| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.4 LAccepted-AOC E 30 RAJIV NAGAR BEGUMPUR NEW DELHI 110086 | NEW DELHI | NEW DELHI | DELHI | 110086 | 1 | Accepted-AOC L1 | |
| 2 | 2₹11.0 L+₹19,915.97 (1.84%)Rejected-Finance 131 SHINGANAPUR ROAD KOLKI KOLKI SATARA MAHARASHTRA 415523 | SATARA | MAHARASHTRA | 415523 | 2 | Rejected-Finance Not L1 | |
| 3 | 3₹11.2 L+₹41,220 (3.80%)Rejected-Finance MANNI MOUNTA COMPLEX NEAR SGPGI RAEBARELI ROAD LUCKNOW 226014 | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226014 | 3 | Rejected-Finance Not L1 | |
| 4 | 4₹13.0 L+₹2.2 L (20.2%)Rejected-Finance | 4 | Rejected-Finance Not L1 | |
| 5 | 5₹13.6 L+₹2.8 L (25.5%)Rejected-Finance | 5 | Rejected-Finance Not L1 |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
14 Dec 2023, 6:00 pmClosed
CWE LUCKNOW
HQ CWE Lucknow, 229 MG Road, Lucknow Cantt, Lucknow-226002
REPAIR /MAINT OF CENTRAL AC TYPE OF AC PLANT OF VARIOUS LOCATIONS AT LUCKNOW CANTT UNDER GE (E/M) LUCKNOW
2023_MES_628589_1
CWE/LKO/EM/T-59 OF 2023-24
Open Tender
Miscellaneous Works
Item Rate
180 days
Lucknow
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GE EM Lucknow
₹40,000
Yes
7 Feb 2024
16 Nov 2023
21 Dec 2023
16 Nov 2023
14 Dec 2023
30 Nov 2023
16 Nov 2023 - 30 Nov 2023
Amount
M&L for cleaning of all Condenser tubes of central AC plant by disconnecting the condenser from the system, cleaning by descaling pump of suitable capacity of 110 ft head using descaling solution of approved make or Hydrochloric acid 20%, cleaning the system through cooling tower(incl cooling tower) incl water pipe line complete by using descaling solution, cleaning condenser tubes by nylon brushes/ by descaling water pressure pump & mild steel rods of suitable size, renewal of suction water filter and all nozzels for the following AC Plants. (Note:- T&P such as pumps, tube etc & descaling solution nut bolts studs and welding work etc shall be arranged by the contractor at his own cost.) NOTE- Cleaning of all gate valves, Butterfly valves and gaskit etc by opening and reassembling at the same position for proper functioning of plants is also included in the above said work.
2x25 TR capacity plant (double circuit) at AFMSD ( Set of two Compressor for each plant and each compressor having two condensor tubes) SM/MES N0- 556-W/134/CR-1/13&556-W/134/CR-2/13
2x25 TR capacity plant (double circuit) at 25 WEU ( Set of two Compressor for each plant and each compressor having two condensor tubes) SM/MES N0- 556-W/137/CR-1/15&556-W/137/CR-2/15
3x25 TR capacity plants at AFMSD ( Set of three Compressor for each plant and each compressor having two condensor tubes) .SM/MES -556W/146/CH/17
2x25 TR capacity plant (double circuit) Receiver Station( Set of two Compressor and each compressor having two condensor tubes ).SM/MES N0-556W/147/CH/17
3x50 TR capacity plant (Quadrapule circuit) at OPS ROOM COMPLEX HQCC ( Set of four Compressor for each plant and each compressor having two condensor tubes).SM/MES No-833-W/136/CO-1/18,833-W/136/CO-2/18,833-W/136/CO-3/18,
3x25 TR capacity plant (double circuit) at TRANSMITTER STATION ( Set of three Compressor for each plant and each compressor having two condensor tubes)SM/MES No-556-W/138/CH-1/16 and 556-W/138/CH-2/16
3x25 TR capacity plants at SIGNAL CENTRE HQCC ( Set of three Compressor for each plant and each compressor having two condensor tubes)
2x75 TR capacity plant (double circuit) Surya Auditorium ( Set of two Compressor and each compressor having two condensor tubes ). SM/MES No-556/0037/CR-2/05 AND 556/0037/CR-1/05
Carrying out pressure leak testing by nitrogen gas of the system of AC plant for leak proof valve joints, seal & other connected controls etc. including identifying & rectifying of leaks, defects (if any) & maintaining constant pressure of 160 LBS PSI on low side & 300 PSI on high side at least for 24 Hrs complete all as specified and directed by EIC. for the following AC plants:- (Note: The arrangement of T&P & nitrogen gas shall be contractors responsibility).
2x25 TR capacity plant (double circuit) at 25 WEU, Receiver Station and AFMSD ( Set of two Compressor for each plant and each compressor having two condensor tubes).SM/MES N0- (1)556-W/134/CR-1/13&556-W/134/CR-2/13(2)SM/MES N0- 556-W/137/CR-1/15&556-W/137/CR-2/15
3x25 TR capacity plants at AFMSD ( Set of three Compressor for each plant and each compressor having two condensor tubes)
3x50 TR capacity plant (Quadrapule circuit) at OPS ROOM COMPLEX HQCC ( Set of four Compressor for each plant and each compressor having two condensor tubes).SM/MES No-833W/136/CO-1/18, 833W/136/CO-2/18, 833W/136/CO-3/18
3x25 TR capacity plant (double circuit) at TRANSMITTER STATION ( Set of three Compressor for each plant and each compressor having two condensor tubes)SM/MES No-556-W/137/CH-1/15 and 556-W/134/CH-2/15
3x25 TR capacity plants at SIGNAL CENTRE HQCC ( Set of three Compressor for each plant and each compressor having two condensor tubes)
2x75 TR capacity plant (double circuit) Surya Auditorium ( Set of two Compressor and each compressor having two condensor tubes ). SM/MES No-556/0037/CR-2/05 AND 556/0037/CR-1/05
Cleaning of AHU cooling coil (after dismantling front portion of AHU) by applying high air pressure followed by descaling solution & then washing with water pressure using jet pump and reassembling there after complete all as specified and directed by EIC including servicing of AC ducts ,cleaning etc and setting of grills, louvers and position of proportioning dampers & also minor repair to duct insulation for missing section complete for the following central AC plant :-
2x25 TR capacity plant (double circuit) at AFMSD ( Set of two Compressor for each plant and each compressor having two condensor tubes) .SM/MES N0- 556-W/139/AHU/13
3x25 TR capacity plants at AFMSD ( Set of three Compressor for each plant and each compressor having two condensor tubes)SM/MES -556W/146/CH/17
2x25 TR capacity plant (double circuit) Receiver Station( Set of two Compressor and each compressor having two condensor tubes ) SM/MES -556W/147/CH/17
3x50 TR capacity plant (Quadrapule circuit) at OPS ROOM COMPLEX HQCC ( Set of four Compressor for each plant and each compressor having two condensor tubes).SM/MES No-833W/136/CO-1/18, 833W/136/CO-2/18, 833W/136/CO-3/18
3x25 TR capacity plant (double circuit) at TRANSMITTER STATION ( Set of three Compressor for each plant and each compressor having two condensor tubes)SM/MES No-556-W/137/CH-1/15 and 556-W/134/CH-2/15
3x25 TR capacity plants at SIGNAL CENTRE HQCC ( Set of three Compressor for each plant and each compressor having two condensor tubes)
2x75 TR capacity plant (double circuit) Surya Auditorium ( Set of two Compressor and each compressor having two condensor tubes ). SM/MES No-556/0037/CR-2/05 AND 556/0037/CR-1/05
Taking out nitrogen gas (residual) after flushing, pressure testing & vaccumising the whole AC Plant with the help of vaccum pump & leaving the plant for 24 hrs for checking the leak point and commissioning the plant by charging refrigerant gas complete all as directed for the following plants (Note:-1) Arrangement of vaccum pump shall be the contractors responsibility. (2) Refrigerant gas for charging shall be measured and paid seperately under respective item as supply only.
2x25 TR capacity plant (double circuit) at 25 WEU ( Set of two Compressor for each plant and each compressor having two condensor tubes)
2x25 TR capacity plant (double circuit) at Receiver Station ( Set of two Compressor for each plant and each compressor having two condensor tubes) SM/MES -556W/147/CH/17
2x25 TR capacity plant (double circuit) at AFMSD ( Set of two Compressor for each plant and each compressor having two condensor tubes)
3x25 TR capacity plants at AFMSD ( Set of three Compressor for each plant and each compressor having two condensor tubes) .SM/MES -556W/146/CH/17
3x50 TR capacity plant (Quadrapule circuit) at OPS ROOM COMPLEX HQCC ( Set of four Compressor for each plant and each compressor having two condensor tubes).SM/MES No-
3x25 TR capacity plant (double circuit) at TRANSMITTER STATION ( Set of three Compressor for each plant and each compressor having two condensor tubes)SM/MES No-556-W/137/CH-1/15 and 556-W/134/CH-2/15
3x25 TR capacity plants at SIGNAL CENTRE HQCC ( Set of three Compressor for each plant and each compressor having two condensor tubes)
2x75 TR capacity plant (double circuit) Surya Auditorium ( Set of two Compressor and each compressor having two condensor tubes ). SM/MES No-556/0037/CR-2/05 AND 556/0037/CR-1/05
Attending the complaints of Ac Plants by Electrician/Technician/Mechanic for non functioning of part of compressor,blower motor,compressor pump,chiller pump,CT fan,electric pannel and all parst of AC plant at any location,rectified the same all as specified and directed by EIC.Note-(1) Complaints should be attended immediately with in one hour and to be rectified the same day at the earliest without affecting the services.(2) Complaints should be attended 24 Hrs through phone.(3) complaints should be detailed/attended by specified electrician/technician/mechanic having knowledge of AC plants and equipped with multimeter,tester and concerned tool etc. Note :- All spare parts shall be paid and measured separatly under relavent items
Supply only in repair power contactor MNX-25 type with NO & NC 3 Phase, 415 Volts current carrying capacity 25 Amps, coil voltage 220 volts, 50 Hz all as specified and directed by EIC
Supply only in repair power contactor MNX-18 type with NO & NC, 3 Phase, 415 Volts current carrying capacity 18 Amps, coil voltage 220 volts, 50 Hz all as specified and directed by EIC
Supply only in repair power contactor MNX-12 type with NO & NC 3 Phase, 415 Volts current carrying capacity 12 Amps, coil voltage 220 volts, 50 Hz all as specified and directed by EIC
Supply only in repair power contactor MNX-9 type with No & NC 3 Phase, 415 Volts current carrying capacity 9 Amps, coil voltage 220 volts, 50 Hz all as specified and directed by EIC
Supply only in repair high & low pressure cut-out switch type. MP - 15 all as specified and directed.
Supply only in repair oil safety switch type. MP - 55 all as specified and directed.
Supply only in repair low pressure cut-out switch type. MP - 1 all as specified and directed.
Supply only in repair low pressure cut-out switch type. MP - 5 all as specified and directed.
Supply only in repair single phase preventor to prevent against single phasing, reverse phasing with wiring & testing complete all as specified and directed.
Supply only in repair of water temperature censor for compressor of Make:-Blue Star, any model and Capacity as directed by eng-in-charge.
Supply only in repair water pressure gauge, 0-50 PSI all as specified and directed by EIC
Supply only in repair push button aquiator of existing size with elements all as specified and directed.
Supply only in repair of timer 7 PU upto 60 seconds all as specified and directed.
Supply only in repair of thermal overload relay range 7 - 18 amps all as specified and directed.
Supply only of in repair thermal overload relay range 17-32 amps all as specified and directed.
Supply only in repair of of PLA relay 8 pin 220 V all as specified and directed
Supply only in repair three phase Ammeter digital type upto 0 to 400 Amps with suitable CT's ratio of size 96 mm x 96 mm of any range as required at site including necessary control wire connection and testing complete all as specified and directed by EIC
Supply only in repair three phase Voltmeter digital type upto 0 to 500 Volts of size 96 mm x 96 mm of any range as required at site including necessary control wire connection and testing complete all as specified and directed by EIC
Supply only in repair temperature meter of range 0 F to 120 F or 50 dgree centigrade complete with sensor all as specified and directed.
Supply only in reapir ML-1.5, 3 pole , 415 / 440 volts (Cat No. SS-91851) 25 Amp all as speicfied and directed.
Supply only in reapir power Contactor ML-3, 3 pole, 415 Volts ,45 Amps rating including necessary electrical connection all as specified and directed by eng-in-charge.
Supply only in reapir power Contactor ML-2, 3 pole, 415 Volts ,40 Amps rating including necessary electrical connection all as specified and directed by eng-in-charge.
Supply and charging refrigerant gas Non CFC compatible to R-22/R-407 in returnable sealed cylinder all as specified and directed.
Taking out the existing filter drier I 5/8"x 5/8" dia flare type and supply & fixing new filter drier of the same type & size including repairs to flare etc at all as specified and directed by EIC
Taking out the existing drier I 1/2" X 1/2" dia flare type and supply & fixing new filter drier of the same type & size including repairs to flare etc at all as specified and directed by EIC
Supply and replacement of return air grill aluminium with powder coated white collers of size as per site requirement /as per sample/ as required on site complete all as specified and directed.
Supply and replacement of air grill MS air control damper of size 300 mm x 900 mm or as per sample as required on site complete all as specified and directed.
Supply and fixing in replacement pre filter to precipitate 5 - 10 micron air particle suitable for AHU of central type AC plant made out of extended metal frame of 20 SWG AL sheets of size 610mm x 610 mm and 50 mm thick or as per sample as required at site complete including finish with two coats of aluminium paint after necessary preparation complete all as specified and directed.
Supply and replacement of double convas connection in AHU outlet supply air with GI grame of size 1200mm x 1200mm or as per sample as required at site including tightening with GI nuts, bolts and washers complete all as specified and directed.
Taking out used compressor oil from AC plant and Supplying and filling fresh compressor oil (SEALED DRUM OF 20 LTRS)(suitable for respective models & makes BLUE STAR compressors) into the plant at different locations in Lucknow Cantt with in a distance of not exceeding 6 Km complete all as specified and directed.
S&F in repair connection plate of fibre glass with 6 way brass , heavy terminal with tripple brass nut & washer suitable for 5/7.5/10/15/20 HP motor complete all as specified and directed.
Dismantling unserviceable CT fan motor of capacity 3 HP from AC plant and taking out after disconnecting all electrical connection, foundation nuts & bolts and transporting to contractor workshop for carrying out the following repair. Opening of CT fan motor 3 HP capacity cutting the wornout winding, stripping out and cleaning the slots etc. Rewinding the CT motor 3 HP capacity with super enameled copper wire of suitable gauge to match the existing copper wire of standard make conforming to IS specification including taping, varnishing, insulating and re-assembling the motor complete. Transporting back to site after complete repairs and reinstallation at existing location and electric connection and testing on full load for satisfactory performance all as directed.
Dismantling the existing monoblock pump set capacity 3 HP from its foundation including disconnecting all the electrical and water connection etc transporting the same to contractor workshop from plant carry out the following repairs. Opening of pump & motor and cutting the wornout winding and cleaning the slots with petrol & brush and re-winding the motor with super enameled copper wire of suitable gauge to match the existing size of stranded make confirming to IS specification including taping , varnishing, insulation and re- assembling the motor complete. Re-assembling the pump and motor and reinstallation the same in existing location including connecting all electric and water connections including transportation from contractor workshop to site. Testing complete for satisfactory performance all as specified and directed.
Dismantling the existing Chiller water/Condenser water pump set capacity 5 HP from its foundation including disconnecting all the electrical and water connection etc transporting the same to contractor workshop from plant carry out the following repairs. Opening of pump & motor and cutting the wornout winding and cleaning the slots with petrol & brush and re-winding the motor with super enameled copper wire of suitable gauge to match the existing size of stranded make confirming to IS specification including taping , varnishing, insulation and re- assembling the motor complete. Re-assembling the pump and motor and reinstallation the same in existing location including connecting all electric and water connections including transportation from contractor workshop to site. Testing complete for satisfactory performance all as specified and directed.
Dismantling the existing Chiller water/Condenser water pump set capacity 7.5 HP from its foundation including disconnecting all the electrical and water connection etc transporting the same to contractor workshop from plant carry out the following repairs. Opening of pump & motor and cutting the wornout winding and cleaning the slots with petrol & brush and re-winding the motor with super enameled copper wire of suitable gauge to match the existing size of stranded make confirming to IS specification including taping , varnishing, insulation and re- assembling the motor complete. Re-assembling the pump and motor and reinstallation the same in existing location including connecting all electric and water connections and transportation from contractor workshop to site. Testing complete for satisfactory performance all as specified and directed.
Dismantling the existing Chiller water/Condenser water pump set capacity 10 HP from its foundation including disconnecting all the electrical and water connection etc transporting the same to contractor workshop from plant carry out the following repairs. Opening of pump & motor and cutting the wornout winding and cleaning the slots with petrol & brush and re-winding the motor with super enameled copper wire of suitable gauge to match the existing size of stranded make confirming to IS specification including taping , varnishing, insulation and re- assembling the motor complete. Re-assembling the pump and motor and reinstallation the same in existing location including connecting all electric and water connections and transportation from contractor workshop to site. Testing complete for satisfactory performance all as specified and directed.
Dismantling the existing Blower motor from AHU of capacity 5 HP from its foundation including disconnecting all the electrical connection etc transporting the same to contractor workshop from plant carry out the following repairs. Opening of motor and cutting the wornout winding and cleaning the slots with petrol & brush and re-winding the motor with super enameled copper wire of suitable gauge to match the existing size of stranded make confirming to IS specification including taping , varnishing, insulation and re- assembling the motor complete. Re-assembling the motor and reinstallation the same in existing location including connecting all electric and water connections and transportation from contractor workshop to site. Testing complete for satisfactory performance all as specified and directed.
Dismantling the existing Blower motor from AHU of capacity 7.5 HP from its foundation including disconnecting all the electrical connection etc transporting the same to contractor workshop from plant carry out the following repairs. Opening of motor and cutting the wornout winding and cleaning the slots with petrol & brush and re-winding the motor with super enameled copper wire of suitable gauge to match the existing size of stranded make confirming to IS specification including taping , varnishing, insulation and re- assembling the motor complete. Re-assembling the motor and reinstallation the same in existing location including connecting all electric and water connections and transportation from contractor workshop to site. Testing complete for satisfactory performance all as specified and directed.
Dismantling the existing Blower motor from AHU of capacity 10 HP from its foundation including disconnecting all the electrical connection etc transporting the same to contractor workshop from plant carry out the following repairs. Opening of motor and cutting the wornout winding and cleaning the slots with petrol & brush and re-winding the motor with super enameled copper wire of suitable gauge to match the existing size of stranded make confirming to IS specification including taping , varnishing, insulation and re- assembling the motor complete. Re-assembling the motor and reinstallation the same in existing location including connecting all electric and water connections and transportation from contractor workshop to site. Testing complete for satisfactory performance all as specified and directed.
Dismantling the existing Blower motor from AHU of capacity 12.5 HP from its foundation including disconnecting all the electrical connection etc transporting the same to contractor workshop from plant carry out the following repairs. Opening of motor and cutting the wornout winding and cleaning the slots with petrol & brush and re-winding the motor with super enameled copper wire of suitable gauge to match the existing size of stranded make confirming to IS specification including taping , varnishing, insulation and re- assembling the motor complete. Re-assembling the motor and reinstallation the same in existing location including connecting all electric and water connections and transportation from contractor workshop to site. Testing complete for satisfactory performance all as specified and directed.
Dismantling the existing Blower motor from AHU of capacity 20 HP from its foundation including disconnecting all the electrical connection etc transporting the same to contractor workshop from plant carry out the following repairs. Opening of motor and cutting the wornout winding and cleaning the slots with petrol & brush and re-winding the motor with super enameled copper wire of suitable gauge to match the existing size of stranded make confirming to IS specification including taping , varnishing, insulation and re- assembling the motor complete. Re-assembling the motor and reinstallation the same in existing location including connecting all electric and water connections and transportation from contractor workshop to site. Testing complete for satisfactory performance all as specified and directed.
Renewal of ball bearing suitable for 3HP capacity motor size all as per site requirment and specified by eng-in-charge. Make : SKF/NBC-6205-06
Renewal of ball bearing suitable for 5HP capacity motor size all as per site requirment and specified by eng-in-charge. Make : SKF/NBC-6206-07
Renewal of ball bearing suitable for 7.5HP capacity motor size all as per site requirment and specified by eng-in-charge. Make : SKF/NBC-6207-08
Renewal of ball bearing suitable for 10HP capacity motor size all as per site requirment and specified by eng-in-charge. Make : SKF/NBC-6207-08
Renewal of ball bearing suitable for 12.5HP capacity motor size all as per site requirment and specified by eng-in-charge. as per site requirment and specified by eng-in-charge. Make : SKF/NBC-6209-10
Renewal of ball bearing suitable for 20 HP capacity motor size all as per site requirment and specified by eng-in-charge. as per site requirment and specified by eng-in-charge. Make : SKF/NBC-6209-10
Renewal of cover housing including repair to main shaft and renewal of gun metal bushing all as required as per site and specified by Eng-in-charge.
S&F (in renewal) MCCB-63 Amp, microprocessor release having breaking capacity 35 kA 4 pole AC complete all as specified and directed.
S&F (in renewal) MCCB-100 Amp, microprocessor release having breaking capacity 35 kA 4 pole AC complete all as specified and directed.
S&F (in renewal) MCCB-160 Amp, microprocessor release having breaking capacity 35 kA 4 pole AC complete all as specified and directeD.
S&F (in renewal) MCCB-250 Amp, microprocessor release having breaking capacity 35 kA 4 pole AC complete all as specified and directed.
S&F (in renewal) MCCB-400 Amp, microprocessor release having breaking capacity 36 kA 4 pole AC complete all as specified and directed.
S&F (in renewal) MCCB-630 Amp, microprocessor release having breaking capacity 36 kA 4 pole AC complete all as specified and directed
Supply & fix in repair CI wafer type butterfly 65 mm dia valve, PN1.6, hand lever operated with SS shaft / Disc PTFE gland packing CCS stud and bolts Nitrile Sleeves and locking arrangement complete of following sizes/dia all as specified and directed.
All as item no 89 above 80 mm dia
All as item no 89 above 100 mm dia
Supply and fixing in replacement CT fan motor with aluminium alloy fan with 04 Nos blade with hub suitable for existing capacity and for 50 TR cooling tower complete all as specified and directed.
Supply and fixing in replacement water flow switch for Condenser/Chiller pipeline with contol wiring all as specified and directed by Eng-In-Charge.
Supply & fixing in repairs PCB with Micro computer Control LCD display suitable for 25 TR Central Ac Plant complete all as specified and directed by Eng- in -Charge.
Supply & fixing in repairs PCB with Micro computer Control LCD display suitable for 50 TR Central Ac Plant complete all as specified and directed by Eng- in -Charge.
S&F (in renewal) of condensor safety valve of ½'' size the following size to with stand the pressure upto 300 PSI :-
All as per item No 96 above but 3/8" size
Dismantling defective GM gate valve 15 mm dia at drain pipe of cooling tower of AC Plant supply & fixing new GM gate valve 15 mm dia with GI Nipple, bends etc nuts & bolts and necessary electric welding all as specified and directed.
ALLas per item No 98 but 40mm dia
ALLas per item No 98 but 65 mm dia
ALLas per item No 98 but 80mm dia
Supply and fixing in repair Expansion Valve for chiller unit of central AC plant of Cap 2X25 TR and 3x25 TR Central AC Plant as directed and specified by engineer in charge.
Supply and fixing in repair NRV Valve double flange 50 mm dia for chiller unit of central AC Plants
ALL as per item No 103 above but 80mm dia
ALL as per item No 103 above but 100mm dia
S&F in repair 150 mm dia strainer of ductile Iron body flanged ends with stainless steel strainer,existing rustling pipe cutting with nut bolt etc complete all as specified & directed by Eng- in-Charge. Sizes are following
ALL as per item No 106 above but 80 mm dia
S&f in repair V-belt for AHU motor of central AC plants all as directed and required as per site and specified by eng-in-charge.
S&F in repair O-RING set for compressor of central AC plant of wxisting make of capacity 12.5 TR(each compressor) all as per required at site and specified and directed by eng-in-charge.
Taking out unservieable blower motor of capacity 1/5 to 1/8 HP from walk in cooler and rewinding of 1 / 5 to 1 / 8 HP blower motor with the required size of super enameled copper winding wire of suitable gauge including insulation, varnishing, greasing, testing complete and transporting to back to site and refixing complete all as specified and directed.
Supply , laying , connecting , charging , testing & commissioning LT cable elecric , XLPE insulated screened PVC bedded , armoured , PVC sheathed, heavy duty LT 1100 volts grade with stranded aluminium conductor conforming to IS-7098 laid in trenches /duct/fixed to wall / roof of sizes 50 Sqmm 3.5 Core including cable glands.
ditto as item no 111 above but 70 Sqmm 3.5 Core
Excavation in trenches not exceeding 1.5m deep and not exceeding 1.5m wide and getting out in Soft/Loose soil for laying of pipes/LT cables complete all as specified and directed.
Returning filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25 cm in Soft/Loose soil complete all as specified and directed.
Removing surplus excavated material in soils not exceeding 50 mtr and depositing where directed at a level not exceeding 1.5 mtr above the starting point complete all as specified and directed.
Supply and spread sand for cushioning to UG cable including spreading leveling and hand punning etc complete all as specified in clause 19.75 of SSR Part-I.
M & L Sub class ‘B’ brick laid dry flat complete all as specified and directed
Supply and fix in repair 3 KW 415 Volts Strip heater for AC plant all as specified and directed
Supply and fix in repair 2 KW 415 Volts Strip heater for AC plant all as specified and directed
VISHAL TRADERS
COOLING CENTRE
M/s Acme Engineers and Contractors
Enviro India
Sai Enterprises
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .