Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.1 CrAccepted-AOC VILLAGE DUMERKHA KALAN POST OFFICE DUMERKHA KALAN TEHSIL UCHANA DISTRICT JIND 126115 HARYANA | DUMERKHA KALAN | JIND | HARYANA | 126115 | 1 | Accepted-AOC AOC | |
| 2 | 2₹1.1 Cr+₹64,610 (0.60%)Rejected-Finance C1871 SAMPLA ROHTAK ROHTAK JHAJJAR HARYANA 124501 | ROHTAK | HARYANA | 124501 | 2 | Rejected-Finance 2 | |
| 3 | 3₹1.2 Cr+₹16.3 L (15.0%)Rejected-Finance BALBEHRA VILLAGE BALBEHRA TEHSIL GUHLA KAITHAL 132027 | 132027 | 3 | Rejected-Finance 3 | |
| 4 | 4₹1.3 Cr+₹20.0 L (18.5%)Rejected-Finance H NO 341 21 MUNSHI SAINI WALI GALI SHASTRI NAGAR ROHTAK | ROHTAK | HARYANA | 124001 | 4 | Rejected-Finance 4 |
| Sl No | Description | Qty | Unit | Mukesh Kumar Contractor L3 | DHEERAJ ENTERPRISES L1 | Chahal Enterprise Rohtak L4 | HARSHITA ENGINEERING PRIVATE LIMITED L2 |
|---|---|---|---|---|---|---|---|
| 2.00Upgradation of street light pole,cable and S/E/T/C of Erection of street light fitting other contingent there in Vipul World under ward 16, Zone 1 under limit of Municipal Corporation Gurugram | |||||||
| 3.00 | Supply and erection of 2.5 sqmm 3 core unard FRLS PVC insulated ISI Marked copper conductor cable complete as per entire satisfication of engineer in charge.Make RR / Havells / Polycab/Grandley. 2.5 Sq. mm 3 Core Cable. | 5,550 | Metre | 103 ₹5,71,650 Lowest | 112 ₹6,21,600 | 103 ₹5,71,650 Lowest | 110 ₹6,10,500 |
| 4.00 | Providing trench less boring below existing road / pavement including laying of 65 mm dia GI pipe B class required to complete the job in all respect | 650 | Metre | 791 ₹5,14,150 | 30 ₹19,500 Lowest | 800 ₹5,20,000 | 350 ₹2,27,500 |
| 5.00 | Providing trench less cuttting by Hydraulic Drilling Device boring/ Manual OR through some suitable alternate method with insertion of HDPE Pipe including supply, Delivery of HDPE pipe at work site and laying of 50mm internal diameter HDPE pipe inside road for road corssing of cable by Hydraulic Drilling Device without opening of the road top surface, laid at a depth of at least 900mm below the road surface from the feeding point to the feeder pillar box in median (OR) from feeder pillar to respective street light pole including cost of all accessories for road crossing for laying of cables.. | 4,500 | Metre | 363 ₹16,33,500 | 30 ₹1,35,000 Lowest | 375 ₹16,87,500 | 250 ₹11,25,000 |
| 6.00 | Buy Back Removing of Existing Pole / With bracket and Cable including exiting foundation dismantling with all labour and material required etc to complete the job in all respect up to the in entire satisfaction of Engineer-charge-of the work.... | 100 | Each | 2,290 ₹-2,29,000 Lowest | 2,500 ₹-2,50,000 | 2,400 ₹-2,40,000 | 2,600 ₹-2,60,000 |
| 7.00 | Dismantle and Erection of street light fitting on the pole including the cost of petty material required (irrespective of height/length of bracket) At Pole above 7 metres but up to the height of 9 metres. | 100 | Each | 166 ₹16,600 | 181 ₹18,100 | 150 ₹15,000 | 100 ₹10,000 Lowest |
| 8.00 | Erection Testing and commissioning of Three phase CCMS panel petty material required for installation of ccms panel i.e clamp,nut and bolts,thimble ,wire etc complete in all material required for installation on PCC pole or Pedstal. complete in all material required for installation on PCC pole or Pedstal. | 6 | Each | 1,840 ₹11,040 | 2,000 ₹12,000 | 2,000 ₹12,000 | 1,000 ₹6,000 Lowest |
| 9.00 | Buy Back of old dismantalment flexible wire as per availbale at site. | 5,550 | Metre | 9 ₹-49,950 | 10 ₹-55,500 | 8 ₹-44,400 Lowest | 10 ₹-55,500 |
| 10.00 | Supply and erection of Sword type single Arm GI bracket with Big Ball on top and small Ball Complete in all respect including nut and bolts required for installation with suitable size of GI pole. . | 100 | Each | 2,585 ₹2,58,500 | 2,810 ₹2,81,000 | 2,790 ₹2,79,000 | 2,400 ₹2,40,000 Lowest |
Tender Value
₹1.4 Cr
EMD Value
₹2.7 L
Closing Date
19 Aug 2026, 12:00 pmClosed
SACHIN YADAV
Municipal Corporation Gurugram
Upgradation of street light pole,cable and S/E/T/C of Erection of street light fitting other contingent there in Vipul World under ward 16, Zone 1 under limit of Municipal Corporation Gurugram.
2026_HRY_538812_1
2026A0C818EC EAFA 412C 9FDF CA21888671AA285ULB
Open Tender
Civil Works
Works
120 days
Gurugram
Upgradation of street light pole,cable and S/E/T/C of Erection of street light fitting other contingent there in Vipul World under ward 16, Zone 1 under limit of Municipal Corporation Gurugram.
2 documents required · 2 mandatory
₹15,180
Yes
₹2.7 L
Yes
19 Oct 2026
5 Aug 2026
19 Aug 2026
5 Aug 2026
19 Aug 2026
5 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Upgradation of street light pole,cable and S/E/T/C of Erection of street light fitting other contingent there in Vipul World under ward 16, Zone 1 under limit of Municipal Corporation Gurugram | - | - | - | - |
| 3 | Supply and erection of 2.5 sqmm 3 core unard FRLS PVC insulated ISI Marked copper conductor cable complete as per entire satisfication of engineer in charge.Make RR / Havells / Polycab/Grandley. 2.5 Sq. mm 3 Core Cable. | 5,550 | Metre | - | - |
| 4 | Providing trench less boring below existing road / pavement including laying of 65 mm dia GI pipe B class required to complete the job in all respect | 650 | Metre | - | - |
| 5 | Providing trench less cuttting by Hydraulic Drilling Device boring/ Manual OR through some suitable alternate method with insertion of HDPE Pipe including supply, Delivery of HDPE pipe at work site and laying of 50mm internal diameter HDPE pipe inside road for road corssing of cable by Hydraulic Drilling Device without opening of the road top surface, laid at a depth of at least 900mm below the road surface from the feeding point to the feeder pillar box in median (OR) from feeder pillar to respective street light pole including cost of all accessories for road crossing for laying of cables.. | 4,500 | Metre | - | - |
| 6 | Buy Back Removing of Existing Pole / With bracket and Cable including exiting foundation dismantling with all labour and material required etc to complete the job in all respect up to the in entire satisfaction of Engineer-charge-of the work.... | 100 | Each | - | - |
| 7 | Dismantle and Erection of street light fitting on the pole including the cost of petty material required (irrespective of height/length of bracket) At Pole above 7 metres but up to the height of 9 metres. | 100 | Each | - | - |
| 8 | Erection Testing and commissioning of Three phase CCMS panel petty material required for installation of ccms panel i.e clamp,nut and bolts,thimble ,wire etc complete in all material required for installation on PCC pole or Pedstal. complete in all material required for installation on PCC pole or Pedstal. | 6 | Each | - | - |
| 9 | Buy Back of old dismantalment flexible wire as per availbale at site. | 5,550 | Metre | - | - |
| 10 | Supply and erection of Sword type single Arm GI bracket with Big Ball on top and small Ball Complete in all respect including nut and bolts required for installation with suitable size of GI pole. . | 100 | Each | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_618044.xls
BOQ • 0.27 MB
AD0173612.pdf
Additional Documents • 0.99 MB
OT0173612.pdf
Other Document • 0.99 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .