Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 248 1 CHHEDIPURWA STATION ROAD BEHIND GURU NANAK SCHOOL GONDA UTTAR PRADESH 271001 | GONDA | UTTAR PRADESH | 271001 | Admitted-Finance |
| 3 | Admitted-Finance UTTAR PRADESH | Admitted-Finance |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
2 May 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC GONDA
EDC GONDA
122/EDC(G)/2023-24
2024_MVVNL_920564_2
NVS-121-124/EDC(G)/2023-24
Open Tender
Electrical Works
Item Rate
180 days
EDC GONDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,540
SE EDC GONDA
₹20,000
Yes
EDC GONDA
9 May 2024
28 Mar 2024
3 May 2024
28 Mar 2024
2 May 2024
28 Mar 2024
30 Mar 2024
Amount
Loading, Unloading and safe cartage of the following materials from Electricity Store Centre, Gonda to the work site/dump site (Distance upto 70.00 km approx). All the material at Sl No. 1 shall be given by department and rest all the material including civil material will be arranged by the contractor itself. Any other material if required for completion of work which might not have been mentioned in bid document, shall be arranged by the contractor. (Decentralize material shall be given by contractor on his own cost.) (All work shall be as per RESSPO Norms.)
ST Poles (11/9 mtr long)
PCC Poles (9/8.5 mtr long)
ACSR Weasel Conductor
Different size of AB Cable
XLPE Cable Difrent size
Metering cubical/VCB/CT/PT
Other line materials
Different size of Cable Jointing kit I/D & O/D/straight through
L.T. Distribution Box
stay set complete
100/250 KVA T/F
25/63 KVA T/F
Erection of sectional double pole sectionalST pole 11 mtr long) alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site.
Erection of single PCC Poles (9/8.5 Mtr Long) for 11 KV/L.T. line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site.
Erection of sectional double pole sectional PCC pole (8.5/9 mtr long PCC Pole) alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site.
Earthing of pole with complete fitting
Erection and Grouting of stay sets alongwith complete fittings. Cement, Sand & Brick ballast provided by the contractor at his own cost.
Grouting of Poles with 1:4:8 CC ratio of cement, sand & brick ballast, backfilling of pits with mud completely.All required materials provided by the contractor at his own cost.
Laying, stringing, sagging & binding of conductors of 11 KV in 3 phase, 3 wire line with jumpering (where as required)
Construction of 11/0.4 KV S/S for following capacity of T/F with mounting and fitting of T/F on plinth/double pole with proper fitting of all acessories and connecting with all circuit including earthing of T/F fitting with all accessories. (All types of clamps, Nut & Bolt, shackle insulator and stay guy insulator as well as other decentralize material (which is not given by store) shall be given by the contractor on his own cost.
25/63 KVA T/F
Instalation of metering cubicle/VCB/CT/PT with complete fitting
Laying, Stringing & Sagging of ABC Cable up to proper sag for the different size cable
Mounting and fixing of L.T. Distribution Box alongwith fitting of all accessories.
Cutting of tree branches for cleaning route of 11 KV/LT line at the work site (25 mtr.= 1 Job)
Gaurding of 11 KV line with complete fittings.
Fitting & Fixing of different size Cable Jointing kit O.D. & I.D./straight through
Straightening of tilted Pole in existing line with safe opening of conductor thereafter straightening of pole then resagging & rebinding of conductor
Dismetling of old 11 KV/L.T. line
Laying Stringing sagging & Binding of All size XLPE cable OH/UG, wher is required as per estimate (Single Circuit)
Resagging of loose conductor of 11 KV/L.T. line with safe opening of conductor then tightening, sagging and binding of conductor with all accessories.
Bundling, Wrapping and Carriage of Scrap/ Conductor from worksite to ESC Gonda.
Construction of plinth with fencing as per RESSPO norms.
Pipe Earthing/Camical Earthing (it will be supplied by the contractor)
supply and errection of all types of clamps for PCC/STP
Supply and errectio of Nut and bolt off size
Supply and errection of loop insulatior
Supply and errection of stone pad
Supply and errection of LT clamp for PCC and STP
Supply and errection of shackle insulator
Supply and errection of Danger board with barbed wire with complete fitting
Supply and errection of F-Clamp
Supply and errection of Earthing Rod
SHIVAM CONSTRUCTION
M/s Janta Enterprises
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .