Loading…
Loading…
Tender Value
₹1.5 L
EMD Value
₹4,455
Closing Date
16 Sept 2026, 6:55 pm4d left
office of the executive engineer rew ang
office of the executive engineer rew ang
C/O X-ING NHO MOHD YOUSUF BHAT AND OTHERS WARD NO. 5, 6, 7 BLOCK SHAHABAD
2026_RDPR_324181_64
ENIT107of2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹4,455
10 Sept 2026
10 Sept 2026
17 Sept 2026
10 Sept 2026
16 Sept 2026
10 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Eath work in excavation by mechanical means (hydrualic excvator) in foundation, trenches , drains (Exceedind 30cm in depth , 1.5 m width as well as 10 sqm in plan , Incl. disposal of excavated soil lead up 50 m | 7.14 | cum | 256.85 | ₹1,833.91 |
| 3 | providing and laying of dry stone solling hand packed tightly | 1.64 | cum | 1,228.31 | ₹2,014.43 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 0.4 | cum | 5,202.9 | ₹2,081.16 |
| 5 | Providing and laying in position specified grade of cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level, 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) with 20 % plum. | 3.37 | cum | 6,540.45 | ₹22,041.32 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.87 | cum | 9,821.85 | ₹18,366.86 |
| 7 | Providing and laying in position specified grade of Reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level, 1:1.5:3 mix (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 2.03 | cum | 7,788.4 | ₹15,810.45 |
| 8 | Reinforcment for RCC work include straightening cutting, bending, binding and placing in position all complete MT steel bars at all levels. | 382.31 | kgs | 115.35 | ₹44,099.46 |
| 9 | centering and shuttering for foundation bases footing etc | 4.28 | sqm | 286.35 | ₹1,225.58 |
| 10 | centering and shuttering for Columns, pillars, piers, abutments, posts and struts. | 19.33 | sqm | 742.55 | ₹14,353.49 |
| 11 | centering and shuttering for Suspended floors, roofs, landings, balconies and access platforms | 7.62 | sqm | 718.2 | ₹5,472.68 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.51 MB
BOQ_1093293.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .