Tender Value
₹9.8 L
EMD Value
₹9,850
Closing Date
8 Dec 2022, 3:00 pmClosed
Block Development Officer(BP)
Panchayat Union Office, Bodinayakkanur
Providing BT Road from Kundalnayakkanpatty Main Road to Mullai Periyar River at Kundalnayakkanpatty Village of Uppukottai Panchayat at Bodinayakkanur
2022_RDTN_269292_1
3751/2020/A6 Date 30.12.2022
Open Tender
Civil Works - Roads
Item Rate
90 days
Bodinayakkanur
As per Tender Document
3 documents required · 3 mandatory
₹0
₹9,850
10 Mar 2023
1 Dec 2022
9 Dec 2022
1 Dec 2022
8 Dec 2022
1 Dec 2022
Amount
Clearing Scrub Jungle with uprooting including all cutting charges and depositing of the products and clearing as directed by the departmental officers including all labour charges etc., complete.
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER
Applying tack coat over the WBM. surface using Emulsion Bitumen of 4.00 kgs/10 sqm including cost of buituminous emnulsion which will be supplied departmentally at sectiojn stores cost of which will be recovered herewith including conveyance of bitumen emulsion to actual workspot handling charges for brushing cleaning and including labour chartes for preparing the surface for laying tackcoat and labour for applying the requikred quantity of bitumen emulsion using towed or self propelled bitumen pressure sprayer charges for rools and plants employed for the working including all other incidental charges such as barricading and providing danger light flags, etc., complete as per standard specification No. 503 of MOST - 10 sqm
Providing and laying Premix carpet with seal coat type A for 20MM thickness using 0.18 cum of 13.20mm IRC Machine crushed metal and 0.09 cum of 11.20mm IRC Machine crushed metal with 14.60 kgs of bitumen for premixing 10 sqm of premix carpet and 0.09 cum of 6.70MM IRC Machine crusher metal with 9.80 kgs of bitumen for seal coat type A per 10 sqm including cost and conveyance of materials to the work site and stacking them to the department metric gauge for premeasurement heating the bitumen in bitumen boiler heating the aggregates and mixing them with bitumen in minihot jkix plant for premix roller for rolling to mix for premix carpet and seal coat separately including labour charges in for spreading the mix for premix carpet including labour charges for spreading seal coat separately over premix carpets etc. including hire charges and fuel charges for mim hot mix plant, bitumnen boiler, power roller and all other tools and plant plants employed etc. complete as per clause 509 of MOST specification.
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compacti
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
C. Baluchamy
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .