| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.7 LAccepted-AOC | L1 | Accepted-AOC as per uploaded docs | |
| 2 | L2₹32.7 L+₹8,177.66 (0.25%)Rejected-AOC GRAM POST CHANGORI KARNAIGANG DISTRICT GONDA UTTAR PRADESH | KARNAILGANJ | GONDA | UTTAR PRADESH | L2 | Rejected-AOC as per uploaded docs | |
| 3 | L3₹33.2 L+₹53,734.48 (1.65%)Rejected-AOC VILU TULSIPUR POST MOTIGANJ GONDA | GONDA | UTTAR PRADESH | 271001 | L3 | Rejected-AOC as per uploaded docs |
| Sl No | Description | Qty | Unit | M/S ANIL KUMAR SINGH CONSTRUCTION AND GENERAL ORDER SUPPLIERS | VIBHAV ENTERPRISES | M/S LAXMI NARAIN CONTRECTOR AND SUPPLIERS |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in making diversion including all lead & lift, with manual compaction and dressing to profile. | 355.5 | M3 | 87,236.15 ₹87,236.15 | 86,002.56 ₹86,002.56 Lowest | 87,797.84 ₹87,797.84 |
| 2.00 | BOE soling on ramp/diversion with S.O.B. bricks including preparation subgrade and filling joints with local sand including cost of all material | 127.5 | M2 | 60,557.4 ₹60,557.4 | 59,700.6 ₹59,700.6 Lowest | 61,008.75 ₹61,008.75 |
| 3.00 | Constructing stopper/ safety wall for safe traffic movment & giving proper direction to the moving vechicles with S.O.B. brick in mud mortar including cost of all material, labour and T&P etc. required for proper completion completion of the work. | 7.05 | M3 | 30,240.83 ₹30,240.83 | 31,222.97 ₹31,222.97 | 30,207.49 ₹30,207.49 Lowest |
| 4.00 | Cement plaster in 1:6 C.M. Upto 12mm thick with local sand on brick masornary of stopper wall including cost of all material , labour , T &P etc required for proper completion of the work. | 37.52 | M2 | 7,796.28 ₹7,796.28 | 7,685.97 ₹7,685.97 Lowest | 7,886.33 ₹7,886.33 |
| 5.00 | Earth work in excavation of foundation in all type of soil with all lead ,lift & proper disposal of earth and back filling etc. required for proper completion of the work. | 718.45 | M3 | 63,977.97 ₹63,977.97 | 63,072.73 ₹63,072.73 Lowest | 63,877.39 ₹63,877.39 |
| 6.00 | Centering & shuttering for R.C.C. Work including cost of materials, upto 3M Span | 156.8 | M2 | 1,57,946.21 ₹1,57,946.21 | 1,55,710.24 ₹1,55,710.24 Lowest | 1,57,999.52 ₹1,57,999.52 |
| 7.00 | Centering & shuttering for C.C. Work including cost of materials. | 27.17 | M2 | 10,755.47 ₹10,755.47 | 10,603.29 ₹10,603.29 Lowest | 10,738.08 ₹10,738.08 |
| 8.00 | Laying P.C.C. in 1:3:6 in foundation with 20-40 mm size Stone grit & coarse sand having F.M. not less than 2.0 including cost of all material, labour and T&P etc. required for proper completion of the work. | 5.29 | M3 | 49,209.64 ₹49,209.64 | 48,513.39 ₹48,513.39 | 47,129.2 ₹47,129.2 Lowest |
| 9.00 | Laying C.C. in 1:2:4 with 10 to 20 mm size crushed Stone grit & coarse sand having F.M. not less than 2.0 including cost of all material, labour and T&P etc. required for proper completion of the work. | 24.06 | M3 | 2,42,954.27 ₹2,42,954.27 | 2,39,516.58 ₹2,39,516.58 | 2,33,906.99 ₹2,33,906.99 Lowest |
| 10.00 | Laying R.C.C. in 1:1:2 (M-25) in wall & slab with 10 to 20 mm size crushed Stone grit & coarse sand having F.M. not less than 2.0 including cost of all material, labour and T&P etc. required for proper completion of the work. | 116.71 | M3 | 12,05,080.94 ₹12,05,080.94 | 11,88,030.77 ₹11,88,030.77 | 11,64,247.61 ₹11,64,247.61 Lowest |
Tender Value
₹33.6 L
EMD Value
₹67,000
Closing Date
10 Jun 2025, 11:00 amClosed
E.E.
SNK-1, GONDA
Construction of V.R.B. (R.C.C. Box culvert) at Km. 85.595 of Tarabgang Branch.
2025_UPIDC_1038746_6
01/EE/2025-26
Open Tender
Civil Works
Item Rate
180 days
Gonda
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹67,000
Yes
13 Aug 2025
4 Jun 2025
10 Jun 2025
4 Jun 2025
10 Jun 2025
4 Jun 2025
Earth work in making diversion including all lead & lift, with manual compaction and dressing to profile.
BOE soling on ramp/diversion with S.O.B. bricks including preparation subgrade and filling joints with local sand including cost of all material
Constructing stopper/ safety wall for safe traffic movment & giving proper direction to the moving vechicles with S.O.B. brick in mud mortar including cost of all material, labour and T&P etc. required for proper completion completion of the work.
Cement plaster in 1:6 C.M. Upto 12mm thick with local sand on brick masornary of stopper wall including cost of all material , labour , T &P etc required for proper completion of the work.
Earth work in excavation of foundation in all type of soil with all lead ,lift & proper disposal of earth and back filling etc. required for proper completion of the work.
Centering & shuttering for R.C.C. Work including cost of materials, upto 3M Span
Centering & shuttering for C.C. Work including cost of materials.
Laying P.C.C. in 1:3:6 in foundation with 20-40 mm size Stone grit & coarse sand having F.M. not less than 2.0 including cost of all material, labour and T&P etc. required for proper completion of the work.
Laying C.C. in 1:2:4 with 10 to 20 mm size crushed Stone grit & coarse sand having F.M. not less than 2.0 including cost of all material, labour and T&P etc. required for proper completion of the work.
Laying R.C.C. in 1:1:2 (M-25) in wall & slab with 10 to 20 mm size crushed Stone grit & coarse sand having F.M. not less than 2.0 including cost of all material, labour and T&P etc. required for proper completion of the work.
1st class brick work with 1st class brick & coarse sand having fm not less than 2.0, including cost of all material, labour and T&P etc. required for proper completion of the work.
S/F of 100 mm diadrainage spout pipe including cost of material, labour & T&P required for proper completion of the work.
Cutting, bending, binding and placing steel reinforcement including cost of binding wire and cost of steel, labour,T&P etc. required for proper completion of the work.
Laying C.C. in 1:1:2 (M-25) in Wearing Coat with 4.75 to 10 mm size crushed Stone grit & coarse sand having F.M. not less than 2.0 including cost of all material, labour and T&P etc. required for proper completion of the work.
Providing, laying, spreading and compacting stone aggregates of 22.4-53mm size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller applying and brooming, screening Type-B to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
Construction of un-reinforced, plain cement concrete pavement,thikness as per design, over a prepared sub base with 43 grade cement or as per clause 1501.2.2 M30@ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity appropriate weight batcher using approved mix design,laid in approved fixed side formwork(steel channel,laying and fixing of 125 micron thick polythene film,wedges ,steel plate including leweling the form work as per drawing),spreading the concrete with shovels,rakes,compacted using needle,screed and plate vibrators and finished in continious oparation including provision of contraction and expansion, construction joints and construction joints,admixtures as approved,curing of concrete slabs for 14 days,curing compound(where specified) and water finishing to lines and grades as per drawing and technical specification Clause 1501 in Lanes of City Portion.
Dismantalling the old and damaged brick on edge soling from diversion after completion of c work including staking of dismantled bricks
Dry brick on edge pitching on canal bank with old & dismantalled S.O.B. bricks including preparation subgrade and filling joints with local sand including cost of local sand but excluding cost of brick
Supply & Laying of Local sand in filter work including cost Material ,labour and T&P etc.
Supply & Laying of stone grit size 10 to 40 mm in filter work including cost material, labour and T&P etc.
Supply and laying stone boulder 40-60 kg including cost of all material,Carriage upto site, loading, unloading, stacking etc. required for proper completion of work.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .