Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAdmitted-Finance | ₹9.9 L | L1 | Admitted-Finance |
| 2 | L2₹12.0 LAdmitted-Finance HIMACHAL PRADESH HP | ₹12.0 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ubish chander L2 | Mohd sohel L1 |
|---|---|---|---|---|---|
| 1.00 | Excavation in foundation trenches in all kinds of soils such as pick work, jumper work blasting hard or soft rock chiseling where blasting is prohibited slushy daldal or saturated soil within all leads and lifts , stacking the excavated soil not more than 3 mtrs clear from the edge of excavation and then returning the stacked soil in 15 cm layers when required into plinth and sides of foundations i/c consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth within all leads and lifts as per the direction of the Engineer- in-charge | 426.6 | Per Cum | 4,10,222.83 ₹4.1 L | 1,27,980 ₹1.3 L |
| 2.00 | Providng form work with steel, plates 3.15mm thick welded with angle iron in frame 30x30x5 mm so as to give a fair finish including centering, shuttering, strutting and propping etc with wooden battens and ballies, height of proping and centering below supporting floor to centring not exceeding 4 mtrs and removal of the same for insitu-reinforced concrete and plain concrete work in:-vertical surface such as walls (any thickness) pertition and the like including attached pillasters buttresses, ply and string course complete within all leads and lifts | 120 | Per Sqm | 62,005.2 ₹62,005.20 | 36,000 ₹36,000 |
| 3.00 | Prov. and laying cement concrerte 1:1 1/2 :3 (1cement:1:1 1/2 sand :3 graded stone aggregate 20mm Nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in:- (a) Foundation and plinth | 30 | Per Cum | 4,05,618.9 ₹4.1 L | 3,00,000 ₹3 L |
| 4.00 | Provding and Laying Mild steel/Tor steel reinforcement for RCC work including bending ,binding and placing in position complete upto floor two level with in all leads and lifts. | 2,700 | Per Kg | 2,80,584 ₹2.8 L | 2,43,000 ₹2.4 L |
| 5.00 | Laying,Jointing Testing and commissioning of HDPE Pipe 140 mm dia (earth work in trenches to be measurement and paid for separately) in all leads and lifts complete upto the entire satisfaction of Engineer in charge. Pe-63 PN 8 | 1,265 | Per Rmt | 46,539.35 ₹46,539.35 | 2,80,830 ₹2.8 L |
Tender Value
₹11.1 L
EMD Value
₹21,110
Closing Date
15 Dec 2025, 5:00 pmClosed
EE JSD Pooh
EE JSD Pooh
SH Laying of HDPE Pipe Providing RCC Thrust blocks from RD 00 to 7000
2025_HPIPH_122480_1
KNR-EE-Pooh-2025-10472-10572
Open Tender
Civil Works
EE Pooh
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
Yes
₹21,110
Yes
EE JSD Pooh
22 Dec 2025
3 Dec 2025
16 Dec 2025
3 Dec 2025
15 Dec 2025
3 Dec 2025
5 Dec 2025
Excavation in foundation trenches in all kinds of soils such as pick work, jumper work blasting hard or soft rock chiseling where blasting is prohibited slushy daldal or saturated soil within all leads and lifts , stacking the excavated soil not more than 3 mtrs clear from the edge of excavation and then returning the stacked soil in 15 cm layers when required into plinth and sides of foundations i/c consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth within all leads and lifts as per the direction of the Engineer- in-charge
Providng form work with steel, plates 3.15mm thick welded with angle iron in frame 30x30x5 mm so as to give a fair finish including centering, shuttering, strutting and propping etc with wooden battens and ballies, height of proping and centering below supporting floor to centring not exceeding 4 mtrs and removal of the same for insitu-reinforced concrete and plain concrete work in:-vertical surface such as walls (any thickness) pertition and the like including attached pillasters buttresses, ply and string course complete within all leads and lifts
Prov. and laying cement concrerte 1:1 1/2 :3 (1cement:1:1 1/2 sand :3 graded stone aggregate 20mm Nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in:- (a) Foundation and plinth
Provding and Laying Mild steel/Tor steel reinforcement for RCC work including bending ,binding and placing in position complete upto floor two level with in all leads and lifts.
Laying,Jointing Testing and commissioning of HDPE Pipe 140 mm dia (earth work in trenches to be measurement and paid for separately) in all leads and lifts complete upto the entire satisfaction of Engineer in charge. Pe-63 PN 8
ubish chander (BID ID -594004)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
Tendernotice_2.pdf
PDF • 0.77 MB
Tendernotice_3.pdf
PDF • 2.27 MB
Tendernotice_4.pdf
PDF • 0.19 MB
BOQ_179721.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid