| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-Finance | ₹1.5 Cr | L1 | Accepted-Finance Accept |
| 2 | L2₹1.5 CrAccepted-Finance | ₹1.5 Cr | L2 | Accepted-Finance Reject |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical EMD/Fee not received |
| Sl No | Description | Qty | Unit | KVR INFRATECH L2 | K B NANJUNDE GOWDA L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling of existing structures like culverts, Bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material and stacking the servicable material with all lifts and lead of 1000 m including all labour, usage charges of machinery etc.,All other incidental charges complete as per the direction of Engineer-In-Charge of the work. complete. | 31.5 | Cum | 694 ₹21,861 | 676 ₹21,294 |
| 2.00 | Earth work in excavation for foundation of structures as per drawing including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material including cost of all labour, material, usage charges of machinery, lead, lifts, loading, unloading transporting, etc.,All other incidental charges complete as per the direction of Engineer-In-Charge of the work. complete.
Ordinary soil
Mechanical Means using hydraulic excavator
Depth upto 3 m | 1,047.15 | Cum | 128 ₹1.3 L | 125 ₹1.3 L |
| 3.00 | Plain / Reinforced Cement Concrete M 15 in in open foundation complete as per Drawing and technical specifications including formwork, centering, compacting, cost of all labour, materials, usage charges of machinery, curing, lead, lifts, loading, unloading, transporting, stacking, finishing the exposed faces neatly etc., All other incidental charges complete as per the direction of Engineer-In-Charge of the work. complete with lead of concrete mix up to 1 Km(excluding cost of steel and fabrication charges) | 373.8 | Cum | 5,500 ₹20.6 L | 5,300 ₹19.8 L |
| 4.00 | Plain / Reinforced Cement Concrete in substructure complete as per Drawing and Technical specifications, including formwork, centering, vibrating , compacting, cost of all materials, usage charges of machinery, curing, lead, lift, loading, unloading, transportation, stacking, finishing the exposed faces etc.,All other incidental charges complete as per the direction of Engineer-In-Charge of the work. complete
PCC M20 using 20mm and downsize metal
Using Batching plant, transit mixer and concrete pump
p Height up to 5m | 1,342.31 | Cum | 6,444 ₹86.5 L | 6,250 ₹83.9 L |
| 5.00 | Supplying, fitting and placing uncoated TMT Fe 500 grade bar reinforcement in foundation complete as per drawing and technical specifications, including straightening bars, cutting, bending, hooking, binding with approved quality binding wire after placing in position, tying, lapping and or welding wherever required (laps, hooks and wastages shall not be measured and paid) including cost of all materials, fabrication charges, all labour, material, usage charges of machinery, lead, lifts, loading, unloading, stacking transporting etc.,All other incidental charges complete as per the direction of Engineer-In-Charge of the work. complete | 35.36 | MT | 99,784 ₹35.3 L | 96,000 ₹33.9 L |
| 6.00 | Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces, including cost of all materials, all labour, lead, lifts, loading, unloading, transporting etc.,All other incidental charges complete as per the direction of Engineer-In-Charge of the work. complete. | 7,072.5 | Sqm | 91 ₹6.4 L | 89 ₹6.3 L |
| 7.00 | Providing and erecting Project Display Board of size 1.80 verticalx 1.60M Horizontal made of Cold Rolled Coil Sheet 16 Guage (1.6mm thickness) sheeting strengthened by welding to MS angle of size 35x35x5mm iron framework on all sides, extra cross vertical angle fixed using nuts and bolts, base of the board shall be cleaned, applying red oxide and black paint by sprayer on both sides of the board and all MS iron frameworks, background of the facing side of the board painted in traffic yellow, project information written in English/Kannada/Hindi, painting letters and numerals in black, fixed on a mild steel angle iron post 75 mm x 75 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level and the board 2.8M from ground level as per approved drawing (Excluding cost of lettering)including cost of all materials all labour, lead, lifts, loading, unloading transporting etc.,All other incidental charges complete as per the direction of Engineer-In-Charge of the work. complete. | 2 | Each | 13,135 ₹26,270 | 12,000 ₹24,000 |
Tender Value
₹1.5 Cr
EMD Value
₹2.2 L
Closing Date
6 Mar 2026, 4:00 pmClosed
The Executive Engineer NH Division Hassan
Office of the EE NH Division Hassan
Construction of Guard Wall from Km 237.00 to Km 256.00 At Selected Locations of NH75 B.C Road Vellore section
2026_MoRTH_899010_1
EE/NHD/HSN/AE/SDMF/NIT4/25-26
Open Tender
Civil Works - Roads
90 days
Shiradi Ghat
As per Tender Document
7 documents required · 7 mandatory
₹5,900
As per NIT
₹2.2 L
7 May 2026
17 Feb 2026
7 Mar 2026
17 Feb 2026
6 Mar 2026
17 Feb 2026
17 Feb 2026 - 6 Mar 2026
Dismantling of existing structures like culverts, Bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material and stacking the servicable material with all lifts and lead of 1000 m including all labour, usage charges of machinery etc.,All other incidental charges complete as per the direction of Engineer-In-Charge of the work. complete.
Earth work in excavation for foundation of structures as per drawing including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material including cost of all labour, material, usage charges of machinery, lead, lifts, loading, unloading transporting, etc.,All other incidental charges complete as per the direction of Engineer-In-Charge of the work. complete. Ordinary soil Mechanical Means using hydraulic excavator Depth upto 3 m
Plain / Reinforced Cement Concrete M 15 in in open foundation complete as per Drawing and technical specifications including formwork, centering, compacting, cost of all labour, materials, usage charges of machinery, curing, lead, lifts, loading, unloading, transporting, stacking, finishing the exposed faces neatly etc., All other incidental charges complete as per the direction of Engineer-In-Charge of the work. complete with lead of concrete mix up to 1 Km(excluding cost of steel and fabrication charges)
Plain / Reinforced Cement Concrete in substructure complete as per Drawing and Technical specifications, including formwork, centering, vibrating , compacting, cost of all materials, usage charges of machinery, curing, lead, lift, loading, unloading, transportation, stacking, finishing the exposed faces etc.,All other incidental charges complete as per the direction of Engineer-In-Charge of the work. complete PCC M20 using 20mm and downsize metal Using Batching plant, transit mixer and concrete pump p Height up to 5m
Supplying, fitting and placing uncoated TMT Fe 500 grade bar reinforcement in foundation complete as per drawing and technical specifications, including straightening bars, cutting, bending, hooking, binding with approved quality binding wire after placing in position, tying, lapping and or welding wherever required (laps, hooks and wastages shall not be measured and paid) including cost of all materials, fabrication charges, all labour, material, usage charges of machinery, lead, lifts, loading, unloading, stacking transporting etc.,All other incidental charges complete as per the direction of Engineer-In-Charge of the work. complete
Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces, including cost of all materials, all labour, lead, lifts, loading, unloading, transporting etc.,All other incidental charges complete as per the direction of Engineer-In-Charge of the work. complete.
Providing and erecting Project Display Board of size 1.80 verticalx 1.60M Horizontal made of Cold Rolled Coil Sheet 16 Guage (1.6mm thickness) sheeting strengthened by welding to MS angle of size 35x35x5mm iron framework on all sides, extra cross vertical angle fixed using nuts and bolts, base of the board shall be cleaned, applying red oxide and black paint by sprayer on both sides of the board and all MS iron frameworks, background of the facing side of the board painted in traffic yellow, project information written in English/Kannada/Hindi, painting letters and numerals in black, fixed on a mild steel angle iron post 75 mm x 75 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level and the board 2.8M from ground level as per approved drawing (Excluding cost of lettering)including cost of all materials all labour, lead, lifts, loading, unloading transporting etc.,All other incidental charges complete as per the direction of Engineer-In-Charge of the work. complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
KW4.rar
Tender Documents • 0.53 MB
BOQ_944957.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid