| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.8 CrAccepted-AOC | ₹1.8 Cr | 1 | Accepted-AOC L-1 |
| 2 | 2₹1.9 Cr+₹9.4 L (5.07%)Rejected-AOC | ₹1.9 Cr+₹9.4 L (5.07%) | 2 | Rejected-AOC L-2 |
| 3 | 3₹2.0 Cr+₹18.7 L (10.1%)Rejected-AOC | ₹2.0 Cr+₹18.7 L (10.1%) | 3 | Rejected-AOC L-3 |
| 4 | 4₹2.1 Cr+₹21.1 L (11.4%)Rejected-AOC | ₹2.1 Cr+₹21.1 L (11.4%) | 4 | Rejected-AOC L-4 |
| 5 | 5₹2.1 Cr+₹25.7 L (13.9%)Rejected-AOC | ₹2.1 Cr+₹25.7 L (13.9%) | 5 | Rejected-AOC L-5 |
Tender Value
₹2.3 Cr
Closing Date
20 Dec 2021, 1:00 pmClosed
Chief Engineer NH PWD Roads
Office of the Chief Engineer NH PWD Roads, Meghalaya Shillong
Construction of Gabian Wall, RoadSideDrain, C.C Shoulder and clearing of landslip at 16th Km of Shilong-Nongstoin Road NH-44E for the year 2021-22
2021_MoRTH_660226_1
PW/CE/NH/14/2020/9
Open Tender
Civil Works
Item Rate
243 days
NH-44E
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
Chief Engineer NH PWD Roads
Exempted
Shillong
11 Sept 2023
29 Nov 2021
21 Dec 2021
29 Nov 2021
20 Dec 2021
29 Nov 2021
29 Nov 2021 - 20 Dec 2021
13 Dec 2021
Amount
2.4 Dismantling of existing structure like culverts, bridges, retaining walls and other stuctures comprising of stone masonry, cement concrete, wood work, steel work etc…...This includes loading unloading, haulage, forest royalty and all aplicable taxes complete as directed. (i)Lime/ Cement Concrete (II) By mechanical means for items no.202 (b) & c (B) Prestressed / Reinforced cement concrete grade M-20 & above
3.13 Earthwork in excavation in foundation of structures as per drawing and technical specification including setting out, construction of shoring etc. This includes loading unloading, haulage, forest royalty and all aplicable taxes complete as directed. (i) Ordinary soil:- (A) Manual Means:-
9.8 Land slide Clearance in Soil: Clearance of of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side.. This includes loading unloading, haulage, forest royalty and all aplicable taxes complete as directed.
14.22:Providing and laying Gabions walls laid in wire crates with 4mm dia wire conforming to IS:280 & IS:4826 in 100mmx100mm mesh (wooven diagonally) inincluding 10% extra for laps and joints with stone boulders weighing not less than 25kg each as per drawing and Technical spesification clause 1301.At 16th Km of S.N Road NH-44 E
7.14 Dry boulder pitching in flooring CC Shoulder .This includes loading unloading, haulage, forest royalty and all aplicable taxes complete as directed.
7.2 Plain cement concrete M15 mix with stone aggregates 20 mm nominal size mechanically mixed and vibrated in foundation upto a depth of 1.50m below ground level and 1 or 1.50 m above round Bed Level. This includes loading unloading, haulage, forest royalty and all aplicable taxes complete as directed.
2.1 Providing form work of ordinary timber planking of thickness not less than 25mm and removal of the same for concrete members so as to give a rough finish including centering, shuttering, strutting and propping etc., for height of propping and centering of supporting floor to the soffit of the concrete member not exceeding 4.0M as specified for the following items: This includes loading unloading, haulage, forest royalty and all aplicable taxes complete as directed. a) Foundation, footings, bases of columns, pile cap, raft and mass concrete works etc.
Nibatskhem Marang
Friday Hinge
Rodson Warjri
Nangwallambok Nongsiej
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .