Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Finance | -0.02% | ₹3.0 L | L1 | Admitted-Finance |
| 2 | L2₹3.0 L+₹59.99 (0.02%)Admitted-Finance | +0.00% | ₹3.0 L+₹59.99 (0.02%) | L2 | Admitted-Finance |
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
4 Sept 2026, 5:00 pmClosed
Er. fayaz Ahmed
Executive engineer REW Ramban
as per nit
2026_RDPR_322655_2
e-Nit 15.4 of REW Ramban(Banihal , RAMSOO )
Open Tender
Civil Works
Percentage
ramban
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive engineer REW Rambanayati Raj
₹6,000
Yes
17 Sept 2026
29 Aug 2026
5 Sept 2026
29 Aug 2026
4 Sept 2026
29 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches (not exceeding, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | - | cum | 592.9 | - |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 | - | cum | 4,826.5 | - |
| 3 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 1 | cum | 5,733.6 | ₹5,727.87 |
| 4 | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone (Nallah) | 1 | cum | 2,793.8 | ₹2,791.01 |
| 5 | Brickworkwith common burnt clay bricks of class designation 75 in cement moratr 1:6 (1 cement: 6 coarse sand) in foundation and plinth | - | cum | 7,571.55 | - |
| 6 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | - | cum | 1,455.65 | - |
| 7 | Providing and laying in position reinforced cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:1.5:3 | 1 | cum | 9,821.85 | ₹9,812.03 |
| 8 | Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6mm angle iron and 3mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer.
10.5.1 Using M.S. angles 40x40x6mm for diagonal braces | - | cum | 4,352.95 | - |
| 9 | Reinforcement for RCC work complete job | 1 | kg | 123.05 | ₹122.93 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for:fnd | - | sqm | 286.35 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.04 MB
BOQ_1083286.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .