Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.6 LAdmitted-Finance | -2.61% | ₹8.6 L | L1 | Admitted-Finance |
| 2 | L2₹8.7 L+₹14,961.80 (1.75%)Admitted-Finance | -0.91% | ₹8.7 L+₹14,961.80 (1.75%) | L2 | Admitted-Finance |
Tender Value
₹10.4 L
EMD Value
₹88,011
Closing Date
3 Jul 2026, 3:00 pmClosed
Executive Engineer
Nagar Nigam Firozabad
Construction of RCC drain and CC road from Rajpal house to Dharmendra house via Pt. Nirmal Sharma in Ward No. 21, 22 Om Nagar.
2026_DOLBU_1148317_299
05/PWD_15vitt_Rajvitt/2026-27
Open Tender
Civil Works
Percentage
Firozabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,039
Municipal Corporation
₹88,011
27 Jul 2026
24 Jun 2026
3 Jul 2026
24 Jun 2026
3 Jul 2026
24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of interlocking tiles including stacking of servicable materials and disposale of unservicable materials within a lead of 50 meters as per dircticon of EI/C. | 247.9 | Cum | 10 | ₹2,479 |
| 2 | Deduction for dismantled interlocking tiles. | 5,205 | Cum | 4.6 | ₹23,943 |
| 4 | Disposal of malba from site with cartage up to 8km distance including loading & unloading, T&P etc. required for proper of work as direction by Engineer-In-Charge. (PWD SOR 2017-18, Chepter-3, Item No. 231a ) | 105 | Cum | 374 | ₹39,270 |
| 5 | Grandular Sub- base with well Graded Material (A) BY Mix in place method construction of granular sub- base by providing well graded material, spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotavator at OMC and compacting with smooth wheelo roller to achieve the desired density complete.(As per Analysis) | 40.2 | Cum | 3,234 | ₹1,30,006.8 |
| 6 | RCC work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWD SOR 2025-26, Chepter-5, Item No.9 Spec. no. 5.1). | 14.74 | Cum | 8,100 | ₹1,19,394 |
| 7 | R.C.C work in Wall (any thickness) including attached plasters, buttresses, plinth and string courses, fillers, columns, pillars, abutments, post and struts etc. including the cost of centering, shuttering, finishing and excluding reinforcement All work up to plinth level in 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) upto plinth level (PWD SOR 2025-26, Chepter-5, Item No.9 Spec. no. 5.2) | 16.08 | Cum | 8,300 | ₹1,33,464 |
| 8 | Grandular Sub- base with well Graded Material (A) BY Mix in place method construction of granular sub- base by providing well graded material, spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotavator at OMC and compacting with smooth wheelo roller to achieve the desired density complete.(As per Analysis) | 40 | Cum | 7,700 | ₹3,08,000 |
| 9 | RCC work Providing and laying in position specified grade of reinforced cement concrete, Slab including the cost of centering, shuttering, finishing and excluding reinforcement - Above plinth level upto fifth floor level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWDSOR 2025-26 Chapter No-05 Item No.10 Spec. No. 5.1). | 0.36 | Cum | 8,600 | ₹3,096 |
| 10 | M.S or Iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary of the work and including the suply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. (As per Analysis of Rate) | 19.58 | Cum | 7,800 | ₹1,52,724 |
| 11 | M.S Speciefication Board including painting & writing | 1 | Job | 4,635 | ₹4,635 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.04 MB
TD.pdf
Tender Documents • 6.85 MB
BOQ_2180880.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .