Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.0 LAccepted-Finance | ₹5.0 L | 1 | Accepted-Finance Being L1 |
| 2 | 2₹5.1 L+₹15,294.12 (3.07%)Accepted-Finance | ₹5.1 L+₹15,294.12 (3.07%) | 2 | Accepted-Finance Being L2 |
| 3 | 3₹5.4 L+₹40,056.03 (8.05%)Accepted-Finance | ₹5.4 L+₹40,056.03 (8.05%) | 3 | Accepted-Finance Being L3 |
| 4 | 4₹5.4 L+₹41,512.61 (8.35%)Accepted-Finance | ₹5.4 L+₹41,512.61 (8.35%) | 4 | Accepted-Finance Being L4 |
| 5 | 5₹5.8 L+₹85,938.38 (17.3%)Accepted-Finance | ₹5.8 L+₹85,938.38 (17.3%) | 5 | Accepted-Finance Being L5 |
Tender Value
₹7.3 L
EMD Value
₹14,566
Closing Date
17 Mar 2026, 12:00 pmClosed
Executive Engineer
Executive Engineer, CD-I, APWD, Rangat
AR and MO rural road under SD-V, CD-I, APWD, Rangat. SW - Extension of existing road side drain with cover slab near STS workshop, Rangat Bay.
2026_APWD_22229_1
97/DB/CD-I/RGT/2025-26
Open Tender
Civil Works - Others
Percentage
60 days
Rangat Bay
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹14,566
30 Mar 2026
9 Mar 2026
17 Mar 2026
9 Mar 2026
17 Mar 2026
9 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | |||||
| 1.1 | All kinds of soil. | 50 | cum | 334.7 | ₹16,735 |
| 2Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 2.1 | 1:4:8 (1 Cement : 4 coarse sand (zone-Ill) derived from natural sources: 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 6.5 | cum | 10,231.3 | ₹66,503.45 |
| 2.2 | 1:3:6 (1 Cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 16 | cum | 11,487.3 | ₹1,83,796.8 |
| 3Centering and shuttering including strutting, propping etc. and removal of form work for: | |||||
| 3.1 | Foundations, footings, bases for columns | 18 | sqm | 405.1 | ₹7,291.8 |
| 3.2 | Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 41 | sqm | 826.5 | ₹33,886.5 |
| 4Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. | |||||
| 4.1 | 40 mm thick with 20 mm nominal size stone aggregate | 27 | sqm | 820.1 | ₹22,142.7 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.54 MB
TenderDocument.pdf
Tender Documents • 12.19 MB
BOQ_23534.xls
BOQ • 0.25 MB
Corrigendum999.pdf
PDF • 7.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .