| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.3 LAccepted-AOC | 1 | Accepted-AOC Accepted | |
| 2 | Rejected-Technical | - | Rejected-Technical Above for Estimate Rate |
Tender Value
₹7.5 L
EMD Value
₹7,550
Closing Date
26 Jun 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE OFFICER
BUS STAND ROAD KEERANUR KULATHUR TK PUDUKKOTTAI
15th Finance Commission Grant Tied UnTied Grant 2023 2024 2nd Instalment Improvement Of Senamuthi Burail Ground in Keeranur Town Panchayat
2024_DTP_456875_1
172/2024
Open Tender
Civil Works
Item Rate
90 days
KEERANUR TOWN PANCHAYAT
REFER TENDER DOCUMENT
1 document required · 1 mandatory
₹0
₹7,550
19 Dec 2024
22 Jun 2024
26 Jun 2024
22 Jun 2024
26 Jun 2024
22 Jun 2024
Amount
Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.SS 20 B
Plain Cement Concrete 1:4:8 Mix (one part cement, Four part sand and Eight part of aggrigate) using 40mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications.
Supplying fabricating and placing in position of steel rods using TMT. or Ribbed Tor Steel including cost of binding wire, cost of labour charges for fabrication and placing in position etc. Complete. Complying with std. specifications.
Supplying and erecting shuttering including Necessary supports for plain surfaces such asR.C.C. Columns for footings, plimn beam, Stair case, RCC. Critical pier etc., complete In all floor.
Above
Below
Reinforced Cement Concrete 1:1½:3 Mix (One Part of cement, one and half Part of M- Sand and three Part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications.(Using Vibrator) TNDSS NO: 30 V, VI (S3), VII-3.
Brick Work in Cement Mortor 1:5 Mix (one cement, five sand) using new best II Class Bricks of size 9 ” x 4 3/8 “x 2 3/4 ” from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications.
Plastering with cement mortar 1: 5 mix to 12mm thick including cost and conveyance of all materials to site including curing etc.,complete as per standard specification – 10m2
Plastering with cement mortar 1: 3 mix to 10mm thick including cost and conveyance of all materials to site including curing etc.,complete as per standard specification – 10m2
Painting the new walls two coats over one coat of priming with best Emulsion paint of approved colour and quality including preparation of surface and finishing neatly etc., complete complying with standard specification and as directed by the department officers etc., complete complying with standard specifications.
Collection supply and filling of Stone Dust filling approved quarry including cost and Conveyance of all materials to site and all labour charges for filling etc., Complete.and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Plain Cement Concrete 1: 2 :4 (One Cement two sand four aggregate) using 20 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers 30 V, VI (S5) VII & 13
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 250mm thick specification including premixing the materials with water at OMC in mechnanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH
Providing and laying of 63 mm thick high strength type conforming IS 15658-2006 of rubberized interlocking paver block in required sizes of minimum compressive strength of 40 N/mm2 in uniform shape of approved make to be laid in flurrying bone pattern with approved non sticking surface in the top and the rate including leveling the base preparation of sub base with stone dust cushion 100mm thick, laying out the pavement cut the pieces to fit the edge, vibrating the pavers, sweeping transporting, loading unloading and laying of paver block as per standard specification
N JAHABER SADHIK
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_543277.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .