Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹52.3 L
EMD Value
₹1.0 L
Closing Date
14 May 2026, 6:00 pmClosed
EX ENGINEER REW KULGAM
EX ENGINEER REW KULGAM
CONSTRUCTION OF 3-KLD FAECAL SLUDGE TREATMENT PLANT (FSTP) AT CHURAT BLOCK DEVSAR, KULGAM
2026_RDPR_308462_1
E-NIT NO-02 OF REWK 2026-27 DATED 23-04-2026
Open Tender
Civil Works
Percentage
300 days
KULGAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,500
EX ENGINEER REW KULGAM
₹1.0 L
16 May 2026
23 Apr 2026
16 May 2026
23 Apr 2026
14 May 2026
23 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydrautic-excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m² on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in Charge. All kinds of soil | 273.84 | cum | - | - |
| 2 | Hand-packing stones /Dumping stone in Horizontal on level. | 53.35 | cum | 1 | ₹53.3 |
| 3 | Carriage by Mechanical means. | 53.35 | cum | - | - |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cos of centrina and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 40.74 | cum | - | - |
| 5 | Carriage by Mechanical means. | 56.22 | cum | 1 | ₹56.16 |
| 6 | Carriage of Cement by MT | 8.96 | MT | - | - |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 5.73 | cum | - | - |
| 8 | Carriage of material By MT | 7.91 | cum | 1 | ₹7.9 |
| 9 | Carriage of cement By MT | 1.83 | MT | - | - |
| 10 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing reinforcement. All works upto plinth level 1:1.5:3 (1 and cement :1.5 coarse sand :3 graded stone aggregate 20 mm nominal size) | 92.34 | cum | - | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_999598.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .