Superintending Engineer
Office of SE PW(RnB) Circle Anantnag
Construction of 1 x45 M trussed Bridge Aru
2026_PWDJK_325670_1
ENIT NO.17 of 2026-27/7898-7908 DATED 22/09/2026
Open Tender
Civil Works
Item Rate
180 days
Aru Pahalgam
Please refer Tender documents.
5 documents required · 5 mandatory
₹8,500
Office of SE PW(RnB) Circle Anantnag
₹10.2 L
Office of SE PW(RnB) Circle Anantnag
22 Sept 2026
22 Sept 2026
15 Oct 2026
23 Sept 2026
14 Oct 2026
23 Sept 2026
28 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | A: FOUNDATION & SUB-STRUCTURE :Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. Ordinary Rock | 1,423.2 | CUM | 344.37 | ₹4,90,107.38 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level. 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal) crushed Leveling Course | 19.8 | CUM | 5,026.62 | ₹99,527.08 |
| 3 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. All works upto plinth level | 297 | CUM | 7,032.06 | ₹20,88,521.82 |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level 5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. | 29,700 | KG | 108.01 | ₹32,07,897 |
| 5 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.All works above plinth level upto floor V level | 420.56 | CUM | 8,251.5 | ₹34,70,250.84 |
| 6 | Extra for providing richer mixes at all floor levels. Note:- Excess/ less cement over the specified cement content used is payable/ recoverable separately.Providing M-40 grade concrete instead of (Note : Cement content considered in M-40 is @ 360 kg/cum) | 0.72 | CUM | 236.14 | ₹170.02 |
| 7 | Extra for providing richer mixes at all floor levels. Note:- Excess/ less cement over the specified cement content used is payable/ recoverable separately. Providing M-30 grade concrete instead of M-25 grade BMC/RMC. | 419.84 | CUM | 86.62 | ₹36,366.54 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level 5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. | 42,055.59 | KG | 108.01 | ₹45,42,424.28 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of for Foundations, footings, bases of columns etc. for mass concrete | 30 | SQM | 251.04 | ₹7,531.2 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, pillars, piers, abutments, posts and struts.: | 850.72 | SQM | 650.99 | ₹5,53,810.21 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.85 MB
Tendernotice_2.pdf
PDF • 2.87 MB
BOQ_1100982.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .