| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.3 LAccepted-AOC | ₹18.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹20.0 LRejected-AOC | ₹20.0 L | L2 | Rejected-AOC L2 |
| 3 | Not Admitted-Fee/PreQual/Technical UNIT G 58 GROUND FLOOR THE SAPPHIRE SOHNA ROAD GURGAON GURGAON HARYANA 122018 UDYAM HR 05 0012114 | GURUGRAM | HARYANA | 122018 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | The Satrod cooperative labour and construction society limited L1 | THE SHUBHAM COOPERATIVE LABOUR AND CONSTRUCTION SOCIETY LTD L2 |
|---|---|---|---|---|---|
| 2.00NS Item | |||||
| 3.00 | RATE ANALYSIS OF HORTICULTURE WASTE COMPOSTER MACHINE INCLUDING ONE YEAR
MAINTENANCE FOR ONE TON PER DAY MODEL
Sr.
No.
Description Rate
(In Rs.)
A HORTICULTURE WASTE COMPOSTER MACHINE FOR MANURE CONVERSION INCLUDING
ONE YEAR MAINTENANCE WITH FOLLOWING SPECIFICATION :-
Providing and installing of indigenous complete unit for Manure Conversion having
weight (3MT, Internal MCB/ELCB controlled Electrical control with phase reversal, load
up to 16 KW with heat exhauster and upward steam emission, individual electric starters
with phase reversal control.
This machine consists of two parts. One is shredder and other part is Processor which
gives organic manure as per operating mode in which raw material is Green waste is put.
Provision of in-built liquid tank, manual input feed and manual externally midway
reprocessing between plant A and plant B for better feed control through independent
hopper.
Capacity: 1 Ton per day
Input: Horticulture
Output: Organic manure
Noise Level: Minimum to Nil
Electricals: 3 Phases,
Electrical Load Up to 16 KW running with full load
Emission: Only Steam
Motor Power: 20HP
1400000.00
B OPERATION AND MAINTENANCE OF UNIT FOR ONE TON PER DAY MODEL :-
One Supervisor for managing, operating and overlooking the complete project. 18000.00
One labour for the segregation and running the machines 16000.00
Machine maintenance, by product formation liquid and other consumables 15000.00
Total x 12 Months 588000.00
GST 18% 105840.00
Grand Total 693840.00
C CONSTRUCTION OF PLATFORM AND SHED
Construction of platform of size 15ft.
Shed size of 19 ft by 20 ft
390000.00
Total Project Cost Rs. 1400000.00 plus 693840.00 plus 390000.00 = 2483840.00 | 1 | Each | 18,29,000 ₹18.3 L | 19,99,989 ₹20.0 L |
Tender Value
₹24.8 L
EMD Value
₹49,676
Closing Date
9 Sept 2025, 12:00 pmClosed
PARVEEN KUMAR
Municipal Corporation Gurugram
Providing Horticulture Waste Composter Machine for Manure Conversion from Horticulture Waste including One Year operation and maintenance in Zone-1, MCG.
2025_HRY_469413_1
20258C72DA9A E7F4 45C5 A74B F049D6FAD046285ULB
Open Tender
Civil Works
430 days
Gurugram
2 documents required · 2 mandatory
₹1,000
₹49,676
Yes
5 Jan 2026
2 Sept 2025
9 Sept 2025
2 Sept 2025
9 Sept 2025
2 Sept 2025
Amount
NS Item
RATE ANALYSIS OF HORTICULTURE WASTE COMPOSTER MACHINE INCLUDING ONE YEAR MAINTENANCE FOR ONE TON PER DAY MODEL Sr. No. Description Rate (In Rs.) A HORTICULTURE WASTE COMPOSTER MACHINE FOR MANURE CONVERSION INCLUDING ONE YEAR MAINTENANCE WITH FOLLOWING SPECIFICATION :- Providing and installing of indigenous complete unit for Manure Conversion having weight (3MT, Internal MCB/ELCB controlled Electrical control with phase reversal, load up to 16 KW with heat exhauster and upward steam emission, individual electric starters with phase reversal control. This machine consists of two parts. One is shredder and other part is Processor which gives organic manure as per operating mode in which raw material is Green waste is put. Provision of in-built liquid tank, manual input feed and manual externally midway reprocessing between plant A and plant B for better feed control through independent hopper. Capacity: 1 Ton per day Input: Horticulture Output: Organic manure Noise Level: Minimum to Nil Electricals: 3 Phases, Electrical Load Up to 16 KW running with full load Emission: Only Steam Motor Power: 20HP 1400000.00 B OPERATION AND MAINTENANCE OF UNIT FOR ONE TON PER DAY MODEL :- One Supervisor for managing, operating and overlooking the complete project. 18000.00 One labour for the segregation and running the machines 16000.00 Machine maintenance, by product formation liquid and other consumables 15000.00 Total x 12 Months 588000.00 GST 18% 105840.00 Grand Total 693840.00 C CONSTRUCTION OF PLATFORM AND SHED Construction of platform of size 15ft. Shed size of 19 ft by 20 ft 390000.00 Total Project Cost Rs. 1400000.00 plus 693840.00 plus 390000.00 = 2483840.00
THE SHUBHAM COOPERATIVE LABOUR AND CONSTRUCTION SOCIETY LTD (BID ID -1332511)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid