Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance NO 302 1 MULLAI NAGAR SANKARANKOVIL 627 756 TENKASI | TENKASI | TAMIL NADU | 627756 | Admitted-Finance |
| 2 | Admitted-Finance 15A2 1 INTUC 5 SANKARANKOVIL ROAD RAJAPALAYAM TALUK VIRUDHUNAGAR DISTRICT 626 117 | VIRUDHUNAGAR | TAMIL NADU | 626117 | Admitted-Finance |
Tender Value
₹35.0 L
EMD Value
₹35,000
Closing Date
27 May 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director
DRDA,Tenkasi
Strengthening of Ayyaneri Othakadai Road km0/0 to 1/300 in Kuruvikulam Panchayat Union Panchayat Union in Tenkasi District, TNRRIS under20 Capital Grant Fund 2021-22 Pacakge No.04
2022_RDTN_231994_4
A5/1738/2022 Dt 6.05.2022 Tenkasi
Open Tender
Civil Works - Roads
Works
180 days
DRDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹35,000
DRDA,Tenkasi
9 Jun 2022
12 May 2022
27 May 2022
12 May 2022
27 May 2022
12 May 2022
18 May 2022
90 days
Amount
1.Strengthening to the Ayyaneri Othakadai Road km0/0 to 1/300 in Kuruvikulam Panchayat Union Panchayat Union in Tenkasi District
Clearing and Grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including and disposal of top Organic soil not exceeding 150mm in thickness as per Technical Specification Clause 201,(i) (A) - Scrub Jungle Clearance
Earthwork excavation for Road work in all Soils with Hydraulic excavator of 0.90 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with a lift upto 1.50m and lead upto 1000m as per Technical specification Clause 302.3
Picking the Exisiting Bituminous/Water Bound Macadam surface to a depth of 100mm by Mechanical means and addition of deficit aggregate @ 50% for Construction of Granular sub base by providing well graded material, spreading in uniform layers with standard bed camber on prepared surface, and compacting with Vibratory roller to achieve the desired density.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and applying Prime Coat with Bitumen Emulsion (SS-1) using Emulsion distributor at the rate of 0.70 kg per sqm on the prepared Granular surface (Wet Mix Moisture/ Wet Mix Macadam layer) treated with Primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. (ii)
Providing and applying Tack Coat with Bitumen Emulsion (RS-1) using Emulsion distributor at the rate of 0.25 kg per sqm on the prepared Granular surface (Water Bound Macadam Gr III layer/Wet Mix Macadam Layer) treated with Primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. (ii)
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and 0.09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete -Paver Finish
Provision for HM stone at each Furlong/Hectameter - 200m (regular intervals) as per standard dimensions and specifications mentioned in the departmental specifications etc., complete
Provision for KM stone at each Kilometer - 1000m (regular intervals) as per standard dimensions and specifications mentioned in the departmental specifications etc., complete
Retaining Wall @ Ch 850m
Earthwork excavation in all clauses of Soils and Subsoils except hard rock requiring blasting including Shoring, Strutting and dressing the excavation upto sill level to maintain the foundation width as per the specifications SS 20B etc., complete
Cement concrete 1:4:8 mix using 40mm ISS HBGS metal laid in layers not more than 15cm thick inculding cost and coveyance of all materials to site, labour charges for mixing ,laying,compacting and curing etc complete., For Foundation - Base Concrete
Supplying and erection Steel Centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab, Lintel, Beam, Column, Sunshade including cost and coveyance of all materials to site and all other incidental charges etc complete.,
Below Sill Level
Cement concrete 1:3:6 mix using 40mm ISS HBGS metal laid in layers not more than 15cm thick inculding cost and coveyance of all materials to site, labour charges for mixing ,laying,compacting and curing etc complete., Concrete Masonry - Abutment & Return wall.
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
PSR Constructions
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .