Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAdmitted-Finance KHOITADIH PROJECT BILPAHARI BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | ₹2.2 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | BABLU SINHA L1 |
|---|---|---|---|---|
| 1.00item discription | ||||
| 2.00 | Installation and commissioning of 1000mm wide x 468 mtr conveyor Belt in Panel No. P-2, RVIIC Seam, -5D/-20L to -23D/-20L of CM Project at Nakrakonda Kumardihi B Colliery under Bankola Area Transportation & installation of complete drive drum, driven drum with gear motor base frame -10.5MT+discharge unit- 2.5MT+tail end -1MT+Load table-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+motor, winch starter & switches cables etc -2.0MT+1000mm wide conveyor structure with top, bottom roller & stool-468mtr @68Kg/mtr=31.8MT+ 10 times Tail end shifting (shortning)- 10MT. total weight =63.4 MT (1000mm wide dual drive conveyor Belt of Depillaring Panel No. P-2 RVIIC Seam of -5D/-20L to -23D/-20L, length: - 468mtr.) | 63.4 | MT | 26,421 ₹16.8 L |
| 3.00 | Fitting of tail end and discharge scraper. | 2 | EA | 1,218 ₹2,436 |
| 4.00 | Belt laying including transporting of belt, jointing, tensioning, trail run etc | 950 | M | 558 ₹5.3 L |
| 5.00 | Foundation, bolting for fitting of drive unit , discharge unit , loop take up & tail end etc =120nos | 120 | EA | 448 ₹53,760 |
| 6.00 | Cleaning of coal & unused materials before installation job | 1 | EA | 20,711 ₹20,711 |
| 7.00 | Fencing of drive ,loop take up & tail end | 1 | EA | 18,274 ₹18,274 |
| 8.00 | Making vertical support from roof and floor for hanging the conveyor structure from drive head to discharge by welding, gas cutting etc. considering cost of consumables. | 1 | EA | 54,461 ₹54,461 |
| 9.00 | Cost of M.S. Nut bolts & washers | 441 | KG | 121.5 ₹53,581.50 |
| 10.00 | Cost of Belt fastener/joint E-35 Comb and grip type suitable for Mato make machine available in mines | 10 | PKT | 8,800 ₹88,000 |
Updated dates
Tender Value
₹2.2 Cr
EMD Value
₹2.7 L
Closing Date
20 Apr 2026, 2:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Installation and commissioning of conveyor belts in RVIIC seam, Depillaring and Development Panel No. P2, P3, P4, P5, P6, P9(A)of CM project at Nakrakonda- Kumardihi B Colliery under Bankola area
2026_ECL_357690_1
ECL/GM/BA/E TENDER/25-26/EnM/406 Dt 30.03.2026
Open Tender
Electrical and Maintenance Works
180 days
Nakrakonda Kumardihi B Colliery
Please refer to NIT document
5 documents required · 5 mandatory
₹2.7 L
1 Jun 2026
30 Mar 2026
21 Apr 2026
30 Mar 2026
20 Apr 2026
30 Mar 2026
30 Mar 2026 - 8 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1item discription | |||||
| 2 | Installation and commissioning of 1000mm wide x 468 mtr conveyor Belt in Panel No. P-2, RVIIC Seam, -5D/-20L to -23D/-20L of CM Project at Nakrakonda Kumardihi B Colliery under Bankola Area Transportation & installation of complete drive drum, driven drum with gear motor base frame -10.5MT+discharge unit- 2.5MT+tail end -1MT+Load table-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+motor, winch starter & switches cables etc -2.0MT+1000mm wide conveyor structure with top, bottom roller & stool-468mtr @68Kg/mtr=31.8MT+ 10 times Tail end shifting (shortning)- 10MT. total weight =63.4 MT (1000mm wide dual drive conveyor Belt of Depillaring Panel No. P-2 RVIIC Seam of -5D/-20L to -23D/-20L, length: - 468mtr.) | 63.4 | MT | - | - |
| 3 | Fitting of tail end and discharge scraper. | 2 | EA | - | - |
| 4 | Belt laying including transporting of belt, jointing, tensioning, trail run etc | 950 | M | - | - |
| 5 | Foundation, bolting for fitting of drive unit , discharge unit , loop take up & tail end etc =120nos | 120 | EA | - | - |
| 6 | Cleaning of coal & unused materials before installation job | 1 | EA | - | - |
| 7 | Fencing of drive ,loop take up & tail end | 1 | EA | - | - |
| 8 | Making vertical support from roof and floor for hanging the conveyor structure from drive head to discharge by welding, gas cutting etc. considering cost of consumables. | 1 | EA | - | - |
| 9 | Cost of M.S. Nut bolts & washers | 441 | KG | - | - |
| 10 | Cost of Belt fastener/joint E-35 Comb and grip type suitable for Mato make machine available in mines | 10 | PKT | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
Tendernotice_1.pdf
PDF • 0.76 MB
Tendernotice_2.pdf
PDF • 1.26 MB
BOQ_370557.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid