Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹30.4 LAdmitted-Finance | -49.31% | ₹30.4 L | L1 | Admitted-Finance |
| 2 | L2₹34.7 L+₹4.3 L (14.1%)Admitted-Finance | -42.18% | ₹34.7 L+₹4.3 L (14.1%) | L2 | Admitted-Finance |
| 3 | L3₹35.3 L+₹4.9 L (16.2%)Admitted-Finance | -41.11% | ₹35.3 L+₹4.9 L (16.2%) | L3 | Admitted-Finance |
| 4 | L4₹36.2 L+₹5.8 L (19.1%)Admitted-Finance | -39.62% | ₹36.2 L+₹5.8 L (19.1%) | L4 | Admitted-Finance |
| 5 | L5₹37.1 L+₹6.7 L (22.1%)Admitted-Finance | -38.10% | ₹37.1 L+₹6.7 L (22.1%) | L5 | Admitted-Finance |
Tender Value
₹60 L
EMD Value
₹1.2 L
Closing Date
18 Jun 2026, 4:00 pmClosed
Wildlife Warden Jambu Zoo
Nagrota Jammu
Up gradation of Crocodile and Gharial enclosure at Jambu Zoo
2026_FD_311456_1
11 WLWJZ of 2026-27
Open Tender
Civil Works
Item Wise
75 days
Jambu Zoo, Nagrota
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Wildlife Warden, Jambu Zoo
₹1.2 L
22 Jun 2026
3 Jun 2026
19 Jun 2026
3 Jun 2026
18 Jun 2026
3 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Clearing jungle including uprooting of rank vegetation,grass,brush wood,trees and saplings upto girth of 30 cms measured at aheight of 1 m above ground level and removal of rubbish upto a distance of 50m outside the periphery of area cleared. | 209.11 | sqm | 12.49 | ₹2,611.76 |
| 0.0 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas
(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including
disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by
Engineer-in-Charge. All kinds of soil 80% ord rock 20%: | 876.26 | cum | 228.32 | ₹2,00,068.37 |
| 0.0 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in
depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil : | 180.7 | cum | 592.6 | ₹1,07,082.82 |
| 0.0 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10 (1 Cement : 5 coarse sand :10 graded stone aggregate 40 mm nominal size) | 29.4 | cum | 4,826.5 | ₹1,41,899.1 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 2.7 | cum | 6,591.25 | ₹17,796.38 |
| 0.0 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto below chainlink level level.1:3:6 (1 cement :3 coarse sand : 6 graded stone aggregate 20mm nominal size) | 412.05 | cum | 5,733.6 | ₹23,62,529.88 |
| 0.0 | Providing and laying in position specified grade of reinforced cement concrete including
curing but excluding the cost of centering, shuttering, finishing and reinforcement. All
works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 54.56 | cum | 7,788.4 | ₹4,24,935.1 |
| 0.0 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500 D or more. (Complete Job) | 5,728.8 | sqm | 123.2 | ₹7,05,788.16 |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form for : foundations, footings, bases of columns, etc. for mass concrete | 837.4 | cum | 286.35 | ₹2,39,789.49 |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 176 | cum | 628.95 | ₹1,10,695.2 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 10.08 MB
BOQ_1008479.xls
BOQ • 0.32 MB
corrigendumgharial.pdf
PDF • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .