| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAccepted-AOC | ₹2.3 Cr | L1 | Accepted-AOC Work Awarded to M/S MURUGAN KANNAPPA |
| 2 | L2₹2.4 Cr+₹10.0 L (4.33%)Rejected-Finance | ₹2.4 Cr+₹10.0 L (4.33%) | L2 | Rejected-Finance Being L2 |
| 3 | L3₹2.5 Cr+₹18.3 L (7.96%)Rejected-Finance | ₹2.5 Cr+₹18.3 L (7.96%) | L3 | Rejected-Finance Being L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical The work done documents submitted by the bidder is of private apartment building and same is not meeting the similar work criteria against any of the clause number 1.3.5.1, 1.3.5.2 and 1.3.7 given in the tender. Hence, bidder is NOT QUALIFIED. |
| Sl No | Description | Qty | Unit | shivakumar co L3 | MURUGAN KANNAPPA L1 | PRAKASH M GAUNSKAR L2 |
|---|---|---|---|---|---|---|
| 1.00 | PART - A "Civil works"
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m | 1,300 | CuM | 200 ₹2,60,000 | 120 ₹1,56,000 Lowest | 150 ₹1,95,000 |
| 2.00 | PART - A "Civil works"
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. soft rock without blasting upto 1.5 m depth | 50 | CuM | 300 ₹15,000 Lowest | 350 ₹17,500 | 350 ₹17,500 |
| 3.00 | PART - A "Civil works"
Earth work excavation for Foundation by Mechanical means depth upto 1.50m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including cost of explosives, dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, blasting materials, tools, usage of Machinery & all other appurtenaces required to complete the work. In Hard Rock ( without blasting) Depth upto 1.50m | 50 | CuM | 400 ₹20,000 Lowest | 500 ₹25,000 | 500 ₹25,000 |
| 4.00 | PART - A "Civil works"
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 20 mm and down size graded crushed coarse aggregates. | 85 | CuM | 7,500 ₹6,37,500 | 8,000 ₹6,80,000 | 7,000 ₹5,95,000 Lowest |
| 5.00 | PART - A "Civil works"
Providing and laying in position Cement Concrete for all Foundation works below plinth beam. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, including providing fixing and removing shuttering, scaffolding, staging etc, including cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm and down size graded crushed coarse aggregates.
Note: Quoted rate shall include all the cost of shuttering, scaffolding, staging etc, and no seperate payment shall be made for the same. | 70 | CuM | 8,500 ₹5,95,000 | 8,500 ₹5,95,000 | 8,000 ₹5,60,000 Lowest |
| 6.00 | PART - A "Civil works"
Providing and laying in position Cement Concrete for all Plinth beam works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, including providing fixing and removing shuttering, scaffolding, staging etc, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm and down size graded crushed coarse aggregates.
Note: Quoted rate shall include all the cost of shuttering, scaffolding, staging etc, and no seperate payment shall be made for the same | 30 | CuM | 10,000 ₹3,00,000 Lowest | 10,500 ₹3,15,000 | 11,000 ₹3,30,000 |
| 7.00 | PART - A "Civil works"
Providing and laying in position Cement Concrete for all Super structures of building, road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm and down size graded crushed coarse aggregates. Note : Quoted rate shall include all the cost of shuttering, scaffolding, staging etc and no seperate payment shall be made for the same. | 325 | CuM | 12,000 ₹39,00,000 Lowest | 12,000 ₹39,00,000 Lowest | 13,500 ₹43,87,500 |
| 8.00 | PART - A "Civil works"
Supplying, fitting and placing TMT FE 550/550D Steel Reinforcement complete as per drawing and technical specification | 46,700 | Kg | 100 ₹46,70,000 Lowest | 100 ₹46,70,000 Lowest | 107 ₹49,96,900 |
| 9.00 | PART - A "Civil works"
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and wateringas directed by Engineer-In-charge. | 360 | CuM | 372 ₹1,33,920 | 270 ₹97,200 Lowest | 300 ₹1,08,000 |
| 10.00 | PART - A "Civil works"
Providing and laying 65 to 100mm size granite soling stones of approved quality & size for flooring base including preparation of base properly by leveling dressing & hand ramming using hand rammer with watering, providing & filling interstices using small sized stones / chips, providing & spreading binding materials such as murrum / gravel with proper watering, collecting & disposing the generated waste, from the place of work & cleaning the work area, etc. complete all as per standard technical specification, drawing and as directed by Engineer-in-charge at all locations & lifts. | 70 | CuM | 3,500 ₹2,45,000 | 2,500 ₹1,75,000 Lowest | 2,700 ₹1,89,000 |
Tender Value
₹2.6 Cr
EMD Value
₹5.2 L
Closing Date
18 Apr 2026, 5:00 pmClosed
ACE E and US and Chairman CSR
NPCIL, Kaiga Site, Kaiga-581400, karnataka
Construction of Pre-matric BC Boys Hostel at Anshi Village of Joida Taluk.
2026_NPCIL_273029_1
CPPP/2026/114
Open Tender
Civil Works - Buildings
Item Rate
548 days
Anshi, Joida
As per Tender Document
6 documents required · 6 mandatory
₹0
₹5.2 L
Office of Incharge - C and MM (WG) Kaiga Site
11 Sept 2026
28 Mar 2026
20 Apr 2026
28 Mar 2026
18 Apr 2026
9 Apr 2026
28 Mar 2026 - 4 Apr 2026
7 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PART - A "Civil works" Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m | |||||
| 2PART - A "Civil works" Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. soft rock without blasting upto 1.5 m depth | |||||
| 3PART - A "Civil works" Earth work excavation for Foundation by Mechanical means depth upto 1.50m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including cost of explosives, dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, blasting materials, tools, usage of Machinery & all other appurtenaces required to complete the work. In Hard Rock ( without blasting) Depth upto 1.50m | |||||
| 4PART - A "Civil works" Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 20 mm and down size graded crushed coarse aggregates. | |||||
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.39 MB
Tendernotice_2.pdf
PDF • 4.17 MB
Tendernotice_3.pdf
PDF • 1.49 MB
Tendernotice_4.pdf
PDF • 1.01 MB
TechnicalbidCPPP.rar
Other Document • 0.03 MB
BOQ_318657.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .