| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹79.2 LAccepted-AOC VPO MORWALA TEHSIL AND DISTT CHARKHI DADRI 127307 | CHARKHI DADRI | CHARKHI DADRI | HARYANA | 127307 | 1 | Accepted-AOC Accepted | |
| 2 | 2₹87.2 L+₹8.0 L (10.0%)Rejected-AOC BHIWANI | BHIWANI | HARYANA | 127021 | 2 | Rejected-AOC Rejected due to 2nd | |
| 3 | Rejected-Technical | - | Rejected-Technical Technically not qualified | |
| 4 | Rejected-Technical | - | Rejected-Technical Technically not qualified | |
| 5 | Rejected-Technical H NO 16 SECTOR 13 PART II HISAR | HISAR | HISAR | HARYANA | - | Rejected-Technical Technically not qualified |
Tender Value
₹88.5 L
EMD Value
₹1.8 L
Closing Date
23 Aug 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Provincial Division PWD BR Br Chakrhi Dadri
Construction a link from Dadri Chirya road to Makrani Bye pass in km 0.550 in Provl. Divn. PWD BR Br., Charkhi Dadri in Charkhi Dadri District.
2021_HRY_182011_1
Dadri/88.50/Makrani by Pass
Open Tender
Civil Works - Roads
Works
180 days
Charkhi Dadri
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹1.8 L
Yes
24 Sept 2021
2 Aug 2021
24 Aug 2021
2 Aug 2021
23 Aug 2021
2 Aug 2021
120 days
Amount
Construction of Embankment CBR 8% (for new road) with approved material obtained from borrow pits, including compensation of earth, with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2, as per technical clause 305 of MORT&H specifications (Based on HSR 17.6) Note: In case the quantity of earth work calculated with NSL and finished level found to be less than 2270.14 cum. Then actual quantity (less than 2270.14 cum) will be paid. In case quantity worked out is more than 2270.14 cum, then only 2270.14 cum will be paid. Excess quantity shall be incidental to work and nothing extra will be paid. Further it shall be ensured that atleast 500 mm of sub grade with earth of CBR 8% shall be constructed at each location. Wherever any cutting of existing subgrade is required on this account excavation as well as handling and disposal of earthwork to accommodate minimum 500mm thick subgrade of minimum 8% CBR shall be carried out by the agency at his own cost. Nothing extra will be paid on this account. Before start of work, L-section shall be got approved from the employer with respect to GTS. However, typical X-section attached at section 5 of DNIT. Note:-No earth work will be allowed to be taken from PWD B&R/ ROW except for surplus earth after approval from Engineer.
Providing & laying Granular Sub-Base with Coarse Graded Material - Grading-I (Table:- 400-2) Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.of MORT&H specifications. Grading I material (Based on HSR 17.15.1) Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing, as per clause 601 of MORT&H specifications. (HSR 17.44) Note: - Minimum cement content for this item will be 150 kg. per cum of concrete as per approved job mix formula. If the cement content is more than 150 kg /cum, then the extra cement will be incidental to work and nothing shall be payable on this account.
Construction of un-reinforced M-40 grade concrete pavement with dowel jointed, over a prepared sub base with 43 grade OPC cement concrete coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a fully computerised batching and mixing plant as per approved mix design, transported to site in transit mixer with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing, complete as per clause 602 of MORT&H specifications. (minimum content of cement 440 kg/cum) (Based on HSR 17.45.6) Note: - Minimum cement content for this item will be 440 kg. per cum of concrete as per approved job mix formula. If the cement content is more than 440 kg /cum, then the extra cement will be incidental to work and nothing shall be payable on this account.
Reinforced Cement Concrete M25 grade 200 meter stone of standard design as per IRC: 8 -1980, fixing in position including painting and printing etc. complete as per technical clause 804 of MORT&H specifications (HSR 34.27.4)
Advance Direction sign board (P.I. board) 900x900 square as per IRC 67- 2012 with retro reflective Sheeting as per ASTM D 4956 09 and as per IRC 67 2012 fixed over 4 mm thick aluminium Composite material (ACM) sheeting having aluminium skin thickness of 0.4 to 0.5 mm on both sided and fixing the same with suitable size aluminium alloy rivets @ 200 mm c/c to back support frame of 25x25x3mm angle iron supported on a square hollow steel section post 60x60x3.2mm conforming to IS 4923 without cost of definition plate firmly fixed to ground in foundation concrete M-25 of size 0.45x0.45x0.75m for vertical post complete as per clause 801 of MORT&H specifications. Supplier shall provide a warranty as per clause 6.9 of IRC 67-2012 for retro reflective sheeting & a certified copy of test reports from an independent test laboratory including three year outdoor weathering test report for sheeting tested in India condition conforming to clause 6.7 of IRC 67-2012 (HSR 34.12.1) Using retro reflective Sheeting Class C as per IRC 67 2012
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m - All kinds of soil (HSR 4.14.1)
Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. (HSR 10.100.2)
Providing and Laying 600 mm Reinforced cement concrete pipe NP3 prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets 1000 mm dia, as per clause 2900 of MORT&H specifications (HSR 17.61.1) Note:- Contractor shall supply bill of manufacture of pipes. Pipes should bear name of manufacturer and ISI mark along with bill duly valid ISI certificate of manufacturer should be supply. Without these bills certificate no payment shall be released.
Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) (HSR 7.20.1)
12 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand) (HSR 11.5.3) Note: All quantities of the above materials have been worked out on the basis of theoretical quantities laid on this road. However, agency may visit site before quoting rates and assess the extent of retrieved material. There shall be no measurement after actual dismantling and if material after dismantling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of quoted rate and quantity exhibited in the BOQ shall be made. The reserve rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below the reserve price will be entertained and reserve price will be considered for all purposes in case the agency quotes lesser than reserve price.
manoj kumar contractor
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .