Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹30 L
Closing Date
27 Jul 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
PR & CC
This tender is floated for Construction of 1X1000MT capacity MSV at Jabalpur LPG Plant.
20000254-HD-10157
20000254-HD-10157
Open Tender
Two Bid
Jabalpur, Madhya Pradesh
₹0
₹30 L
27 Jul 2020
6 Jul 2020
27 Jul 2020
27 Jul 2020
6 Jul 2020 - 15 Jul 2020
13 Jul 2020
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | AREA CLEANING | AREA CLEANING — CLEARING OF ALL VEGETATION STUMPS, BUSHES, LOGS AND OTHER PERISHABLE AND OBJECTIONABLE ORGANIC MATERIALS, REMOVAL OF TOP 75 MM OF SOIL FROM THE AREAS TO BE DEVELOPED INCLUDING CARTING AWAY, DISPOSING, BURNING, STACKING, SPREADING ETC ANYWHERE WITHIN THE PLOT AS SPECIFIED AND DIRECTED. | - | Square Meters |
| 2 | EARTHWORK EXCN UPTO | EARTHWORK EXCN UPTO — EXCAVATION DEPTH UPTO 0 TO 2 METERS. EXCAVATION FOR DEPTHS UP TO AND INCLUDING 2 METERS EXCEPT HARD ROCK BUT INCLUDING SOFT ROCKS. EARTHWORK IN EXCAVATION FOR GENERAL SITE GRADING, EXCAVATION FOR INSTALLATION OF UNDERGROUND PIPELINES, PEDESTALS, COLUMNS/FOOTINGS OF STRUCTURE SHEDS, ROADS, CULVERTS, PITS, TRENCHES, ETC. OR ANY OTHER PLACE AS DIRECTED, IN ORDINARY SOILS INCLUDING SOFT ROCK/DISINTEGRATED ROCK, SHORING, STRUTTING AS DIRECTED/WHEREVER REQUIRED, IN VARIOUS TYPES OF FOUNDATION PITS AND OTHER PLACES WITH EXCAVATED SUITABLE SURPLUS EARTH, INCLUDING RECLAIMING FROM SPOIL HEAPS KEPT ELSEWHERE INCLUDING DRESSING AND LEVELING, WATERING AND MECHANICAL COMPACTION ETC. AND INCLUDING REMOVAL OF STUMPS/ROOTS TO FULL EXTENT REMOVAL OF ALL VEGETATION INCLUDING BUSHES/GRASS/TREES/PLANTS, DEWATERING, REMOVAL OF WATER, TAKING SPOT LEVELS AT 5 METER C/C IN GRID PATTERN FOR TANK FARM AREA AND OTHER AREAS AS ADVISED BY EIC, LEVELING, DRESSING AND ROLLING THE EXCAVATED SURFACE, LOADING, TRANSPORTATION OF SURPLUS EARTH TO AN UNOBJECTIONABLE PLACE INSIDE/OUTSIDE THE HPCL DEPOT PREMISES DEPENDING UPON THE SITUATION, SPREADING, LEVELING AS PER INSTRUCTIONS OF THE ENGINEER IN CHARGE (EIC). JOB TO BE CARRIED OUT AS DETAILED UNDER STANDARD SPECIFICATION FOR EXCAVATION, CARTING AWAY SURPLUS EARTH PROVIDED UNDER TECHNICAL SPECIFICATIONS SECTION OF THIS TENDER. THE MEASUREMENT FOR PAYMENT SHALL BE FOR THE THEORETICAL VOLUME ONLY BASED ON INITIAL AND FINAL LEVELS JOINTLY RECORDED. NOTE: THE CONTRACTOR SHALL TAKE INTO ACCOUNT IN HIS RATE, THE PROVISION FOR EXCESS EXCAVATION FOR NECESSARY WORKING SPACE, SLOPE, AND STEPS ETC. REQUIRED FOR EXCAVATION, SAFETY AND OTHER ALLIED WORKS AND REFILLING THE SIDE SLOPES AND WORKING SPACE ETC. | - | Cubic Meters |
| 3 | EARTHWORK EXCN >2mt to | EARTHWORK EXCN >2mt to — EXCAVATION DEPTH GREATER THAN 2 METER UPTO 4 METER: EXCAVATION FOR DEPTHS ABOVE 2.0 METER AND UPTO 4.0 METER IN ANY TYPE OF SOIL INCLUDING HARD ROCK. EARTHWORK IN EXCAVATION FOR GENERAL SITE GRADING, EXCAVATION FOR INSTALLATION OF UNDERGROUND PIPELINES, PEDESTALS, COLUMNS/FOOTINGS OF STRUCTURE SHEDS, ROADS, CULVERTS, PITS, TRENCHES, ETC. OR ANY OTHER PLACE AS DIRECTED, IN ORDINARY SOILS INCLUDING SOFT ROCK/DISINTEGRATED ROCK, SHORING, STRUTTING AS DIRECTED/WHEREVER REQUIRED, IN VARIOUS TYPES OF FOUNDATION PITS AND OTHER PLACES WITH EXCAVATED SUITABLE SURPLUS EARTH, INCLUDING RECLAIMING FROM SPOIL HEAPS KEPT ELSEWHERE INCLUDING DRESSING AND LEVELING, WATERING AND MECHANICAL COMPACTION ETC. AND INCLUDING REMOVAL OF STUMPS/ROOTS TO FULL EXTENT REMOVAL OF ALL VEGETATION INCLUDING BUSHES/GRASS/TREES/PLANTS, DEWATERING, REMOVAL OF WATER, TAKING SPOT LEVELS AT 5 M C/C IN GRID PATTERN FOR TANK FARM AREA AND OTHER AREAS AS ADVISED BY EIC, LEVELING, DRESSING AND ROLLING THE EXCAVATED SURFACE, LOADING, TRANSPORTATION OF SURPLUS EARTH TO AN UNOBJECTIONABLE PLACE INSIDE/OUTSIDE THE HPCL DEPOT PREMISES DEPENDING UPON THE SITUATION, SPREADING, LEVELING AS PER INSTRUCTIONS OF THE ENGINEER IN CHARGE (EIC). JOB TO BE CARRIED OUT AS DETAILED UNDER STANDARD SPECIFICATION FOR EXCAVATION, CARTING AWAY SURPLUS EARTH PROVIDED UNDER TECHNICAL SPECIFICATIONS SECTION OF THIS TENDER. THE MEASUREMENT FOR PAYMENT SHALL BE FOR THE THEORETICAL VOLUME ONLY BASED ON INITIAL AND FINAL LEVELS JOINTLY RECORDED. NOTE: THE CONTRACTOR SHALL TAKE INTO ACCOUNT IN HIS RATE, THE PROVISION FOR EXCESS EXCAVATION FOR NECESSARY WORKING SPACE, SLOPE, STEPS ETC. REQUIRED FOR EXCAVATION, SAFETY AND OTHER ALLIED WORKS AND REFILLING THE SIDE SLOPES AND WORKING SPACE ETC. | - | Cubic Meters |
| 4 | EXCAVATION IN HARD ROCK | EXCAVATION IN HARD ROCK — EARTHWORK IN EXCAVATION FOR FOUNDATIONS OF BUILDINGS, ROADS, DRIVEWAYS, PEDESTALS ETC. OR ANY OTHER PLACE AS DIRECTED BY EIC, IN ORDINARY SOILS INCLUDING SOFT ROCK / DISINTEGRATED ROCK, IN BOTH DRY AND WET CONDITIONS, INCLUDING PUMPING AND BAILING OUT SURFACE AND SUBSOIL WATER, SHORING, STRUTTING, SLUSH REMOVAL, INCLUDING BACKFILLING ETC, IN LAYERS OF 150MM AT ALL HEIGHTS AND DEPTHS AS PER DRAWING AND SPECIFICATIONS WHEREVER REQUIRED , IN FOUNDATION PITS, UNDER FLOORS AND OTHER PLACES WITH EXCAVATED SUITABLE SURPLUS EARTH, INCLUDING RECLAIMING FROM SPOIL HEAPS KEPT ELSEWHERE INCLUDING DRESSING AND LEVELING, WATERING AND MECHANICAL COMPACTION ETC. TRANSPORTING SURPLUS SOIL TO UNOBJECTIONABLE PLACE WITHIN ISLAND BOUNDARY LIMITS AND SPREADING IN LAYERS AND AS PER SPECIFICATIONS AND DIRECTION OF ENGINEER. THE MEASUREMENT FOR PAYMENT SHALL BE FOR THE THEORETICAL VOLUME ONLY AND IT SHALL BE THE VOLUME OF THE BLOCK OF THE EXCAVATION HAVING MAXIMUM BOTTOM DIMENSION OF THE FOUNDATION AS PER DRAWING AND TO ACTUAL DEPTH. HARD ROCK (UP TO A DEPTH OF 1.5 METER) | - | Cubic Meters |
| 5 | SHORING & STRUTTING | SHORING & STRUTTING — SHORING AND STRUTTING: DESIGN AND SUPPLYING, FIXING AND MAINTAINING NECESSARY SHORING AND STRUTTING AS REQUIRED AS PER SITE CONDITION AND BRACING ETC., IN STEEL OR WOOD, AS MAY BE REQUIRED TO SUPPORT THE SIDES OF THE EXCAVATION, TO PROTECT WORKMEN IN THE TRENCH AND TO PREVENT ANY TRENCH MOVEMENT WHICH MIGHT ANY WAY INJURE OR DELAY THE WORK, CHANGE THE REQUIRED WIDTH OF THE TRENCH, MAKE UNSAFE CONDITION FOR ADJACENT PAVEMENTS, UTILITIES, BUILDINGS OR OTHER STRUCTURES ABOVE OR BELOW GROUND. SHEATHING, SHORING AND BRACING SHALL BE WITHDRAWN AND REMOVED AS THE BACKFILLING IS BEING DONE, EXCEPT WHEN THE ENGINEER MAY AGREE THAT SUCH SHORING AND STRUTTING AND BRACING BE LEFT IN PLACE, AT THE CONTRACTOR''S REQUEST. IN ANY CASE, THE CONTRACTOR SHALL CUT OFF ANY SUCH SHEATHING ATLEAST 600 MM BELOW THE SURFACE AND SHALL REMOVE THE CUT OFF MATERIAL FROM THE TRENCH. ALL SHEATHING, SHORING AND BRACING WHICH IS LEFT IN PLACE UNDER THE FOREGOING PROVISIONS SHALL BE REMOVED IN A MANNER SO AS TO NOT ENDANGER THE COMPLETED WORK OR OTHER STRUCTURES, UTILITIES OR PROPERTY, WHETHER PUBLIC OR PRIVATE. BELOW THE GROUND LEVEL FROM 0 TO 3 M | - | Square Meters |
| 6 | FILLING EXCAVATED EARTH | FILLING EXCAVATED EARTH — BACKFILLING: BACKFILLING AROUND SUB-STRUCTURE/FOUNDATION ETC. WITH SERVICEABLE AND REUSABLE SOILS AVAILABLE FROM EXCAVATION AND STACKED EARLIER WITHIN THE PLANT BOUNDARY AT UNOBJECTIONABLE AREA INCLUDING RE-EXCAVATING, SHIFTING AND TRANSPORTATION TO THE SITE OF BACKFILLING, BACKFILLING IN LAYERS OF 200 MM WITH MECHANICAL COMPACTOR; WATERING; COMPACTING; TESTING TO ACHIEVE 95% MDD AS PER LAB RESULTS AND GRADING/LEVELLING TO ACHIEVE DESIRED LEVELS AS PER HPCL IN CHARGE ALL COMPLETE AS PER INSTRUCTIONS OF EIC. COMPLETE AS PER INSTRUCTION OF HPCL EIC/OWNER WITH EXCAVATED EARTH FROM WITHIN PLANT PREMISES. | - | Cubic Meters |
| 7 | SUP&LAYNG WSEL LAYER | SUP&LAYNG WSEL LAYER — SUPPLYING AND LAYING OF WSEL LAYER IN DENSE TO VERY DENSE CONDITION USING 150 MM TO 180 MM SIZED BASALT OR GRANITE STONES WITH INTERSTICES PACKED WITH SPALLS AND STONE DUST AND WATERING COMPACTING WITH VIBRO-ROLLER TO ACHIEVE THE DESIRED COMPACTION AS PER THE DETAILED PROCEDURE OF CONSTRUCTION AND COMPACTION OF WSEL GIVEN IN THE TENDER SPECIFICATIONS, FILLING IN LAYERS, INCLUDING THE COST OF ALL LABOUR, MATERIAL, EQUIPMENT, LEAD, LIFT ETC. ALL COMPLETE AS PER TECHNICAL SPECIFICATIONS AND AS DIRECTED BY THE ENGINEER-IN-CHARGE. THE COMPACTION OF EACH LAYER IS DEEMED TO BE ACHIEVED ONLY WHEN 98% MDD IS ACHIEVED FOR THE LAYER OF MURRUM/SERVICEABLE EARTH LAID IMMEDIATELY ABOVE THE WSEL LAYER AND THE MURRUM DOES NOT UNDERGO FURTHER COMPRESSION AS WITNESSED BY OBSERVING THE LEVELS. | - | Cubic Meters |
| 8 | SUP & FLG OF MURRUM | SUP & FLG OF MURRUM — SUPPLYING & PROVIDING APPROVED QUALITY MURRUM OF PI NOT GREATER THAN 15 AND LABORATORY MDD NOT LOWER THAN 1.7 G/CC FOR FILLING AS PER TENDER SPECIFICATION FOR BACK FILLING, SUB-GRADE & PLINTH FILLING, AROUND THE FOUNDATION, ETC AS APPLICABLE INCLUDING COST OF SUPPLY OF MURRUM FROM BORROW PITS OUTSIDE HPCL PLANT; TESTING, SPREADING IN LAYERS OF 200 MM THICK, WATERING AND COMPACTING WITH PLATE VIBRATOR/HAND COMPACTOR AS DECIDED BY THE SITE-IN-CHARGE TILL MIN. 95%MDD OF LAB STANDARD PROCTOR TEST IS ACHIEVED; TESTING; COMPLYING ALL THE REQUIREMENT OF MINING DEPT/APPLICABLE DEPT OF UT OF D&NH; ROW PAYMENTS; TRANSPORTATION TO SITE FOR ALL APPLICABLE LEADS & LIFTS COMPLETE IN ALL RESPECT AS PER TENDER SPECIFICATION/SCOPE OF WORK ETC, AS DIRECTED BY HPCL EIC. QUOTED RATES ARE DEEMED TO INCLUDE DRESSING UP THE SURFACE, BREAKING CLODS, REMOVAL OF SLUSH AND WATER, REMOVAL OF SURPLUS EARTH AFTER FORMATION, WATERING RE-HANDLING AT SITE AND CONDUCTING INITIAL LABORATORY TESTS ON SAMPLES AND CONSEQUENT INSTITUTE DRY DENSITY/OMC TESTS AT 500 SQM OF AREA AFTER EACH LAYER OF FILLING. THE INITIAL FILLING SHOULD START ONLY AFTER STRIPPING THE AREA FROM BUSHES, GRASS AND OTHER VEGETATION. NO SEPARATE PAYMENT WILL BE MADE FOR CLEARING BUSHES, VEGETATION AND OTHER MATERIALS. JOB TO BE COMPLETED AS PER ATTACHED TECHNICAL SPECIFICATION AND AS DIRECTED BY HPCL EIC COMPLETE.CONTAINING NOT MORE THAN 20% COHESIVE FINES NAMELY CLAY, 20MM AND DOWN SIZE GRADING | - | Cubic Meters |
| 9 | SUP & FLG RIVER SAND | SUP & FLG RIVER SAND — SUPPLYING AND FILLING APPROVED QUALITY LOCALLY AVAILABLE BEST QUALITY SLAG SAND IN LAYERS OF COMPACTED THICKNESS 250 MM EACH. RATE TO INCLUDE ARRANGING FOR APPROVED SLAG FROM OUTSIDE PLANT PREMISES, PAYMENT OF ALL ROYALTIES, TAXES, CESS, ETC TO THE STATUTORY AUTHORITY, LOADING, TRANSPORTATION, UNLOADING, REMOVAL OF DEBRIS, ORGANIC MATTER ETC, SPREADING IN LAYERS, WATERING, ROLLING AND COMPACTING EACH LAYER WITH 10 METER VIBRO ROLLER TILL MAXIMUM COMPACTION IS ACHIEVED AND FINISHING TO SLOPES AND GRADES AS PER DRAWINGS SPECIFICATIONS AND INSTRUCTIONS OF ENGINEER IN CHARGE. RATE SHALL BE APPLICABLE FOR ALL DEPTHS/HEIGHT BELOW/ABOVE NGL UPTO 1.5 METER. NOTE: SLAG SAND OF GRAIN SIZES 5 MM TO 0.075 MM WITH 10% FINES AND ROLLED WITH VIBRO ROLLER TO BE USED TO OBTAIN DENSE TO VERY DENSE LAYERS. FOLLOW THE PROCEDURE OF CONSTRUCTION AND COMPACTION AS STATED IN TENDER DOCUMENT. | - | Cubic Meters |
| 10 | SUP&FLG MACHINE SAND | SUP&FLG MACHINE SAND — M-SAND FILLING-LAYERS < 150 MM: SUPPLY AND FILLING WITH CLEAN M-SAND OF APPROVED QUALITY IN LAYERS OF 150 MM EACH INCLUDING SPREADING, COMPACTING BY HAND RAMMING AND WATERING ETC, ALL COMPLETE AS PER DIRECTION OF ENGINEERING-IN-CHARGE. MEASUREMENT BASIS COMPACTED THICKNESS ONLY. | - | Cubic Meters |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
20000254-HD-10157.pdf
TENDER_DOCUMENT • 16.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .