Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 CrAccepted-AOC | ₹5.3 Cr | L1 | Accepted-AOC Due to lower rates |
| 2 | L2₹6.2 Cr+₹86.2 L (16.3%)Rejected-Finance | ₹6.2 Cr+₹86.2 L (16.3%) | L2 | Rejected-Finance Due to higher rates |
Tender Value
₹5.4 Cr
EMD Value
₹10.8 L
Closing Date
26 Nov 2020, 1:00 pmClosed
EEPH Divn No 8 Chd
EEPH Divn No 8 Chd
Design built and operation of 500 KLD ST Plant with tertiary treated water of 200 KLD capacity using SBR technology at CAP Complex Dhanas UT Chd inc op and comprehensive mtc of 10 years after 3 months trail run and 1 year defect liability period
2020_CHD_57064_1
PH8/2020/6956-65/71
Open Tender
Public Health Products
Item Rate
180 days
Chandigarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹10.8 L
14 Jan 2021
15 Oct 2020
26 Nov 2020
15 Oct 2020
26 Nov 2020
15 Oct 2020
Amount
Design Cost
Survey(s), Soil Investigation(s), Flow Measurements(s), Sampling & Analysis, etc.
Detailed Design Engineering
Documents comprising Technical, Drawings, Manuals, etc.
If any other equipment/component required for successful commissioning & effective running of Plant
WORKS COST
Civil work inclusive of RCC Tanks for ST Plant, Brick work for Plant Room and Boundary Wall (122 Mtr. Length 1.5 high & .23 cm thick), Paver Block on external and internal peripheral road/ walkway in STP Campus, MS Components for storage of Chlorinator, Filter Press, Air Blower, Ultra filteration, Horticulture, Land Scaping, lighting (external & internal), Hydrant System for irrigation, Main gate with grills (2' high) on Boundary wall (RCC Column & beams in Boundary wall) Toilets & drinking water arrangement for staff, office room, laboratory, including finishing work complete in all respect of ST plant campus.
Electrical inclusive of Counduits, Panel, PLC Based SCADA System, Wiring, Cables, Fittings, Fixtures, etc.
Mechanical inclusive of Pumps, Motors, Valves, Meters, Guages, Screens, DG Set, Blowers, Piping, Filters, Chlorinator, Grid networks, Other accessories, etc.
Operation and comprehensive Mtc. Charges for Ten years after the completion of trial run of 03 Months followed by defect liability period of 01 Year.
for 03 Months Trail run and 12 Months Defect Liability Period ( DLP) - NIL
for Operation & Comprehensive Mtc. Year-1
for Operation & Comprehensive Mtc. Year-2
for Operation & Comprehensive Mtc. Year-3
for Operation & Comprehensive Mtc. Year-4
for Operation & Comprehensive Mtc. Year-5
for Operation & Comprehensive Mtc. Year-6
for Operation & Comprehensive Mtc. Year-7
for Operation & Comprehensive Mtc. Year-8
for Operation & Comprehensive Mtc. Year-9
for Operation & Comprehensive Mtc. Year-10
Variable Part(This part covers the cost(s) of Chemicals, Testings, Oils and Greases & Consumable Items etc.
for 03 Months Trail run and 12 Months Defect Liability Period ( DLP) - NIL
for Operation & Comprehensive Mtc. Year-1
for Operation & Comprehensive Mtc. Year-2
for Operation & Comprehensive Mtc. Year-3
for Operation & Comprehensive Mtc. Year-4
for Operation & Comprehensive Mtc. Year-5
for Operation & Comprehensive Mtc. Year-6
for Operation & Comprehensive Mtc. Year-7
for Operation & Comprehensive Mtc. Year-8
for Operation & Comprehensive Mtc. Year-9
for Operation & Comprehensive Mtc. Year-10
ROHTASH KUMAR CONTRACTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .