| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-AOC 100 33 1 R G S ROAD USHAGRAM SALANPUR 713303 WEST BENGAL INDIA | ASANSOL | PASCHIM BARDHAMAN | WEST BENGAL | 713303 | ₹3.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.3 LRejected-Finance 0 SHANKERPURI COLONY SAHARANPUR BEHAT ROAD NEAR DEHAT KOTWALI SAHARANPUR UTTAR PRADESH 247001 UDYAM UP 64 0001066 09DFQPR2451E1Z4 B R | SAHARANPUR | UTTAR PRADESH | 247001 | ₹4.3 L | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical As per TCR |
| Sl No | Description | Qty | Unit | ELECTRO TRADING CO. L2 | ELECTRO POWER INDUSTRIES L1 |
|---|---|---|---|---|---|
| 1.00Partial Repairing of 1000 KVA/1MVA, 11KV/3.3KV Transformer of Madhaipur Colliery under Pandaveswar Area. (Inclusive of EPF/CMPF) | |||||
| 1.01 | Dismantling of core & winding from Transformer. | 1 | Kgs | 7,500 ₹7,500 | 6,000 ₹6,000 |
| 1.02 | Supply of new electrolyte grade conductor for Middle limb of Primary Coil. | 111 | Kgs | 750 ₹83,250 | 700 ₹77,700 |
| 1.03 | Supply of new electrolyte grade conductor for Middle limb of secondary Coil. | 80 | Kgs | 750 ₹60,000 | 700 ₹56,000 |
| 1.04 | Re-Insulation of copper strip by D.P.C. (Double Paper covering) of old Primary & Secondary coils of side limbs(winding) & new copper strip of Primary & Secondary Coils.(333 Kg + 240 Kg) | 573 | Kgs | 120 ₹68,760 | 100 ₹57,300 |
| 1.05 | Formation of Coil after rewinding of Primary Coil including supply of required insulating materials. | 573 | Kgs | 25 ₹14,325 | 25 ₹14,325 |
| 1.06 | Cost of Insulating material, Vernish, Pre-Compress Board paper, Oil duct, Cotton tape Webbing tape etc. | 1 | Nos | 30 ₹30 | 20,000 ₹20,000 |
| 1.07 | Fitting of core Channel s Primary & Secondary Coils. | 1 | Nos | 9,000 ₹9,000 | 8,000 ₹8,000 |
| 1.08 | Cost of brazing rupaton rod, oxygen & DA of all Primary & Secondary Coil. | 1 | Nos | 9,000 ₹9,000 | 8,000 ₹8,000 |
| 1.09 | Testing charges of the Transformer. | 1 | Nos | 11,000 ₹11,000 | 10,000 ₹10,000 |
Tender Value
₹3.9 L
EMD Value
₹4,900
Closing Date
28 Feb 2026, 6:00 pmClosed
Area Engineer(E and M)
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Paschim Bardhaman, West Bengal-713346
Partial repairing of 1000KVA,11KV/3.3KV Power Transformer of Madhaipur Colliery and Maintenance and repairing of 5MVA Power Transformer Outgoing Box of Khottadih Colliery
2026_ECL_353361_1
GM-PND/EandM/25-26/285/1602 dated 16/02/2026
Open Tender
Electrical and Maintenance Works
30 days
Khottadih Colliery and Madhaipur Colliery
Please refer Tender documents.
5 documents required · 5 mandatory
₹4,900
16 Apr 2026
18 Feb 2026
2 Mar 2026
18 Feb 2026
28 Feb 2026
18 Feb 2026
18 Feb 2026 - 21 Feb 2026
Partial Repairing of 1000 KVA/1MVA, 11KV/3.3KV Transformer of Madhaipur Colliery under Pandaveswar Area. (Inclusive of EPF/CMPF)
Dismantling of core & winding from Transformer.
Supply of new electrolyte grade conductor for Middle limb of Primary Coil.
Supply of new electrolyte grade conductor for Middle limb of secondary Coil.
Re-Insulation of copper strip by D.P.C. (Double Paper covering) of old Primary & Secondary coils of side limbs(winding) & new copper strip of Primary & Secondary Coils.(333 Kg + 240 Kg)
Formation of Coil after rewinding of Primary Coil including supply of required insulating materials.
Cost of Insulating material, Vernish, Pre-Compress Board paper, Oil duct, Cotton tape Webbing tape etc.
Fitting of core Channel s Primary & Secondary Coils.
Cost of brazing rupaton rod, oxygen & DA of all Primary & Secondary Coil.
Testing charges of the Transformer.
Less: Scrap Value
O.H. & Profit @ 10%
To & Fro Transportation charges.
P.F. @ 12.72% on Sl No. 5
Maintenance/Repairing of 5 MVA, 33KV/6.6KV Power Transformer of Khottadih Colliery under Pandaveswar Area. (Inclusive of EPF/CMPF)
Dismantling of Top Cover, Conservator Tank, and Cooling Fings Buchholz relay after drain out of complete Transformer oil & refitting.(Labour Cost)
Supply & fitting of 6.6 KV grade Secondary side bushing Insulator.(Material Cost)
Supply & fitting of 6.6 KV grade Secondary side bushing Insulator.(Labour Cost)
Supply & fitting of Secondary side Cu. Contract with all accessories (Current Carrying Contacts) of rated size & dimensions.(Material Cost)
Supply & fitting of Secondary side Cu. Contract with all accessories (Current Carrying Contacts) of rated size & dimensions.(Labour Cost)
Supply & fixing of gasket joint for top cover, Cooling Fings, Buchholz relay, explosive vent, conservator tank etc. (Material Cost)
Supply & fixing of gasket joint for top cover, Cooling Fings, Buchholz relay, explosive vent, conservator tank etc. (Labour Cost)
Uproot & Laying of 120Sq.mm 6.6KV grade PVC Cable.(Labour Cost)
End termination of Indoor type 6.6KV grade 3 core heat shrinking type cable jointing kit with copper lugs, ferrules etc. (Material Cost)
End termination of Indoor type 6.6KV grade 3 core heat shrinking type cable jointing kit with copper lugs, ferrules etc. (Labour Cost)
Cost of transportation of Tools, tackles & Labour.
Cost of Overhead & Profit @ 10%
Cost of P.F. @ 12.72% on Labour cost.
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_366147.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.41 MB
BOQ_366147.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid