| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.6 LAccepted-AOC 0 SHANKERPURI COLONY SAHARANPUR BEHAT ROAD NEAR DEHAT KOTWALI SAHARANPUR UTTAR PRADESH 247001 | SAHARANPUR | UTTAR PRADESH | 247001 | L1 | Accepted-AOC L1 | |
| 2 | L2₹18.4 L+₹81,736.24 (4.66%)Rejected-Finance 100 33 1 R G S ROAD USHAGRAM SALANPUR 713303 WEST BENGAL INDIA | ASANSOL | PASCHIM BARDHAMAN | WEST BENGAL | 713303 | L2 | Rejected-Finance L2 | |
| 3 | L3₹19.9 L+₹2.4 L (13.5%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
₹17.6 L
EMD Value
₹22,100
Closing Date
28 Oct 2023, 5:00 pmClosed
The General Manager
Office of The General Manager, Satgram Sripur Area
Installation of electrical panel in skip winder and men winder of Satgram Project under Satgram Sripur Area.
2023_ECL_291223_1
ECL/SSA/GM/E M/E NIT/2023 24/233
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Satgram-Sripur Area
Please refer Tender documents.
7 documents required · 7 mandatory
₹22,100
22 Feb 2024
16 Oct 2023
30 Oct 2023
16 Oct 2023
28 Oct 2023
16 Oct 2023
16 Oct 2023 - 20 Oct 2023
Amount
Item description
Supply of 6.6 KV 3 phase vacuum contractor unit capacity 600 Amps (Auxiliary Supply voltage 230 VAC) with 4 No 4 NC.
Installation of 6.6 kv 3 phase vacuum contractor unit capacity 400 Amps including Fabrication/ modification of starter panel with supply of rated copper bus bar as per requirement. Break up cost for installation each vacuum contractor:- a) copper bus bar 5.6 kg @ Rs. 902/- Rs. 5051.00 b) Skilled Worker 4 head @ Rs. 695/- Rs. 2780.00 c) Unskilled Worker 4 head @ Rs. 494/- Rs. 1976.00 d) Supervisor 4 Head @Rs. 577/- Rs. 2308.00
Supply & Installation of Inverse type Numerical IDMT Over current, Earth Fault relay consists 02 Nos Over current & 01 No. Earth Fault trip. (Auxiliary Supply voltage 230AC) Including necessary wiring in the panel.
Supply & Installation of Numerical Earth leakage relay with CBCT Earth leakage Setting 300 mA to 12Amps with timer. (Auxiliary Supply voltage 230AC) including necessary wiring in the panel.
Supply & installation of DC Power Pack (Converter from AC supply to DC Supply) by supply of Plate diode & capacitor.
Supply & installation of Auxiliary Master trip relay. (Auxiliary Supply voltage 230AC)
Repairing & painting of starter panel door & Interlock system.
Supply & fitting of 16Amp. 230 volt 3phase Auxiliary contractor unit.
Complete repairing of Auxiliary 220volt circuit with supply of consumable materials such as porcelain fuse base with carrier single core 1.1kv grade 2.5 sq.mm copper wire, connectors, lugs, ferrules, pvc tie, belt etc.
Repairing of 6.6KV 3Ph. Isolator including replacement of consumable part like spring, worn out materials.
Charging of Sulphur Hexafluoride gas on 33KV 1250Amps SF6 Breaker at 33KV Surface Sub Station.
To & Fro transportation Cost of Workman & Tools & tackles.
Total impact of GST for the purpose of CTC
ELECTRO POWER INDUSTRIES
MOONLIGHT
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_301625.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .