Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.7 CrAdmitted-Finance | ₹23.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹24.3 CrAdmitted-Finance | ₹24.3 Cr | L2 | Admitted-Finance |
| 3 | L3₹27.0 CrAdmitted-Finance AT MALANI COMPLEX 58 KOTECHA NAGAR KALAVAD ROAD RAJKOT 360001 GUJARAT INDIA | RAJKOT | GUJARAT | 360001 | ₹27.0 Cr | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Malani Construction Co L3 | Mdd Medical Systems (India) Pvt. Ltd. L1 | Vitrag Infra Projects LLP L2 |
|---|---|---|---|---|---|---|
| 1.00Items : | ||||||
| 1.01 | Medical Gas Pipe line System
Supply, Installation, Testing and Commissioning of Copper pipe shall be as per standard BS: EN 13348:2016/ ASTM B819 standards, Solid drawn, seamless, deoxidized, non-arsenical, half hard (hard can be accepted only for sizes 54mm or more), tempered and degreased copper pipe conforming to the standard. All copper pipes shall be degreased & delivered capped at both ends of required sizes compliant to the Technical Specifications. copper pipes size as mentioned below:
108mm OD X 1.5mm thick, As per tender technical specification | 50 | MTRS | 4,11,200 ₹4.1 L | 4,45,000 ₹4.5 L | 2,45,100 ₹2.5 L |
| 1.02 | Supply, Installation, Testing and Commissioning of Copper pipe shall be as per standard BS: EN 13348:2016/ ASTM B819 standards, Solid drawn, seamless, deoxidized, non-arsenical, half hard (hard can be accepted only for sizes 54mm or more), tempered and degreased copper pipe conforming to the standard. All copper pipes shall be degreased & delivered capped at both ends of required sizes compliant to the Technical Specifications. copper pipes size as mentioned below:
76mm OD X 1.5mm thick, As per tender technical specification | 100 | MTRS | 5,95,400 ₹6.0 L | 6,50,000 ₹6.5 L | 3,35,300 ₹3.4 L |
| 1.03 | Supply, Installation, Testing and Commissioning of Copper pipe shall be as per standard BS: EN 13348:2016/ ASTM B819 standards, Solid drawn, seamless, deoxidized, non-arsenical, half hard (hard can be accepted only for sizes 54mm or more), tempered and degreased copper pipe conforming to the standard. All copper pipes shall be degreased & delivered capped at both ends of required sizes compliant to the Technical Specifications. copper pipes size as mentioned below:
54 mm OD X 1.2mm thick,As per tender technical specification. | 275 | MTRS | 11,68,750 ₹11.7 L | 10,98,625 ₹11.0 L | 5,10,675 ₹5.1 L |
| 1.04 | Supply, Installation, Testing and Commissioning of Copper pipe shall be as per standard BS: EN 13348:2016/ ASTM B819 standards, Solid drawn, seamless, deoxidized, non-arsenical, half hard (hard can be accepted only for sizes 54mm or more), tempered and degreased copper pipe conforming to the standard. All copper pipes shall be degreased & delivered capped at both ends of required sizes compliant to the Technical Specifications. copper pipes size as mentioned below:
42 mm OD X 1.2mm thick,As per tender technical specification. | 850 | MTRS | 21,47,950 ₹21.5 L | 21,20,750 ₹21.2 L | 12,06,150 ₹12.1 L |
| 1.05 | Supply, Installation, Testing and Commissioning of Copper pipe shall be as per standard BS: EN 13348:2016/ ASTM B819 standards, Solid drawn, seamless, deoxidized, non-arsenical, half hard (hard can be accepted only for sizes 54mm or more), tempered and degreased copper pipe conforming to the standard. All copper pipes shall be degreased & delivered capped at both ends of required sizes compliant to the Technical Specifications. copper pipes size as mentioned below:
28 mm OD X 1 mm thick, As per tender technical specification. | 1,250 | MTRS | 20,22,500 ₹20.2 L | 13,75,000 ₹13.8 L | 9,77,500 ₹9.8 L |
| 1.06 | Supply, Installation, Testing and Commissioning of Copper pipe shall be as per standard BS: EN 13348:2016/ ASTM B819 standards, Solid drawn, seamless, deoxidized, non-arsenical, half hard (hard can be accepted only for sizes 54mm or more), tempered and degreased copper pipe conforming to the standard. All copper pipes shall be degreased & delivered capped at both ends of required sizes compliant to the Technical Specifications. copper pipes size as mentioned below:
22 mm OD X 1 mm thick, As per tender technical specification. | 2,750 | MTRS | 25,71,250 ₹25.7 L | 26,12,500 ₹26.1 L | 16,74,750 ₹16.7 L |
| 1.07 | Supply, Installation, Testing and Commissioning of Copper pipe shall be as per standard BS: EN 13348:2016/ ASTM B819 standards, Solid drawn, seamless, deoxidized, non-arsenical, half hard (hard can be accepted only for sizes 54mm or more), tempered and degreased copper pipe conforming to the standard. All copper pipes shall be degreased & delivered capped at both ends of required sizes compliant to the Technical Specifications. copper pipes size as mentioned below:
15 mm OD X 1 mm thick, As per technical specification. | 3,750 | MTRS | 22,12,500 ₹22.1 L | 27,93,750 ₹27.9 L | 15,18,750 ₹15.2 L |
| 1.08 | Supply, Installation, Testing and Commissioning of Copper pipe shall be as per standard BS: EN 13348:2016/ ASTM B819 standards, Solid drawn, seamless, deoxidized, non-arsenical, half hard (hard can be accepted only for sizes 54mm or more), tempered and degreased copper pipe conforming to the standard. All copper pipes shall be degreased & delivered capped at both ends of required sizes compliant to the Technical Specifications. copper pipes size as mentioned below:
12 mm OD X 1 mm thick, As per technical specification. | 1,450 | MTRS | 6,46,700 ₹6.5 L | 6,52,500 ₹6.5 L | 4,68,350 ₹4.7 L |
| 1.09 | Supply, Installation, Testing and Commissioning of Gas Outlets Points/Terminal Units
It should complies with HTM 02-01/NFPA 99C/DIN/EN/ISO-7396-1 standards. It should be US FDA / European CE Certified with 4 digit notified body number or American ETL/ American UL listed. Bidder must submit copy of UL Listed or ETL Listed Certificate or US FDA Certificate or notified body CE certificate as per medical devices regulations with four digit number on each item. Medical Oxygen, As per tender technical specification. | 555 | NOS | 27,97,200 ₹28.0 L | 27,75,000 ₹27.8 L | 11,10,000 ₹11.1 L |
Tender Value
₹29.3 Cr
EMD Value
₹39.3 L
Closing Date
16 Feb 2024, 2:00 pmClosed
The Exe.,Engg., PWD, WD-I, Daman.
The Multi Office Complex, PWD, 2nd Floor, Near Moti Daman Market, Moti Daman.
Medical Services (MGPS Services) for 300 Beds Hospital and Modular OT Services for Marwad Hospital, Daman.
2023_DAMAN_3253_1
Tender Notice No. 115/2023-24
Open Tender
Civil Works
365 days
Daman District.
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
The Exe.,Engg., PWD, WD-I, Daman.
₹39.3 L
The Exe.,Engg., PWD, WD-I, Daman.
4 Mar 2024
18 Dec 2023
16 Feb 2024
18 Dec 2023
16 Feb 2024
18 Dec 2023
2 Jan 2024
Items :
Medical Gas Pipe line System Supply, Installation, Testing and Commissioning of Copper pipe shall be as per standard BS: EN 13348:2016/ ASTM B819 standards, Solid drawn, seamless, deoxidized, non-arsenical, half hard (hard can be accepted only for sizes 54mm or more), tempered and degreased copper pipe conforming to the standard. All copper pipes shall be degreased & delivered capped at both ends of required sizes compliant to the Technical Specifications. copper pipes size as mentioned below: 108mm OD X 1.5mm thick, As per tender technical specification
Supply, Installation, Testing and Commissioning of Copper pipe shall be as per standard BS: EN 13348:2016/ ASTM B819 standards, Solid drawn, seamless, deoxidized, non-arsenical, half hard (hard can be accepted only for sizes 54mm or more), tempered and degreased copper pipe conforming to the standard. All copper pipes shall be degreased & delivered capped at both ends of required sizes compliant to the Technical Specifications. copper pipes size as mentioned below: 76mm OD X 1.5mm thick, As per tender technical specification
Supply, Installation, Testing and Commissioning of Copper pipe shall be as per standard BS: EN 13348:2016/ ASTM B819 standards, Solid drawn, seamless, deoxidized, non-arsenical, half hard (hard can be accepted only for sizes 54mm or more), tempered and degreased copper pipe conforming to the standard. All copper pipes shall be degreased & delivered capped at both ends of required sizes compliant to the Technical Specifications. copper pipes size as mentioned below: 54 mm OD X 1.2mm thick,As per tender technical specification.
Supply, Installation, Testing and Commissioning of Copper pipe shall be as per standard BS: EN 13348:2016/ ASTM B819 standards, Solid drawn, seamless, deoxidized, non-arsenical, half hard (hard can be accepted only for sizes 54mm or more), tempered and degreased copper pipe conforming to the standard. All copper pipes shall be degreased & delivered capped at both ends of required sizes compliant to the Technical Specifications. copper pipes size as mentioned below: 42 mm OD X 1.2mm thick,As per tender technical specification.
Supply, Installation, Testing and Commissioning of Copper pipe shall be as per standard BS: EN 13348:2016/ ASTM B819 standards, Solid drawn, seamless, deoxidized, non-arsenical, half hard (hard can be accepted only for sizes 54mm or more), tempered and degreased copper pipe conforming to the standard. All copper pipes shall be degreased & delivered capped at both ends of required sizes compliant to the Technical Specifications. copper pipes size as mentioned below: 28 mm OD X 1 mm thick, As per tender technical specification.
Supply, Installation, Testing and Commissioning of Copper pipe shall be as per standard BS: EN 13348:2016/ ASTM B819 standards, Solid drawn, seamless, deoxidized, non-arsenical, half hard (hard can be accepted only for sizes 54mm or more), tempered and degreased copper pipe conforming to the standard. All copper pipes shall be degreased & delivered capped at both ends of required sizes compliant to the Technical Specifications. copper pipes size as mentioned below: 22 mm OD X 1 mm thick, As per tender technical specification.
Supply, Installation, Testing and Commissioning of Copper pipe shall be as per standard BS: EN 13348:2016/ ASTM B819 standards, Solid drawn, seamless, deoxidized, non-arsenical, half hard (hard can be accepted only for sizes 54mm or more), tempered and degreased copper pipe conforming to the standard. All copper pipes shall be degreased & delivered capped at both ends of required sizes compliant to the Technical Specifications. copper pipes size as mentioned below: 15 mm OD X 1 mm thick, As per technical specification.
Supply, Installation, Testing and Commissioning of Copper pipe shall be as per standard BS: EN 13348:2016/ ASTM B819 standards, Solid drawn, seamless, deoxidized, non-arsenical, half hard (hard can be accepted only for sizes 54mm or more), tempered and degreased copper pipe conforming to the standard. All copper pipes shall be degreased & delivered capped at both ends of required sizes compliant to the Technical Specifications. copper pipes size as mentioned below: 12 mm OD X 1 mm thick, As per technical specification.
Supply, Installation, Testing and Commissioning of Gas Outlets Points/Terminal Units It should complies with HTM 02-01/NFPA 99C/DIN/EN/ISO-7396-1 standards. It should be US FDA / European CE Certified with 4 digit notified body number or American ETL/ American UL listed. Bidder must submit copy of UL Listed or ETL Listed Certificate or US FDA Certificate or notified body CE certificate as per medical devices regulations with four digit number on each item. Medical Oxygen, As per tender technical specification.
Nitrous Oxide as per (above Item. No.9 ) Specification & tender technical specification.
Medical Air 4 Bar as per (above Item. No.9 ) Specification & tender technical specification.
Surgical Air 7 Bar as per (above Item. No.9 ) Specification & tender technical specification.
Vacuum as per (above Item. No.9 ) Specification & tender technical specification.
AGSS as per (above Item. No.9 ) Specification & tender technical specification.
CO2 as per (above Item. No.9 ) Specification & tender technical specification.
Supply, Installation, Testing and Commissioning of matching Probe / Adaptor With one end suitable for Hose & other end suitable for terminal units as per technical specifications for Oxygen for Nitrous Oxide , for Compressed Air ( 4 Bar ), For Compressed Air (7 Bar) , For Vacuum, For AGSS/WAG .Fully complies to HTM 02-01/ NFPA 99 /EN/DIN/ISO 7396-1 It should be US FDA/ European CE with four digit notified body number American ETL/American UL Listed. Suitable for Oxygen, CO2, Nitrous Oxide, Compressed air 4 bar, compressed air 7 bar, DISS connection, vacuum. Medical Oxygen, As per technical specification.
Nitrous Oxide as per (above Item. No.16 ) Specification & tender technical specification.
Medical Air 4 Bar as per (above Item. No.16 ) Specification & tender technical specification.
Surgical Air 7 Bar as per (above Item. No.16 ) Specification & tender technical specification.
Vacuum as per (above Item. No.16 ) Specification & tender technical specification.
AGSS as per (above Item. No.16 ) Specification & tender technical specification.
CO2 as per (above Item. No.16 ) Specification & tender technical specification.
Supply, Installation, Testing and Commissioning of The Medical Gas Area Alarms + Area Valve Box should be digital and capable of monitoring up to 6/7 medical gas services by means of pressure sensors which detect deviations from the normal operating limits of either pressure or medical vacuum.. It Should Complies with HTM 02-01 / NFPA 99/EN/DIN/ ISO 7396-1 Standards. It should be US FDA/ European CE with four digit notified body number American ETL/American UL Listed.. 2 Gas (Oxygen Vacuum), As per tender technical specification.
3 gas ( Oxygen Vacuum , MA4) as per (above Item. No.23 ) Specification & technical specification.
4 gas ( Oxygen , Vacuum , MA4 , N20) as per (above Item. No.23 ) Specification & technical specification.
6 gas ( O2, VAC , MA4 , SA7 CO2, N20) as per (above Item. No.23 ) Specification & technical specification
Supply, Installation, Testing and Commissioning of Master Alarm panel 6 services (Oxygen, N2O, MA4 Air, SA7 Air, CO2 and Vacuum) It should be US FDA / European CE Certified with 4 digit notified body number or American ETL/ American UL listed. Complies with HTM 02-01 / NFPA 99C/EN/DIN/ ISO 7396-1 Standards. A test certificate shall be provided with each system detailing the results of the factory tests (EMC Test passed. Copy of certificate must be submitted). . As per Specification.
Supply, Installation, Testing and Commissioning of Fully Automatic Oxygen Control System 2000 LPM or more It should comply with HTM 02-01/NFPA 99C/DIN/EN/ISO-7396-1 standards. It should be US FDA / European CE Certified with 4 digit notified body number or American ETL/ American UL listed. A test certificate shall be provided with each system detailing the results of the factory tests (EMC Test passed. Copy of certificate must be submitted). As per technical Specification.
Supply, Installation, Testing and Commissioning of Oxygen Manifold (2x20) as per HTM 02-01/NFPA 99C/DIN/EN/ISO-7396-1 standards. It should be US FDA / European CE Certified with 4 digit notified body number or American ETL/ American UL listed. . As per Technical Specification.
Supply, Installation, Testing and Commissioning of Emergency Oxygen Supply System (2X10) as per HTM 02-01/ NFPA 99 /EN/DIN/ISO 7396-1 Standard and technical specifications. It should be US FDA/ European CE with four digit notified body number American ETL/American UL Listed.. As per Technical Specification.
Supply, Installation, Testing and Commissioning of Oxygen Flow meter with Humidifier Bottle as per HTM 02-01/ NFPA 99 /EN/DIN/ISO 7396-1 Standard, Fully complies to HTM02-01 BSEN 7396 shall, be CE marked as class IIb medical device 93/42/EEC. . The flow meters should be of 0-15lpm for oxygen and with inlet pressure 50-60psi. (4.5 bar). As per technical specification
Supply, Installation, Testing and Commissioning of Oxygen High Flow meter with Humidifier Bottle as per HTM 02-01/ NFPA 99 /EN/DIN/ISO 7396-1 Standard, Fully complies to HTM02-01 BSEN 7396 shall, be CE marked as class IIb medical device 93/42/EEC. The flow meters should be of 0-70lpm for oxygen and with inlet pressure 50-60psi. (4.5 bar). As per technical specification
Supply, Installation, Testing and Commissioning of Fully Automatic Manifold Control Panel for Nitrous Oxide 500 LPM or more as per HTM 02-01/ NFPA 99 /EN/DIN/ISO 7396-1 Standard. It should be US FDA/ European CE with four digit notified body number American ETL/American UL Listed.As per technical specification.
Supply, Installation, Testing and Commissioning of Nitrous Oxide Manifold (2x 6 ) as per HTM 02-01/ NFPA 99 /EN/DIN/ISO 7396-1 Standard and technical specifications.. It should be US FDA/ European CE with four digit notified body number American ETL/American UL Listed.Fully complies to HTM02-01 BSEN 7396 shall, be CE marked as class IIb medical device 93/42/EEC with four digit notified number specified.. As per technical Specification
Supply, Installation, Testing and Commissioning of Emergency Nitrous Oxide Supply System (2x 2) as per fully complies HTM 02-01/ NFPA 99 /EN/DIN/ISO 7396-1 Standard and technical specifications. It should be US FDA/ European CE with four digit notified body number American ETL/American UL Listed. As per technical Specification.
Supply, Installation, Testing and Commissioning of Fully Automatic Manifold Control Panel for CO2 500 LPM as per HTM 02-01/ NFPA 99 /EN/DIN/ISO 7396-1 Standard. It should be US FDA/ European CE with four digit notified body number American ETL/American UL Listed. A test certificate shall be provided with each system detailing the results of the factory tests (EMC Test passed, Adiabatic test passed. As per technical specification.
Supply, Installation, Testing and Commissioning of CO2 Manifold (2x 6) as per Fully complies to HTM 02-01/ NFPA 99 /EN/DIN/ISO 7396-1 Standard and technical specifications. . It should be US FDA/ European CE with four digit notified body number American ETL/American UL Listed. As per technical Specification
Supply, Installation, Testing and Commissioning of Emergency CO2 Supply System (2 x 2 ) as per fully complies HTM 02-01/ NFPA 99 /EN/DIN/ISO 7396-1 Standard and technical specifications. It should be US FDA/ European CE with four digit notified body number American ETL/American UL Listed. As per technical Specification
MEDICAL VACUUM SYSTEMS (Package unit) Supply, Installation, Testing and Commissioning of Central Medical Vacuum Plant of output of capacity minimum 7500 LPM as working and 7500 LPM as standby or Total design for minimum 15000 LPM as per relevant standard comprising of vacuum pumps, vacuum receiver, bacterial filters, pressure switches, system controls etc complete as per Technical Specifications.
MEDICAL AND SURGICAL AIR SYSTEM (PACKAGE UNIT) Supply, Installation, Testing and Commissioning of Central Medical Air Plant having a minimum capacity of 6000 LPM as working and 3000 LPM as standby or Total design for minimum capacity of 9000 LPM as per relevant standard comprising of compressed Medical Air system with air compressor, Air receiver tank, filtration , Dryer system, pressure switches, system controls etc complete as per Technical Specifications.
Supply, Installation, Testing and Commissioning of Vacuum Unit as perHTM 02-01/ NFPA 99 /EN/DIN/ISO Standard and technical specifications. It should be US FDA / European CE Certified with 4 digit notified body number or American ETL/ American UL listedTIt should be continuous vacuum regulator, compact, strong and ergonomic device. It should have manual adjustment of the vacuum gauge from -45degree to +45degree for a better visibility. Vacuum gauge should be protected by a plastic housing. It should have on/off switch-button providing a quick restoration of the pre-adjusted vacuum level. It should have central regulation knob with a free rotation at the end of the course (impossible blocking). It should have quick adjustment :2.5turns are enough to reach the maximum vacuum level. It should have vacuum levels :0-1000m/bar. The vacuum regulator should be 3-in-1 system. It should have a device with a metal outlet tubing nipple integrated in the body of the regulator for a better safety, emergency suctions can even be processed. It should be supplied with a 100ml safety jar equipped with a mechanical anti-over flow safety valve and single use antibacterial plastic filter upfront. The safety jar should be made of polycarbonate, autoclavable up to 134degree C and unbreakable. The safety jar should be fixed by an easy-click rotation. The safety jar should be able to rotate to avoid any pinch of the tubing. It should have a unit serial number laser engraved on the body of each vacuum regulator ensuring its identifications and traceability. And One Polysulphone collection jar of 1000ml with lid : It should be unbreakable and autoclavable upto 134º C must be fitted with an extremely simple anti overflow safety device, thereby ensuring easy maintenance. Should be totally transparent, they ensure perfect sucked liquid visibility. As per technical specification
Supply, Installation, Testing and Commissioning of Theatre Suction Unit as per Fully complies to HTM 02-01/ NFPA 99 /EN/DIN/ISO Standard and technical specifications. It should be US FDA / European CE Certified with 4 digit notified body number or American ETL/ American UL listed. shall, be CE marked as class IIb medical device 93/42/EE CE with four digit notified number specified It should be continuous vacuum regulator, compact, strong and ergonomic device. It should have manual adjustment of the vacuum gauge from -45degree to +45degree for a better visibility. Vacuum gauge should be protected by a plastic housing. It should have on/off switch-button providing a quick restoration of the pre-adjusted vacuum level. It should have central regulation knob with a free rotation at the end of the course (impossible blocking). It should have quick adjustment :2.5turns are enough to reach the maximum vacuum level. It should have vacuum levels :0-1000m/bar. The vacuum regulator should be 3-in-1 system. It should have a device with a metal outlet tubing nipple integrated in the body of the regulator for a better safety, emergency suctions can even be processed. It should be supplied with a 100ml safety jar equipped with a mechanical anti-over flow safety valve and single use antibacterial plastic filter upfront. The safety jar should be made of polycarbonate, autoclavable up to 134degree C and unbreakable. The safety jar should be fixed by an easy-click rotation. The safety jar should be able to rotate to avoid any pinch of the tubing. It should have a unit serial number laser engraved on the body of each vacuum regulator ensuring its identifications and traceability. And Two Polysulphone collection jar of 2000ml with lid : It should be unbreakable and autoclavable upto 134º C must be fitted with an extremely simple anti overflow safety device, thereby ensuring easy maintenance. Should be totally transparent, they ensure perfect sucked liquid visibility. As per technical specification
Supply, Installation, Testing and Commissioning of Duplex AGSS System 1500 lpm working and 1500 lpm as stand by of 50Hz as per Fully complies to HTM 02-01/ NFPA 99 /EN/DIN/ISO 7396-1 Standard and technical specifications. . It should be US FDA/ European CE with four digit notified body number American ETL/America UL Listed. The plant shall be a duplex configuration such that the vacuum supply is maintained in single fault condition. The stated volumetric flow rate shall be delivered with one blower on standby. The entire AGS Plant shall be skid mounted, fully assembled and factory tested as a complete system. Regenerative Blowers : Two equally sized regenerative blowers shall be provided. Blowers shall be oil-less, air cooled side channel regenerative type, suitable for both continuous operation and frequent start/stop. The motor shall be directly coupled to a fully enclosed impeller with contact free operation. As per technical specification
SITC of AGSS remote indicator as per Fully complies to HTM 02-01/ NFPA 99 /EN/DIN/ISO 7396-1 Standard and technical specifications . It should be US FDA/ European CE with four digit notified body number American ETL/America UL Listed. It should be 24 volt on/off room controller indicating ‘red’ plant failed, ‘amber’ duty pump failed and ‘green’ mains airflow on. As per technical specification
Supply, Installation, Testing and Commissioning of AGSS reservoir as per Fully complies HTM 02-01/ NFPA 99 C/EN/DIN/ ISO 7396-1 Standard. The AGSS Receiver is the practical solution for waste anaesthetic gas discharges and is designed as an integral part of any waste anaesthetic gas system. The receiver comes complete with a transfer system, outlet hose assembly, and user instructions, making it ready for immediate use. Transfer system- connects to the patient circuit or anaesthetic machine and comprises a 1.5 metre length of 30 mm clear disposable tube with a male 30 mm taper for connection to the side of the receiver, and a 30 mm female tapered breathing circuit connector. It should have air break which prevents suction from the disposal system being transferred to the patient -flow indicator. Under normal operating conditions the indicator should be visible. -gauze filter built into the top of the vessel to prevent gown fluff and other solid material from reaching and blocking the fixed extraction system. Receiver vessel for active anaesthetic gas scavenging systems body - anodised aluminium, powder coated Collar and Cap - anodised aluminium Indicator Window - clear acrylic Indicator Float - low density polyethylene. It should have flow indicator
Supply, Installation, Testing and Commissioning of AGSS Hose Assembly as per It should complies with HTM 02-01/ NFPA 99 C/EN/DIN/ ISO 7396-1 Standard. It conducts the waste gases to the fixed system outlet point and comprises a 4 metre length of reinforced clear tube (colour coded yellow and blue as per the standard). This is fixed to the top of the vessel allowing the tube unimpaired 360o motion to reduce strain on the unit, and tube occlusion. As per technical specification
Supply, Installation, Testing and Commissioning Medical gas hose assemblies as per Fully complies HTM 02-01/ NFPA 99 C/EN/DIN/ ISO 7396-1 Standard. and technical specifications. Medical gas hose assemblies shall comply with BS EN ISO 5359, BSEN 5682. BS EN 7396-2, BS EN 9170-1 NIST fittings compliant to BSEN ISO 18082PVC hoses and hoses containing phthalates are not acceptable. Hoses shall be colour coded throughout their length as specified in BS EN 5359 as follows: Medical oxygen - white Nitrous oxide – blue Medical and surgical air - black Vacuum - yellow, antistatic rubber tube All hoses shall incorporate an anti-static inner core. Hose shall be permanently secured to all fittings with stainless steel crimped ferrules, and shall incorporate a window to enable verification that the hose is fully secured onto the hose barb. Low pressure hose assemblies shall be in accordance with DINISO 5359 for coupling into outlet Colour coding must be in accordance with ISO 32. Angle type plug and NIST fittings must be in accordance with DIN 13260-2 and DIN EN 15908 respectively Hose assembly shall consist of a UL-listed high-pressure color-coded conductive hose with a DISS nut and gland on the upper end. Provide a DISS Hand-I-Twist check unit on the lower end for all services except AGSS/WAGD. Provide a Diamond quick-connect on the lower end for the Waste Anaesthesia Gas Disposal service
Supply, Installation, Testing and Commissioning of Bed Head Wall Panel 1200 mm as per fully complies HTM 02-01/ NFPA 99 /EN/DIN/ISO 7396-1 Standard and technical specifications. It should be US FDA/ European CE with four digit notified body number American ETL/America UL Listed. . Bidder must submit copy of UL Listed or ETL Listed Certificate or US FDA Certificate or notified body CE certificate as per medical devices regulations with four digit number on each item. It should be made up of Aluminium extrusion profiles with aluminium alloy 6063 temper T6. It should be manufactured from Virgin Aluminium’ no scrap added in aluminium). All sections are anodized aluminium except top plate. The top plate will be aluminium powder coating (high quality). It should have 4 Channel Channel-1 “ Separate row /separate channel” for gas outlet points with pre piping side entry (Pre Piped with 4nos. gas outlet points factory tested) Channel-2 “ Separate row /separate channel” for electrical sockets with pre wiring (*Pre wired with 6nos. electrical sockets factory tested) Channel-3 “ Separate row /separate channel” for data sockets and nurse call switch ( low voltage) Channel-4 “ Separate row /separate channel” for built in LED Light Built in high strength anodized aluminium rail of full length without any joint As per technical specification
Supply, Installation, Testing and Commissioning of Bed Head Wall Panel 1500 mm as per fully complies HTM 02-01/ NFPA 99 /EN/DIN/ISO 7396-1 Standard and technical specifications. It should be US FDA/ European CE with four digit notified body number American ETL/America UL Listed. . Bidder must submit copy of UL Listed or ETL Listed Certificate or US FDA Certificate or notified body CE certificate as per medical devices regulations with four digit number on each item. It should be made up of Aluminium extrusion profiles with aluminium alloy 6063 temper T6. It should be manufactured from Virgin Aluminium’ no scrap added in aluminium). All sections are anodized aluminium except top plate. The top plate will be aluminium powder coating (high quality). It should have 4 Channel Channel-1 “ Separate row /separate channel” for gas outlet points with pre piping side entry (Pre Piped with 4nos. gas outlet points factory tested) Channel-2 “ Separate row /separate channel” for electrical sockets with pre wiring (*Pre wired with 6nos. electrical sockets factory tested) Channel-3 “ Separate row /separate channel” for data sockets and nurse call switch ( low voltage) Channel-4 “ Separate row /separate channel” for built in LED Light Built in high strength anodized aluminium rail of full length without any joint As per technical specification
Supply, Installation, Testing and Commissioning Loanable Line Valves as per HTM 02-01/ NFPA 99 /EN/DIN/ISO 7396-1 Standard and technical specifications. It should be US FDA/ European CE with four digit notified body number American ETL/America UL Listed.. Degreased Medical Lockable Ball Valve with Pipe line assembly. Ball valves should be Lockable and ball-type. Pre Piped Degreased Ball Valve with pipe extension. It should be full-port design. It should be blow-out proof stem. It should be lockable valve. The Valve shall be ball-type design with a bronze body and chrome plated brass ball for sizes 1/2” to 4”. Seats shall be Teflon (TFE) and seals Viton. A blow-out proof stem shall be used and the valve shall have a maximum pressure rating of 600 psi [4,137 kPa]. Valves shall be operated by a lever-type handle requiring only a quarter turn from a fully open position to a fully closed position. Each valve assembly shall be washed and degreased for medical gas service. The valve shall be supplied in a sealed plastic bag to prevent contamination prior to installation. Complete Valve should be individually packed. 12mm As per technical specification.
15 mm as per (above Item. No.50 ) Specification & technical specification.
22 mm as per (above Item. No.50 )Specification & technical specification.
28 mm as per (above Item. No.50 ) Specification & technical specification.
42 mm as per (above Item. No.50 ) Specification & technical specification.
54 mm as per (above Item. No.50 ) Specification & technical specification.
54 mm as per (above Item. No.50 ) Specification & technical specification.
76 mm as per (above Item. No.50 ) Specification & technical specification
Supply, Installation, Testing and Commissioning of Liquid Medical Oxygen System, 13KL LOM Oxygen Cryogenic Tank, Vaporiser and PRV System with one time LMO license from PESO, fees for first 5 years. As per technical specification.
Modular Operation Theater SITC of Wall Panel - As per Technical Specifications of the Tender
SITC of Ceiling panel - Hermentic Suspended Ceiling - As per Technical Specifications of the Tender
SITC of Laminar air flow ceiling - 1no. for each OT (inside OT work only): As per Technical Specifications of the Tender
Hermetically Sealed Sliding Door - As per Technical Specifications of the Tender
Hermetically Sealed Sliding Door with Lead Lining - As per Technical Specifications of the Tender(Ground and 2nd Floor -1 each)
SITC of Stainless Steel Storage Unit: As per Technical Specifications of the Tender
SITC of 2mm Flooring: As per Technical Specifications of the Tender
SITC of Dimmeble Peripheral light cum clean room luminaries: As per Technical Specifications of the Tender
SITC of Touch Surgeon Control Panel: As per Technical Specifications of the Tender
SITC of Medical Isolation Panel: As per Technical Specifications of the Tender
SITC of LED X-Ray View Panel: As per Technical Specifications of the Tender
SITC of Writing Board: As per Technical Specifications of the Tender
SITC of Inside OT electrical wiring and PVC conduting: As per Technical Specifications of the Tender
SITC of Stainless Steel Grill for Return and Supply inside each OT. - As per Technical Specifications of the Tender
SITC of Three Bay Stainless Steel Scrub Sink: As per Technical Specifications of the Tender.
SITC of Double Dome OT Light (Camera Prepared) with axis of 3rd Monitor Arm ceiling mounted with ceiling flange : Europeon Claass-1 or UL Listed or ETL Listed or USFDA Certified - As per Technical Specifications of the Tender
SITC of Centrally Mounted Camera: - As per Technical Specifications of the Tender
SITC of Medical Monitor with Monitor Arm: - As per Technical Specifications of the Tender
SITC of Recording System with 32"Monitor: As per Technical Specifications of the Tender
SITC of Imported Digital Display PACS/HIMS Medical Grade Monitor 54” Monitor: As per Technical Specifications of the Tender
SITC of Double Arm Motorised Surgeon Pendant - As per Technical Specifications of the Tender
SITC of Double Arm Motorised Anesthetist Pendant - As per Technical Specifications of the Tender
High End OT Table for Ortho OT- As per Technical Specifications of the Tender (2nd Floor)
High End Surgery OT Table- As per Technical Specifications of the Tender (Ground Floor - 2 , 2nd Floor- 1 )
High End Gyanec OT Table- As per Technical Specifications of the Tender (Ground Floor - 1 , 2nd Floor- 1 )
Ophthalmic OT Table (Remote Operated)- As per Technical Specifications of the Tender (2nd Floor)
AHU for each OT
Condensing Unit for each OT
Outside OT sterile coordior AHU unit
Control cabling from AHU to MOT control panel and associated sensors
Online UPS for each OT and 1 Standby UPS
Electrical Distribution Board with 12 MCB
Electrical Distribution Board with 16 MCB
Aluminum ducting with nitraile insulation
Electric Control panel
Medical Gas Pipe Line Interconnection
TVX and Dryer Filter
Copper Piping With insulation.Copper Refrigerant Piping with nitrile insulation class O
Electric & Control wiring. Control and transmission wiring between indoor and outdoor units
Micro-processor based humidity sensor & Display Panel
Micro-processor based Room temperature sensor & Display Panel
HEPA Filter Status Sensor & Display Panel
Vitrag Infra Projects LLP
Malani Construction Co
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.59 MB
BOQ_3376.xls
BOQ • 5.29 MB
Download all tender documents and submit your bid