| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 CrAccepted-AOC | ₹3.9 Cr | L1 | Accepted-AOC Lowest Bid |
| 2 | L2₹3.9 Cr+₹14,161.79 (0.04%)Rejected-Finance | ₹3.9 Cr+₹14,161.79 (0.04%) | L2 | Rejected-Finance Higher Bid |
| Sl No | Description | Qty | Unit | M/s Asum Engineering L2 | M/s CNN Enterprises L1 |
|---|---|---|---|---|---|
| 1.00 | ACADEMIC BLOCK
GROUND FLOOR
Civil Works
Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m. | 840.7 | cum | 565 ₹4,74,995.5 | 556 ₹4,67,429.2 Lowest |
| 2.00 | Providing and laying in foundations and plinth cement concrete 1:4:8(1 cement : 4 coarse sand : 8 graded stone aggregate 20mm nominal size) excluding the cost of centering and shuttering.
a) Foundation and plinth | 123.7 | cum | 10,053 ₹12,43,556.1 Lowest | 10,053 ₹12,43,556.1 Lowest |
| 3.00 | Providing and laying in foundations and plinth cement concrete 1:3:6(1 cement : 3 coarse sand :68 graded stone aggregate 20mm nominal size) excluding the cost of centering and shuttering.
b) For walls | 66.4 | cum | 11,077 ₹7,35,512.8 Lowest | 11,077 ₹7,35,512.8 Lowest |
| 4.00 | Reinforcement of RCC work including bending, binding and placing in position complete.
b) Cold twisted bars. | 25,941.99 | Kg. | 170 ₹44,10,138.3 Lowest | 170 ₹44,10,138.3 Lowest |
| 5.00 | Centring and shuttering including strutting, propping etc and removal of form work for :
a) Foundation, footings, bases of columns etc. and mass concrete. | 195.6 | Sqm | 509 ₹99,560.4 Lowest | 509 ₹99,560.4 Lowest |
| 6.00 | b) Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 230.9 | Sqm | 737 ₹1,70,173.3 Lowest | 737 ₹1,70,173.3 Lowest |
| 7.00 | c) Column, pillars, posts and struts etc. | 322.1 | Sqm | 898 ₹2,89,245.8 Lowest | 898 ₹2,89,245.8 Lowest |
| 8.00 | d) Lintels, beams, girders, bressumers and cantilevers etc. | 477.12 | Sqm | 670 ₹3,19,670.4 Lowest | 670 ₹3,19,670.4 Lowest |
| 9.00 | e) Stairs (excluding landings) except spiral stair cases. | 54.38 | Sqm | 1,743 ₹94,791.31 Lowest | 1,743 ₹94,791.31 Lowest |
| 10.00 | f) Suspended floors, roofs, landings shelves and their supports, balconies and chajjas (3.5 m height). | 469.34 | Sqm | 1,169 ₹5,48,658.46 Lowest | 1,169 ₹5,48,658.46 Lowest |
Tender Value
₹3.9 Cr
EMD Value
₹4.0 L
Closing Date
20 Mar 2026, 11:00 amClosed
Executive Engineer, Yingkiong PWD Division
O/o the Executive Engineer, Yingkiong PWD Division
Construction of Academic Block Assembly Shed Toilet Block and Kitchen Shed at GTSS Yingkiong
2026_PWDAP_3097_1
YA/NIT/EDN/2025-26/02
Open Tender
Civil Works - Building
Item Rate
730 days
Yingkiong
Please refer to Tender documents
2 documents required · 2 mandatory
₹3,000
EE PWD Yingkiong
₹4.0 L
Yes
17 Aug 2026
14 Mar 2026
20 Mar 2026
14 Mar 2026
20 Mar 2026
14 Mar 2026
14 Mar 2026 - 20 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | ACADEMIC BLOCK
GROUND FLOOR
Civil Works
Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m. | 840.7 | cum | - | - |
| 2 | Providing and laying in foundations and plinth cement concrete 1:4:8(1 cement : 4 coarse sand : 8 graded stone aggregate 20mm nominal size) excluding the cost of centering and shuttering.
a) Foundation and plinth | 123.7 | cum | - | - |
| 3 | Providing and laying in foundations and plinth cement concrete 1:3:6(1 cement : 3 coarse sand :68 graded stone aggregate 20mm nominal size) excluding the cost of centering and shuttering.
b) For walls | 66.4 | cum | - | - |
| 4 | Reinforcement of RCC work including bending, binding and placing in position complete.
b) Cold twisted bars. | 25,941.99 | Kg. | - | - |
| 5 | Centring and shuttering including strutting, propping etc and removal of form work for :
a) Foundation, footings, bases of columns etc. and mass concrete. | 195.6 | Sqm | - | - |
| 6 | b) Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 230.9 | Sqm | - | - |
| 7 | c) Column, pillars, posts and struts etc. | 322.1 | Sqm | - | - |
| 8 | d) Lintels, beams, girders, bressumers and cantilevers etc. | 477.12 | Sqm | - | - |
| 9 | e) Stairs (excluding landings) except spiral stair cases. | - | Sqm | - | - |
| 10 | f) Suspended floors, roofs, landings shelves and their supports, balconies and chajjas (3.5 m height). | 469.34 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_3297.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
BOQ_3297.xls
BOQ • 0.97 MB
FinaleNIT.pdf
Tender Documents • 3.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .