Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹52.3 L
EMD Value
₹1.0 L
Closing Date
14 May 2026, 6:00 pmClosed
EX ENGINEER REW KULGAM
EX ENGINEER REW KULGAM
CONSTRUCTION OF 3-KLD FAECAL SLUDGE TREATMENT PLANT (FSTP) AT CHURAT BLOCK DEVSAR, KULGAM
2026_RDPR_308462_1
E-NIT NO-02 OF REWK 2026-27 DATED 23-04-2026
Open Tender
Civil Works
300 days
KULGAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,500
EX ENGINEER REW KULGAM
₹1.0 L
16 May 2026
23 Apr 2026
16 May 2026
23 Apr 2026
14 May 2026
23 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydrautic-excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m² on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in Charge. All kinds of soil | 273.84 | cum | - | - |
| 2 | Hand-packing stones /Dumping stone in Horizontal on level. | 53.35 | cum | 1 | ₹53.3 |
| 3 | Carriage by Mechanical means. | 53.35 | cum | - | - |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cos of centrina and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 40.74 | cum | - | - |
| 5 | Carriage by Mechanical means. | 56.22 | cum | 1 | ₹56.16 |
| 6 | Carriage of Cement by MT | 8.96 | MT | - | - |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 5.73 | cum | - | - |
| 8 | Carriage of material By MT | 7.91 | cum | 1 | ₹7.9 |
| 9 | Carriage of cement By MT | 1.83 | MT | - | - |
| 10 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing reinforcement. All works upto plinth level 1:1.5:3 (1 and cement :1.5 coarse sand :3 graded stone aggregate 20 mm nominal size) | 92.34 | cum | - | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_999598.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid