Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
₹60.9 L
EMD Value
₹61,000
Closing Date
2 Sept 2024, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer, EDC, Hapur
Superintending Engineer, EDC, Hapur
Various work regarding Fuse set, Tailless unit etc in area of EDD-Garh in Business Plan 2024-25
2024_PVVNL_924098_2
130(W)/EDCH/2023-24
Open Tender
Electrical Works
Lump-sum
Hapur
enclosed
3 documents required · 3 mandatory
₹3,540
SE, EDC, Hapur
₹61,000
5 Sept 2024
8 Jun 2024
2 Sept 2024
8 Jun 2024
2 Sept 2024
8 Jun 2024
Amount
FOR VARIOUS WORKS REGARDING DO FUSE SET/TAIL LESS UNIT/DP/MCB ETC. AND OHTHER ASSOCIATED WORKS, IN BUSINESS PLAN (2024-25), IN THE AREA OF EDD-GARHMUKTESHWER, UNDER EDC., HAPUR, (Third party inspection of the quality of all works will be conducted by the department.)
Carriage of all petty material of estimate, from Electricity store center, Hapur to 33/11KV Sub-Station/site of work with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge.
Carriage of 33KV CT Outdoor 33KV CTR 200/100/1, from Electricity store center, Hapur to 33/11KV Sub-Station with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge.
Carriage of 33KV PT, from Electricity store center, Hapur to 33/11KV Sub-Station with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge.
Carriage of 33KV control Pannel for Single FDR from Electricity store center, Hapur to 33/11KV Sub-Station with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge.
Erection and Fixing of 11KV Lightening Arrestor by providing all fixing materials and completion work properly as per RESPO Drawing/Norms and as per direction of site incharge.
Erection and Fixing of 33KV Lightening Arrestor by providing all fixing materials and completion work properly as per RESPO Drawing/Norms and as per direction of site incharge.
Erection and Fixing of 33KV Line Isolator by providing all fixing materials and completion work properly as per RESPO Drawing/Norms and as per direction of site incharge.
Erection & Fixing of 11KV. Fuse set on STP/PCC Pole, by providing all required fixing materials as per RESPO/Norms and as per direction of site incharge.
Erection & Fixing of LT Fuse system on STP/PCC Pole, by providing all required fixing materials as per RESPO/Norms and as per direction of site incharge.
Installation/Erection of L.T. three phase with neutral MCB with DB Box, including providing of the same and Completion of properly work as per RESPO Norms and as per direction of site incharge.
Installation of Battery set and completion work properly as per RESPO Drawing/Norms, and as per direction of site incharge.
Installation of Battery charger set and completion work properly as per RESPO Drawing/Norms, and as per direction of site incharge.
Mounting, Placing and connecting of all connections of 33KV PT and completion work properly by providing required matrial, as per RESPO Norms, and as per direction of site incharge.
Mounting, Placing and connecting of all connections of 33KV CT Outdoor 33KV CTR 200/100/1, and completion work properly by providing required matrial, as per RESPO Norms, and as per direction of site incharge.
Erection/Installation of 33KV Control Pannel single fdr after fixing of anchor GI nuts & bolts of proper size for completion of work by providing required material, as per RESPO/Drawing Norms, and as per direction of site incharge.
Earthing of supports with MS earth Rod of (20x2500)mm long including excavation of pit and driving M.S. Rod 3.0 M apart from support and 0.5m below the ground level and connection below the earth electrodes with the help of G.I. wire & earthing lugs as per RESPO Drawing/Norms by providing proper size nuts & bolts., and as per direction of site incharge.
Construction of safety fencing (MS) for Transformer 11/0.4 KV Sub Station, With supply of material required for MS fencing (50X50X3 MM) M.S. wire mesh construction utilizing vertical post duly grouted/fitted in ground/on floor. Horizontal angle/T-iron to be fitted on vertical posts. Pickets (if required) fitted to rail and gate to facilitate entry and exit. The vertical Posts/Horizontal post shall be made of M.S. angle 75x75x6mm. Such post shall be kept preferably at distance of 800-1000 MM. and shall be grounded with CC ratio 1:4:8. The length of vertical post shall be sufficient to take care of fencing as requirement at site, and as per direction of site incharge.
Providing and installation of maintenance free multifaceted proactive and corrosion free chemical earthing electrod size 80mm x 3000mm complete with 50KG backfill compound with all required accessories for Body/neutral earthing of Transformers, including cost of M.S. earth strip for connection the earth strip will be welded to the earthing and neutral support, as per RESPO/Norms and as per direction of site incharge.
Construction of T/F plinth suitable for 250KVA T/F (size of 2 x 2 x 1.5 mt.) as per drawing, cc work in foundation in ratio 1:4:8 (Cement, Sand & Brick ballast). Ist class brick work in side walls cc ratio of 1:4 (cement & fine sand). 12mm thick plaster in ratio 1:4 (cement & fine sand). The RCC work on top of plinth in ratio 1:2:4 after duly filling of brick ballast inside the plinth & ramming the same, including cost of all material & labour and as per direction of site incharge.
Earthing of neutral & body of T/F By Boring and lowering of G.I. Pipe size 32 mm dia… into the ground up to water level 120 fit. With the lower end of solid copper cone approx. 225mm long and 750 gm. in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 SWG from the cone up to the ground surface where it will be bolted to the M.S. earth strip for T/F neutral connection, the earth strip will be welded to the G.I. pipe and neutral earthing support.
Installation/Erection of L.T. Tail Less Unit set (Three circuit in one set) 500Amps., with structure and concreeting work, including providing of the same and Completion properly work as per RESPO Norms and as per direction of site incharge.
Providing and fixing of L.T. Aluminum Lugs as per RESPO/Norms and as per direction of site incharge.
Providing and fixing of L.T. Aluminum Bus-Bar as per RESPO/Norms and as per direction of site incharge.
Providing and fixing of L.T. Lugs as per RESPO/Norms and as per direction of site incharge.
Jumpering and line energisation work properly as per RESPO/Norms and as per direction of site incharge.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .