Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.6 LAccepted-Finance | ₹31.6 L | L1 | Accepted-Finance As per boq comparative statement generated |
| 2 | L2₹34.8 L+₹3.2 L (10.00%)Accepted-Finance | ₹34.8 L+₹3.2 L (10.00%) | L2 | Accepted-Finance As per boq comparative statement generated |
| 3 | L3₹36.9 L+₹5.3 L (16.7%)Accepted-Finance | ₹36.9 L+₹5.3 L (16.7%) | L3 | Accepted-Finance As per boq comparative statement generated |
| 4 | L4₹40.3 L+₹8.7 L (27.5%)Accepted-Finance STAKMO | ₹40.3 L+₹8.7 L (27.5%) | L4 | Accepted-Finance As per boq comparative statement generated |
| 5 | L5₹42.1 L+₹10.5 L (33.3%)Accepted-Finance | ₹42.1 L+₹10.5 L (33.3%) | L5 | Accepted-Finance As per boq comparative statement generated |
Tender Value
₹52.7 L
EMD Value
₹1.2 L
Closing Date
26 Jun 2026, 4:00 pmClosed
Executive Engineer InFC division Leh
Office of the Executive Engineer InFC division Leh
Channelization and protection of pasture land at Anlay Buk (by way bof crate bund at vulnerable spots both sides along the nallah) (Under BADP )
2026_PWD_19034_1
14 of I and FC Division Leh 2026-27
Open Tender
Civil Works - Canal
Percentage
90 days
LEH
Please refer to tender document
3 documents required · 3 mandatory
₹2,000
Yes
Payable To Executive Engineer InFC division Leh
₹1.2 L
30 Jun 2026
6 Jun 2026
27 Jun 2026
6 Jun 2026
26 Jun 2026
6 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) in
foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),
including dressing of sides and ramming of bottoms, lift upto 1.5 m, including
getting out the excavated soil and disposal of surplus excavated soil as directed,
within a lead of 50 m. | 929.2 | Cum | 278.09 | ₹2,58,401.23 |
| 2 | Constructing vertical bunds with sloping faces, by boulder filling (dry, hand packed tightly); including cost of stones but excluding cost of wirecrates | 1,676.49 | Cum | 1,494.48 | ₹25,05,480.78 |
| 3 | Making knitted wire crates of approved mesh-size; including weaving, binding
sides and partitions, and binding top after filling; excluding cost of filling, stones
and weaving materials | 782.6 | sqm | 100.68 | ₹78,792.17 |
| 4 | Carriage of material by mechanical transport. A. Soling stone an lead of 20 kms. | 1,676.49 | Cum | 452.67 | ₹7,58,896.73 |
| 5 | Carriage of material by head load. A. Soling stone an lead of 300 mtrs. | 1,676.49 | Cum | 465.17 | ₹7,79,852.85 |
| 6 | Supply of cratev wire carriage complete job. A. Crate wire. | 180 | Nos | 4,237.28 | ₹7,62,710.4 |
| 7 | B. Lid. | 360 | Nos | 338.98 | ₹1,22,032.8 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_45394.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .