| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.8 LAccepted-AOC 100 FEET ROAD NEAR POWER HOUSE ROAD CHOWK BATHINDA | BATHINDA | BATHINDA | PUNJAB | L1 | Accepted-AOC Being lowest and reasonable. | |
| 2 | L-2₹16.7 L+₹2.9 L (20.7%)Rejected-Finance A 102 GOLDEN SAND APARTMENTS GAZIPUR DHAKOLI ZIRAKPUR PB 160104 | ZIRAKPUR | S A S NAGAR | PUNJAB | 160104 | L-2 | Rejected-Finance Not being lowest bidder. | |
| 3 | L-3₹20.0 L+₹6.2 L (44.6%)Rejected-Finance | L-3 | Rejected-Finance Not being lowest bidder. | |
| 4 | L-4₹23.3 L+₹9.4 L (68.1%)Rejected-Finance H NO 282 GREEN CITY II BATHINDA | BATHINDA | PUNJAB | 151001 | L-4 | Rejected-Finance Not being lowest bidder. |
Tender Value
₹16.0 L
EMD Value
₹32,020
Closing Date
30 Nov 2024, 6:00 pmClosed
CWE Bathinda
HQ CWE Bathinda Bathinda Mil Stn
SPECIAL REPAIR TO INTERNAL BLACK TOP ROAD AGAINST JOB NO 81 SA/BTD/SR-(RD)-06/2024-25 UNDER GE(N) BATHINDA AT BATHINDA MIL STN
2024_MES_674705_1
CWE BTD/TOKEN-21/2024-25
Open Tender
Civil Works - Roads
Item Rate
90 days
Bathinda Mil Stn
As per NIT
7 documents required · 7 mandatory
₹500
GE (N) Bathinda
₹32,020
HQ CWE Bathinda
17 Jan 2025
14 Sept 2024
2 Dec 2024
14 Sept 2024
30 Nov 2024
16 Nov 2024
26 Sept 2024
Amount
Material and labour for preparing black top surface by brushing with wire brush for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surface with air pressure through air jet using air compressor to remove all the loose dirt etc. including removing the mud etc. to a distance minimum 1.5 mtrs from edge of road and applying evenly a tack coat of bituminous primer using paving bitumen (VG-10) @ 5Kg per 10 sqm of road surface by sprayer operated hot pressure mechanism including Supplying and laying Premix Bituminous concrete 30mm consolidated thickness with 5.5% binder (paving bitumen of grade VG-30) content by weight of total mix and crushed aggregates of grading 2 with mixing of agrgregates and VG-30 bitumen in electronic operated 100-120 TPH batch type hot mix plant, transporting the hot mix from HMP to work site by tippers and laying with hyrdostatic paver finisher and as per approved mix and rolled & compacted to required camber and gradient with 8 to 12 tonne smooth wheeled, vibratory and tandem roller, complete all as per Clause 507 MORTH (5th Rev) specification and as specified and directed. NOTES : 1. The contractor shall quotes the rate against Item considering 5.5% VG-30 bitumen content. Job Mix Formula as per CIause. No. 505.3.3 of MORTH (5th Rev) for BC shall be worked out from Govt Lab / Govt Engineering Collage / CTL for obtaining Optimum Binder Content (OBC) by the Contractor without any financial effect to the Dept and same be submitted to the Accepting officer for approval. Any variation in binder content on minus side shall be adjusted @ Rs 50/per kg of binder and no adjustment shall be made on plus side. 2. Cost of filler i.e. cement (Ordinary portland cement/OPC) is deemed to be included in quoted unit rate. 3. After spreading of mix as per clause 507.4.7 entire surface during the operation shall be rolled with road roller 8-10 tonne (smooth wheeled) followed with vibratory road roller of 8-10 tonne static weight, followed by finished rolling with 6 to 8 tonne smooth wheel tendom roller as per Clause Nos. 507.4.8 and cost of the same is deemed to be included in quoted unit rate. 4. Contractor shall intimate the planned date of incorporation of mix in advance to GE. Premix will be approved in writing by Rep of Accepting Officer at plant site before incorporation of the same in the work
Material and labour for Repairs to pot holes any depth not exceeding 1.00 Sqm each including sweeping free from dust and mud or water, scouring sunken surfacesin roads, path etc cutting edges at least 25 mm depth and making good by applying tack coat with bitumen @ 5 kg / X Sqm, putting in premix bituminous macadam using paving bitumen of grade VG-30 well rammed and sealed with binder @ 9.80 kg mixed with 0.09 cum of stone chippings 6.3 mm size per 10 Sqm and again well rammed including supply of premixed macadam, binder and chipings, depth of pot holes exe 30mm thick, complete all as specified and directed by Engineer-in- charge.. Note as per MORTH Specification: (i) Loose material and standing water shall be brushed from the area to be repaired. (ii) Potholes shall be cut to vertical sides and deepened to reach sound material . (iii) Fill the patch with the granular mix in layers of about 75mm at a time. Each layer shall be compacted with hand rammers or with small vibratory compactors. The patch shall be compacted to the correct shape. (iv)100% quantity of Pot holes shall be marked and checked by Engineer-in-charge before commencement of work and shall also be entered in MB with reference to permanent objects before starting carpeting work. (v) Rate quoted by contractor shall deemed to be including of supply of premixed macadam binder and chippings
Material and Labour for providing and laying Premix Bituminous macadam of consolidated thickness not exceeding 75mm, using paving bitumen binder of grade VG-30 @ and binder content of 3.4 % by weight of total mix with mixing of aggregates and VG-30 bitumen in electronic operated 100-120 TPH batch type hot mix plant, transporting the hot mix from HMP to work site by tippers and laying with hydrostatic paver finisher (Paver shall not be compulsory in case of patch work using B.M.) and as per approved mix and rolled & compacted to required camber and gradient with 8 to 12 tonne smooth wheeled, vibratory and tandem roller, complete all as per Clause 504 MoRTH (5th Rev) specification and as specified and directed by Engineer-in-charge.. NOTES : 1. The contractor shall quote the rate against Item considering 3.4% VG-30 bitumen content. Job Mix Formula as per CI. No. 505.3.3 of MORTH (5th Rev) for BM shall be worked out from Govt Lab / Govt Engineering Collage / CTL for obtaining optimum binder content (OBC) by the Contractor without any financial effect to the Dept and same be submitted to the Accepting officer for approval. Any variation in binder content on minus side shall be adjusted @ 50/ per kg of binder and no adjustment shall be made on plus side. 2. The BM shall be covered with top layer / wearing course within in a maximum of 48 hours. If there is to be any delay, by the contractor the course shall be covered by seal coat to the requirement of Clause 512 of MORTH (5th Rev) before opening to the traffic. The seal coat in such cases shall be considered incidental to the work and shall not be paid for separately. 3. Contractor shall intimate the planned date of incorporation of mix in advance to GE. Premix will be approved in writing by Rep of Accepting Officer at plant site before incorporation of the same in the work
Material and labour for 2.5mm thick road marking thermo plastic reflective paint to be carried out mechanically with hot application of material (painting material @ 5 Kg /Sqm ) and glass beads @ 250 gm / Sqm confirming to CI No. 803.4 of MoRTH in strips of 100mm / 150 mm width on road surfaces complete all as specified and directed by Engineer-in-Charge.
AP BUILDERS (BID ID -3172101)
KARTIK BUILDERS (BID ID -3170576)
M/s Azure Infrastructure Construction Co. (BID ID -3177858)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .