| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-Finance 5A 582 CALDWELL COLONY TUTICORIN 628008 | TUTICORIN | THOOTHUKUDI | TAMIL NADU | 628008 | ₹1.2 Cr | L1 | Accepted-Finance L1 bidder |
| 2 | L2₹1.2 Cr+₹1.1 L (0.91%)Rejected-Finance | ₹1.2 Cr+₹1.1 L (0.91%) | L2 | Rejected-Finance L2 bidder |
| 3 | L3₹1.3 Cr+₹10.7 L (9.08%)Rejected-Finance 2 1 184 SALEM MAIN ROAD KUNJANDIYUR GONUR POST METTUR DAM 636404 SALEM DIST | METTUR DAM | SALEM | TAMIL NADU | 636404 | ₹1.3 Cr+₹10.7 L (9.08%) | L3 | Rejected-Finance L3 bidder |
| 4 | L4₹1.4 Cr+₹23.8 L (20.2%)Rejected-Finance C3 SIDCO INDUSTRIAL ESTATE METTUR DAM 636 402 | METTUR DAM | SALEM | TAMIL NADU | 636402 | ₹1.4 Cr+₹23.8 L (20.2%) | L4 | Rejected-Finance L4 bidder |
| 5 | L5₹1.5 Cr+₹31.0 L (26.3%)Rejected-Finance NO 69 1 A BLOCK 11TH STREET ANNA NAGAR EAST CRYSTAL COURT A BLOCK 11TH STREET ANNA NAGAR EAST CHENNAI TAMIL NADU 600102 | CHENNAI | TAMIL NADU | 600102 | ₹1.5 Cr+₹31.0 L (26.3%) | L5 | Rejected-Finance L5 bidder |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
27 Feb 2023, 2:00 pmClosed
Chief Engineer Hydro
Chief Engineer/ Hydro TANGEDCO 5th Floor, Eastern Wing, NPKRR Maaligai, 144, Anna Salai, Chennai 600 002.
Replacement of existing eroded and misaligned penstocks expansion joint bits near anchor no. 3, 4, 5 of Unit 1 and anchor no. 2 of Unit 2 of Sholayar Power House I in Kadamparai Generation Circle.
2023_EB_287187_1
HE2450
Open Tender
Electrical and Maintenance Works
Item Rate
90 days
Kadamparai
Refer Specification HE2450
3 documents required · 3 mandatory
₹0
₹1.4 L
Yes
19 May 2023
9 Feb 2023
28 Feb 2023
9 Feb 2023
27 Feb 2023
10 Feb 2023
Amount
I.DISMANTLING Charges for providing adequate jacks so as to support the Upstream and Downstream pipe lines near Penstock anchor no. 3, 4, 5 of Unit -I and anchor no: 2 of Unit 2 in Sholayar PH 1 and ensure the existing inclined position during dismantling. (Suitable supporting Jacks shall be arranged in Contractor’s Scope)
Charges for providing temporary structure arrangement, Scaffolding arrangements, Chain pulley blocks & Pull lifts so as to facilitate to cut, dismantle, lift and lead the dismantled corroded penstock expansion joint bit from its position near anchor no. 3, 4, 5 of Unit -I and anchor no: 2 of Unit 2 in Sholayar PH 1 and dismantling the same after completion of erection works.
Charges for dismantling upstream & downstream manhole dummies near work spot and Anchor No.8 of unit – I & II so as to evacuate cutting & welding fumes away and re-assemble the same after completion of erection works.
Charges for providing adequate sand bunds either at downstream of butterfly valve or at Power Tunnel so as to arrest the water leak for cutting & welding works and remove the same after completion of erection works.
Charges for dismantling existing corroded Penstock Expansion Joint bit. i. 0.5 mtr towards upper side from the Upper Stiffener. ii. At the reduced end of lower side of downstream pipeline.
Charges for providing temporary dummy plate at the open portion of downstream pipe line so as to prevent entry of wild animals in penstock pipe line. (Dummy plate will be supplied by TANGEDCO).
II.MATERIAL TESTING, PROCUREMENT AND TRANSPORTING Transportation charges for the dismantled expansion joint bit from the work spot to nearest approaching road through inclined hill surface by using temporary Rails / winch or any other arrangements so as to shift the expansion joint bit to Contractor work premises for exact measurement for new fabrication.
Materials testing charges to assess the material composition of the existing expansion joint bit materials and obtain the test certificate and charges for exact measurement of the dismantled expansion joint bits and measurement for open end portions at Upstream and Downstream pipe lines and inclined angle at work spot in presence of TANGEDCO officials.
Charges for procurement of new materials as per the material of composition of existing expansion joint bit and test the material composition for new materials in presence of TANGEDCO Officials.
Charges for transportation of newly fabricated expansion joint bit to nearest approaching road of work spot at Sholayar Power House 1 including leading and lifting.
Charges for shifting of newly fabricated expansion joint bit from nearest approaching road to work spot through inclined hill surface by using temporary Rails / winch or any other arrangements.
Charges for conducting mandatory welding test for entire 360ͦ inner & outer welding lines after completion of welding works at supplier’s site premises.
Charges for transportation of dismantled scrap expansion joint bit to Central Store KPH or Udumalpet EDC Central Store.
III.FABRICATION OF MATERIAL Complete Fabrication charges for the following pieces for newly fabricated expansion joint bit as per approved drawing. i. Upstream pipe bit along with 2 No’s of inner side Guiding Flats and one end with Flange arrangement. ii. Downstream pipe bit one end with Flange arrangement. iii. Metal Stopper Ring iv. Clamping Ring with Flange arrangement. v. Stiffener for Upstream pipe line. vi. Stiffener for Downstream pipe line.
Charges for conducting mandatory welding test for entire 360ͦ inner & outer welding portions after completion of welding works at work spot.
Additional consumables such as 25mm Round Rubber Cord, 25Sq.mm FMP 211 Gland Packing Rope – 39 mtr length and 40 sets of High Tensile Fasteners (Stud - 40 No’s and Nut - 120 No’s)
Charges for sand blasting so as to remove the mill dust and other particles and prepare the surface for applying of painting works.
IV.ASSEMBLING Charges for positioning the newly fabricated expansion joint bit to its original position by using temporary structure arrangement, Chain pulley blocks & Pull lifts. (i.e. after dismantling of temporary dummy plate at downstream pipe line).
Charges for making ‘V’ Groove, surface preparation & complete welding charges for inner & outer longitudinal and circumferential portions with existing Upstream & Downstream pipelines without disturbing its inclined angle by using electric fusion welding and engaging qualified IBR welders.
Charges for pull out the metal stopper ring from swept area and providing rubber cord initially and insert the stopper ring inside and providing 25Sq.mm FMP 211 Gland Packing ropes one by one and tight the Clamping Ring uniformly.
Painting charges along with paint materials for applying of following Primer & Paints. i. Epoxy Polyamide Zinc Phosphate Primer (70 - 75 microns). ii.Epoxy Polyamide MIO (Micaceous Iron Oxide) Undercoat (100–110 microns). iii.Chlorinated Rubber Top coat (100– 110 microns).
CGST in % (For Bidders inside TamilNadu)
SGST in % (For Bidders inside TamilNadu)
IGST in % (For Bidders outside TamilNadu)
Raju Engineering Industries
SAMY CONSTRUCTION
ANBU ENGINEERING INDIA PRIVATE LIMITED
SREE RAGAVENDRA INDUSTRIAL ENGINEERS
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .