Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹3.0 L+₹5,826.55 (1.98%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹2.9 L
EMD Value
₹5,820
Closing Date
22 Aug 2026, 4:00 pmClosed
Er. Fayaz Ahmed Sheikh
Executive Engineer REW Ramban
As per NIT
2026_RDPR_320315_6
eNIT21.1 of REW Ramban under head (DDC/BDC/ABDP /APDP/SBM) Block Gundi Dharam n Gool 2026-27
Open Tender
Civil Works
Percentage
30 days
Ramban
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer REW Ramban
₹5,820
3 Sept 2026
10 Aug 2026
24 Aug 2026
10 Aug 2026
22 Aug 2026
10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed in all kinds of soils. | 1 | Cum | 479.3 | ₹478.82 |
| 2 | Providing and laying in position cement concrete etc of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | - | Cum | 4,826.5 | - |
| 3 | Providing/Laying in position cement concrete of specified grade in 1:3:6 mix (1cement:3sand:6stone agg) with 20mm nominal size aggregates including curing with 30% boulders | 1 | Cum | 5,733.6 | ₹5,727.87 |
| 4 | Providing and laying in position Dry stone soling in horizontal position including cost of stones | 1 | Cum | 815 | ₹814.19 |
| 5 | Brickwork with common burnt clay (nonn-modular) bricks in FPS bricks of class designation 75 in 1:6 (cement:sand) mix in foundation and plinth | - | Cum | 7,571.55 | - |
| 6 | Providing/Laying in position Reinforced cement concrete of specified grade in 1:1.5:3 mix (1cement:1.5sand:3stone agg) with 20mm nominal size aggregates including curing | - | Cum | 9,821.85 | - |
| 7 | Reinforcement for RCC work including cutting, bending, binding and placeing in position complete | - | Kgs | 123.2 | - |
| 0.9 | Centering and shuttering including strutting propping etc in foundation and footing complete | 1 | Sqm | 286.35 | ₹286.06 |
| 0.9 | Centering and shuttering including strutting propping etc in Suspended floors roofs, slabs complete | 1 | Sqm | 718.2 | ₹717.48 |
| 0.0 | Centering and shuttering including strutting propping etc in edges of slabs complete | - | Rmtr | 262.2 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.50 MB
BOQ_1064563.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .