Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4788.0 CrAccepted-AOC CRYSTAL TOWER 4TH FLOOR TELIBANDHA RAIPUR | RAIPUR | RAIPUR | CHHATTISGARH | ₹4788.0 Cr | L1 | Accepted-AOC LOWEST BIDDER |
| 2 | L2₹5115.0 CrRejected-Finance NCC HOUSE MADHAPUR HYDERABAD 500081 TELANGANA INDIA TELEPHONE 040 23268730 | ₹5115.0 Cr | L2 | Rejected-Finance 2ND LOWEST BIDDER |
| Sl No | Description | Qty | Unit | NCC LIMITED | Larsen & Toubro Limited |
|---|---|---|---|---|---|
| 1.00DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, INTEGRATION, TESTING AND COMMISSIONING OF ROLLING STOCK, COMMUNICATION BASED SIGNALLING & TRAIN CONTROL, TELECOMMUNICATION, PLATFORM SCREEN DOORS AND DEPOT MACHINERY & PLANT, INCLUDING 15 YEARS OF COMPREHENSIVE MAINTENANCE AFTER 2 YEARS OF DEFECT LIABILITY MAINTENANCE PERIOD FOR MUMBAI METRO LINE 4 AND EXTENSION CORRIDOR (4A) [WADALA – KASARVADAVALI - GAIMUKH] OF MUMBAI METRO RAIL PROJECT OF MMRDA | |||||
| 1.01 | WLC NPV COST | 1 | LS | 51,15,00,00,627 ₹5115.0 Cr | 47,88,00,07,186 ₹4788.0 Cr |
| 1.02 | Specific Energy Cost in Whr/GTKM | 1 | Whr/GTKM | - | 50 ₹50 |
Tender Value
₹4297.5 Cr
EMD Value
₹10 L
Closing Date
15 Nov 2024, 2:00 pmClosed
DIRECTOR SYSTEM
1ST FLOOR, A WING, OLD MMRDA BLD, BKC
DESIGN MANUFACTURE SUPPLY INSTALLATION INTEGRATION TESTING AND COMMISSIONING OF RS S AND TC TEL PSD AND DEPOT MNP INCLUDING 15 YEARS OF COMPREHENSIVE MAINTENANCE AFTER 2 YRS OF DLMP FOR MML 4 AND 4A WADALA KASARVADAVALI GAIMUKH OF MMRP OF MMRDA
2024_MMRDA_1014710_1
CA 234
Open Tender
Electrical and Maintenance Works
MUMBAI
Please refer Tender documents.
8 documents required · 8 mandatory
₹11,800
₹10 L
MMRDA BKC
19 Sept 2025
24 Feb 2024
18 Nov 2024
24 Feb 2024
15 Nov 2024
24 Feb 2024
24 Feb 2024 - 15 Apr 2024
27 Mar 2024
DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, INTEGRATION, TESTING AND COMMISSIONING OF ROLLING STOCK, COMMUNICATION BASED SIGNALLING & TRAIN CONTROL, TELECOMMUNICATION, PLATFORM SCREEN DOORS AND DEPOT MACHINERY & PLANT, INCLUDING 15 YEARS OF COMPREHENSIVE MAINTENANCE AFTER 2 YEARS OF DEFECT LIABILITY MAINTENANCE PERIOD FOR MUMBAI METRO LINE 4 AND EXTENSION CORRIDOR (4A) [WADALA – KASARVADAVALI - GAIMUKH] OF MUMBAI METRO RAIL PROJECT OF MMRDA
WLC NPV COST
Specific Energy Cost in Whr/GTKM
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid