Loading
Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAdmitted-Finance | ₹7.1 L | L1 | Admitted-Finance |
| 2 | L2₹7.6 LAdmitted-Finance | ₹7.6 L | L2 | Admitted-Finance |
| 3 | L3₹9.4 LAdmitted-Finance | ₹9.4 L | L3 | Admitted-Finance |
| 4 | L4₹10.4 LAdmitted-Finance | ₹10.4 L | L4 | Admitted-Finance |
| 5 | L5₹12.2 LAdmitted-Finance | ₹12.2 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SALAMAT HUSSAIN L3 | M/s CHANCHAL ASSOCIATES L2 | M/s SHASHAVEER SINGH CONTRACTOR AND SUPPLIERS L4 | chahar constructions L1 | M/S SRASHTI INFRASTRUCTURE L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Uprooting jhunds and moonj with disposal away from site as directed by Engineer-in-Charge. | 8,800 | sqm | 27.9 ₹2.5 L | 14 ₹1.2 L | 19 ₹1.7 L | 7 ₹61,600 | 21 ₹1.8 L |
| 2.00 | Earth work in silt clearance including lift up to 1.5 M and lead up to 30M including ramming and dressing by manual labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge.... also including wet earth work under water excluding dewatering with cost of labour and T&P etc. complete | 7,420 | cum | 27.2 ₹2.0 L | 26.8 ₹2.0 L | 36.9 ₹2.7 L | 24 ₹1.8 L | 47 ₹3.5 L |
| 3.00 | Earth work in silt clearance including lift up to 1.5 M and lead up to 30M including ramming and dressing by manual labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge | 19,700 | cum | 24.87 ₹4.9 L | 22 ₹4.3 L | 30.25 ₹6.0 L | 24 ₹4.7 L | 35 ₹6.9 L |
Tender Value
₹18.8 L
EMD Value
₹38,000
Closing Date
3 Jun 2026, 5:00 pmClosed
Executive Engineer
LDAC, AGRA
Clearance of Patsal Drain
2026_UPIDC_1145201_53
01/EE/2026-27
Open Tender
Civil Works
20 days
Clearance of Patsal Drain
Please refer Tender documents.
3 documents required · 3 mandatory
₹354
₹38,000
6 Jun 2026
28 May 2026
4 Jun 2026
28 May 2026
3 Jun 2026
28 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Uprooting jhunds and moonj with disposal away from site as directed by Engineer-in-Charge. | 8,800 | sqm | - | - | 1 |
| 2 | Earth work in silt clearance including lift up to 1.5 M and lead up to 30M including ramming and dressing by manual labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge.... also including wet earth work under water excluding dewatering with cost of labour and T&P etc. complete | 7,420 | cum | - | - | 2 |
| 3 | Earth work in silt clearance including lift up to 1.5 M and lead up to 30M including ramming and dressing by manual labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge | 19,700 | cum | - | - | 3 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.90 MB
BOQ_2163336.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid