone Pad of size (300x300x75mm).
ii) Fixing 110mm dia 2mm thick 2M long G.I.Pipe over 11KV, 3x300Sq.mm XLPE Cable before mounting the 2No. Cable on cable support structure. Work includes fixing of Clamp, sealing of top and bottom end of the G.I.Pipe. One end of G.I.Pipe is to be buried under earth about 500mm.
iii) Fabrication of copper bus bar of size (2500×50×6)mm in L.V. side of 10 MVA 33/11 KV, power transformer. Work includes connection of outside bus bar in L.V. side busing rod of Power Transformer and other side with outdoor 11 KV cable box as well as providing empire tape and H.T. tape etc. for proper insulation work.
17. Installation of 11 KV Switch Gears in Control Room i) Carefully & safely shifting of 11 KV switch gears (I/C-1N0, O/G-2No) from outside to inside the switch gear room grouting foundation of bolts in C.C. ratio of 1:2:4 (including cutting of RCC floor and finishing of RCC floor) as per requirement placing, aligning and fixing of 11 KV anchor GI bolts and nuts of proper size for completion of work.
ii) Proper fixing and making bus bar connection in between two switch gears (I/C-1N0, O/G-2No) after proper cleaning. Work also include proper insulation, taping by empire, PVC and H.T. tape etc.
18. H.T. Power Cable Laying : i) Laying 11 KV, (3x300)/(3×185) mm2 XLPE Cable from power transformer to 11 KV incoming switch gear and 11 KV incoming switch gear to Double pole in the cable trench and 0.45 m wide, 0.90m depth. Providing 150 mm local sand for cushion beneath and 150 mm above the cable (quality of local sand required 0.375 cum/m in length). The cable shall be dully protected by brick. On both side of cable by laying brick vertically and bricks would also be laid bricks along the cable (minimum 18 Nos. of bricks are to be laid top and outer side along the single cable. The work includes digging of trenches, laying of cable in under ground trenches, joining of terminal's, back filling of earth and testing and commissioning of power cable etc. Spare cable shall be left over and laid in the trenches in shape of 6 m ring at both ends.
ii) Laying and dressing of 11 KV (3x300)/(3×185) mm2 power cable in air/Trench.
19. Preparation of 11 KV Power Cable ends: i) Making of cable end termination by Heat shrinkable Out door jointing kits suitable for 11KV, 3x300/3x185q.mm XLPE cable. Providing, fixing and crimping of proper size good quality lugs complete in all respect.
ii) Making of cable end termination by Heat shrinkable indoor jointing kits suitable for 11KV, 3x300/3x185Sq.mm XLPE cable. Providing, fixing and crimping of proper size good quality lugs complete in all respect.
20. Outdoor switchyard Earthing with 32 mm.size MS round Earth mat with Delta Earthing on power Transformer Nutral & 33 KV LA as per respo specification
21. Painting of S/S Structure
22. Installation of 24 V Battery and Battery Charger : assembling and installation of the cabinet of 24 V battery and battery charger in switch gear control room including grouting of foundation bolts as per drawing of manufacture, including providing the foundation nuts and bolts of proper size. The electrical connection between battery and battery charge with flexible copper lead of size 7/20 SWG shall be done properly. The work includes installation, wiring upto control panel, testing and commissioning complete in all respect.
23. Installation of 33 KV Lightening Arrestors : Assembling and installation/mounting of 3 Nos. lighting arrestors on the L.A.'s structure/terminal gantry, complete with earthing and line connections. The work includes fabrication for proper fixing, if required.
24. Installation of 33 KV Control Panel of Double T/F Assembling and installation of 33 KV VCB Control Panel of Double T/F Adjustment of operating mechanism in proper alignment for smooth operation of the same. The work also includes fabrication of addition arrangement for proper fixing, if required.
25. Installation of 33 KV VCB Assembling and installation of 33 KV VCB on the VCB out door structure on the plinth. Adjustment of operating mechanism in proper alignment for smooth operation of the same. The work also includes fabrication of addition arrangement for proper fixing, if required.
26. Testing & commissioning of Power T/F and all 33KV & 11KV switchgears / Panels. providing required No. of technicians with proper testing equipments during commissioning & energisation.
27. Earthing of outdoor equipment, details as given below:-Cutting of 32mm.dia M.S. Bar-3Mtr.long and making one end in conical shape by forging process and driving it into the earth at each corner of bridge outside control room and proper welding with M.S.Bars.
28. Digging of Pits for making delta by laying 32mm. dia M.S.Round in tringle shape. Electric welding on cross joints by providing “U” Clamp in size 25×6mm. of M.S.Flat, with over lap joint by providing M.S.Round-12mm dia, on both sides of over lap joints of M.S.Round, by electric welding. All joints shall be painted with black bituminious paint.
29. Making earthing of 33KV LA, Neutral link structure, Power T/F body (both side) by providing G.I.Strip in size 50×6mm. with 32mm. dia M.S.Round laid in trench with proper electric welding.
30. Making proper earthing of other structure such as, 33KV VCB, CT's, L.A, P.I, Cable support structure, Bus isolator, 11 KV VCB by laying G.I.Strip size (50×6)mm for connecting the earth mat. The work also includes digging of earth, cutting, bending, tening, over laping and welding the earth strip with earth mat by using high quality are welding and paints of joints with black bituminous paint in already digged trenches.
(ii) New 11 KV Feeder from 33/11 KV Sub-Station RAMPUR MANIHARAN, TEHSIL (Saharanpur) 1. Supply of following Items :- i) ST Pole 11Mtr. SP-55
ii) PCC Pole 8.5 Mtr
iii) V Type G.I. Cross Arm 11 KV
iv) G.I. Channel 100×50×6
v) G.I. Angle (65×65×6)mm
vi) M.S. Earthing Rod
vii) Disc Insulator with Fitting 45 KN
viii) Stay Sets (16×1800)mm
ix) 11 KV Pin Insulator Poly with Pin
x) 11 KV Outdoor type J/Kit suitable for 3×185mmsq XLPE cable
xi) G.I. Wire 6 SWG
xii) G.I. Wire 8 SWG
xiii) I hook
xiv) Pearcing connector 50/35mmsq
xv) Suspension 95/50
xvi) Dead end clamp 95/50
xvii) 1-Phase distribution box
xviii) T/F Plinth for 250 KVA T/F
xix) T/F Fencing for 250 KVA T/F
xx) Chemical earthing
xxi) G.I. pipe 6'' dia
xxii) Stone pad (300×300×75)mm
xxiii) Grouting of poles (as per specification)
xxiv) Aluminium paint
xxv) Red Oxide Paint
xxvi) HDPE, PE 80, PN-6 150mm dia Pipe by trienchless methode in double layer .
xxvii) Cable rout marker
2. Safe carriage of with loading & unloading at both ends respectively. (under jurisdiction of PVVNL) i) ACSR Rabbit Conductor
ii) 11 KV, 3×185mm² XLPE Cable
iii) LT ABC 3×120mmsq
iv) LT ABC 3×95mmsq
v) LT ABC 3×50mmsq
vi) T/F 11/0.4 KV 250 KVA
vii) T/F 11/0.4 KV 100 KVA
viii) T/F 11/0.4 KV 63KVA
ix) LT lead 1×240 mmsq
3. Miscellaneous Electrical works for Construction of 11 KV Link Lines A- Erection of support after excavation of foundation pit in mix soil/normal soil/soft & hard rock and its back filling and leveling etc. The size of the pit will be (750×450)mm and having depth of 1/6th of the full length of the support & Erection of support. The work includes carriage and handling of supports from site store to pit site. (i) 8.5 Mtr. P.C.C. Poles
(ii) 11 M Long STP, SP-55 Round Pole
B- Fixing of all clamps & other accessories for example Cross Arm etc. on the supports. Work includes cutting of holes and providing M.S. Bolts wherever required. The work also includes carriage & handling of accessories from sectional store to pit site as well as any fabrication work if required. (i) Single Pole : (a) 8.5 Mtr. P.C.C. Poles
(b) 11 M Long STP, SP-55 Round Pole
(ii) Double Pole Structures : (a) 8.5 Mtr. P.C.C. Poles
(b) 11 M Long STP, SP-55 Round Pole
4. Grouting of supports in CC 1:4:8 (Cement, sand & 40 mm brick ballast) Grouting will be done upto 1/6th of full length of the support, up to ground level, 300 mm plinth above the ground level with C.C. 1:3:6 (Cement, Course sand and Stone grit) with muffing as per drawing, work includes back filling and proper ramming. (a) 8.5 Mtr. P.C.C. Poles
(b) 11 M Long STP, SP-55 Round Pole
5. Grouting of stay rods (20×1800)mm including all work of excavation, cement concrete in ratio 1:4:8 cement, sand, 40mm brick ballast) as per drg. including back filling, proper ramming etc and fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing.
6. Earthing of supports with MS earth Rod of (20×2500)mm long including excavation of pit and driving M.S. Rod 3.0 M apart from support and 0.5m below the ground level and connecting below the earth electrodes with the help of G.I. wire no. 8 SWG and earthing lugs.
7. Laying, spreading, lifting and final sagging of 3 phases of ACSR Rabbit conductor in accordance with profile and sag chart including binding, Jumpering and fixing of P.G. Clamp as per requirement in 03 Nos. conductor in parallel.
8. Guarding between two poles like single poles, double poles etc. to guard 11 KV Line, at river crossing, road crossing etc. with G.I. wire no. 8 SWG and G.I. wire no. 10 SWG, including cutting with fabrication and fixing of guarding channel with clamps nut & bolts etc. as per drawing.
9. Fixing of danger board at each location as per specification of the drawing with clamps etc.
10. Painting of following supports/structures with 2 coats of synthetic enamel paint after one coat of ready mix primer including cost of all material, as well as rubbing/cleaning of surface as required for proper completion of work. Painting will be done by post office red paint from top to cross arm and remaining by Aluminium paint. 11 Mtr, SP-55 Poles (i) Single supports
(ii) Double supports
11. Wrapping of barbed wire on 11 KV PCC Poles/SP-55 ST Poles as anti-climbing device for a length of 0.6 Mtr., wire pitch/gap 13mm and fixing upper and lower end keeping lower end at a height of 2.75 Mtr. from the ground complete with supply and fixing of lower end & upper end clamps made of M.S. Flat 40×5mm complete with nuts & bolts & all other required material.
12. H.T. Power Cable Laying : i) Digging of trench of size 900x1050 mm for laying of 33KV cable including loops.
ii) Safely laying of 11KV 3x185mmsq XLPE cable in cable trench by laying 2 No. Cables in each trench. (single circuit laying)
iii) Safe laying of 33KV XLPE cable in Air on D/P / F/P.
iv) Laying of Ist class bricks along the length on both sides and stone slab 650x450x40 as a top cover over the XLPE cable in trench. (Single circuit laying) (as per RESPO Norms)
v) Filling river sand in side beneath & around cable in the trench.
vi) Making of 11KVoutdoor type Heat shrink XLPE Cable Box of size 3x185mmsq and crimping of proper size Aluminium lugs. Work includes providing insulating tapes etc.
vii) Fixing 150mm dia 3 mtr long G.I pipe over 11KV 3x185 mm2 XLPE cable before mounting the cable on double pole structure. This work includes supply & fixing of clamps, Nut bolt, sealing of top and bottom of pipe and one end of pipe is to be buried under earth about 500mm including laying of cable in Pipe.
viii) Underground Railway /Highway Cable Crossing Laying of 01 Nos. 11 KV 3×185mm² XLPE cable crossing railway/Highway line between station Saharanpur & Rampur Maniharn at Dilhi Railway line (Distt. Saharanpur). (a) Boring of earth under the railway track of size 300mm dia tunnels (01 Nos.) for 11 KV, 3×185mm²XLPE cable. The tunnel will be excavated about 3 mtr. from the top of railway track matching with item no. 1(a) of cable trench surface.
(b) safely laying of HDPE 80 PN 150mm Pipe by trienchless methode in double layer tunnel under railway track for laying 11 KV XLPE cable
(c) Safely laying of 01 Nos. 11 KV, 3×185 mm² XLPE cable in HDPE 80 PN 150mm with minimum gap of 450mm between both cables from one Double Pole to other side of Double Pole.
d) Railway crossing's 01 No. / Highway crossing 02 No.documentation & survey work (excluding bank gurantee and way leave charges)
e) Making of 11 KV outdoor type heat shrinkable XLPE cable jointing boxes and crimping of proper size aluminum lugs. Work includes providing insulating tapes etc. as per specifications..
(f) Laying of 3×185mm² XLPE cable in the air and mounting and clamping 11 KV XLPE boxes on Double Pole structure and making connection with 11 KV overhead lines at both ends.
(g) Fixing 150mm dia 4mtr. Long G.I. Pipe over 11 KV 3×185mm² XLPE cable before mounting the cable on Double Pole. Work includes fixing of clamp, sealing on top and bottom end of the G.I. Pipe. One end of G.I. Pipe is to be butied under earth about 500mm.
13. Road restoration charge
14. Laying of LT ABC cable size 3×50mmsq (as per Specification)
15. Laying of LT ABC cable size 3×95mmsq (as per Specification)
16. Laying of LT ABC cable size 3×120mmsq (as per Specification)
17. Fixing of ‘P’ Bracket on Existing 11 KV line.
18. Shiffting of 11 KV PCC/STP Pole
19. Erection of T/F 11/0.4 KV 250 KVA (as per Specification)
20. Erection of T/F 11/0.4 KV 100 KVA (as per Specification)
21. Erection of T/F 11/0.4 KV 63 KVA (as per Specification)
22. Erection of LT Lead 1×240mmsq
23. Erection of I Hook for LT ABC
24. Erection of Pearcing connector 50/35mmsq
25. Erection of Suspension 95/50
26. Erection of Dead end clamp 95/50
27. Erection of 1-Phase distribution box
28. Making of Plinth for 250 KVA T/F (as per Specification)
29. Febrication of Fencing for 250 KVA T/F (as per Specification)
30. Erection of chemical earthing
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .