Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.8 LAccepted-AOC | ₹15.8 L | L1 | Accepted-AOC AWARD OF CONTRACT IS GIVEN TO THE CONTRACTOR |
| 2 | L2₹16.2 LRejected-Finance | ₹16.2 L | L2 | Rejected-Finance Rates of Bidder are below estimated rates and also higher among three. |
| 3 | L3₹16.7 LRejected-Finance | ₹16.7 L | L3 | Rejected-Finance Rates of Bidder are below estimated rates and also higher among three. |
| Sl No | Description | Qty | Unit | AKHILESH KUMAR GANGWAR L3 | ABHISHEK ASSOCIATES L1 | M/S SUDHIR CHANDRA CONSTRUCTION AND SUPPLIER L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in foundation in wet soil including lift up to 1.50 m and lead up to 30 m and including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into | 124.83 | cum | 132 ₹16,477.43 | 45 ₹5,617.31 | 100 ₹12,482.90 |
| 2.00 | Centering and shuttering (steel shuttering) for C.C. work up to 3.0 m height including cost of all labour, material and T&P etc. required for proper completion of work. | 29.48 | sqm | 500 ₹14,741 | 841 ₹24,794.36 | 500 ₹14,741 |
| 3.00 | Providing and Laying M-10 (C.C.1:3:6) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 30.75 | cum | 5,646.6 ₹1.7 L | 6,450 ₹2.0 L | 5,630 ₹1.7 L |
| 4.00 | Laying R.C.C. 1:1.5:3 Mix (M-20) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering. | 26.04 | cum | 6,889.9 ₹1.8 L | 7,940 ₹2.1 L | 6,880 ₹1.8 L |
| 5.00 | Brick work in 1:4 cement mortar in Abutment, Wing wall & Parapet etc.up to 3 m lift and 60 M lead including cost of all material, labour and T&P required for proper completion of work. | 70.99 | cum | 5,226.7 ₹3.7 L | 5,565 ₹4.0 L | 5,226.7 ₹3.7 L |
| 6.00 | Cement pointing in 1:2 cement mortar (struck deep) on brick masonary including cost of all material, labour and T&P etc. required for proper completion of work. | 78.7 | sqm | 115.9 ₹9,121.21 | 154 ₹12,119.65 | 115 ₹9,050.39 |
| 7.00 | Centering and shuttering (steel shuttering) for R.C.C. work up to 3.0 m height including cost of all labour, material and T&P etc. required for proper completion of work. | 47.85 | sqm | 822 ₹39,334.34 | 695 ₹33,257.14 | 822 ₹39,334.34 |
| 8.00 | Reinforcement including cutting, bending & binding in position including cost of bindingwire and also including all cost of labour, material and T&P etc. required for proper completion of work. | 3.39 | M.T | 65,140.6 ₹2.2 L | 69,000 ₹2.3 L | 65,000 ₹2.2 L |
| 9.00 | Laying R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 20 mm down graded stone grit in wearing coat including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement. | 4.75 | cum | 7,720.1 ₹36,701.36 | 7,695 ₹36,582.03 | 7,720.1 ₹36,701.36 |
| 10.00 | Providing and fixing Drainage Spouts (100 mm dia) complete including cost of all material, labour and T&P etc. required for proper completion of work. | 2.1 | R.M | 154 ₹323.40 | 100 ₹210 | 154 ₹323.40 |
Tender Value
₹17.1 L
EMD Value
₹1.7 L
Closing Date
6 Apr 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
O/O EXECUTIVE ENGINEER, MADHYA GANGA CANAL CONSTRUCTIO DIVISION-9, SABHAL
CONSTRUCTION OF V.R.B AT KM 9.500 OF KAILY DY.
2026_UPIDC_1128907_1
01/EE/2025-26
Open Tender
Civil Works - Canal
90 days
KAILY
PLEASE REFER TENDER DOCUMENT
3 documents required · 3 mandatory
₹766
₹1.7 L
SAMBHAL
19 May 2026
23 Mar 2026
6 Apr 2026
23 Mar 2026
6 Apr 2026
23 Mar 2026
24 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in foundation in wet soil including lift up to 1.50 m and lead up to 30 m and including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into | 0.6 | cum | - | - |
| 2Centering and shuttering (steel shuttering) for C.C. work up to 3.0 m height including cost of all labour, material and T&P etc. required for proper completion of work. | |||||
| 3Providing and Laying M-10 (C.C.1:3:6) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | |||||
| 4Laying R.C.C. 1:1.5:3 Mix (M-20) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering. | |||||
| 5 | Brick work in 1:4 cement mortar in Abutment, Wing wall & Parapet etc.up to 3 m lift and 60 M lead including cost of all material, labour and T&P required for proper completion of work. | 0.4 | cum | - | - |
| 6 | Cement pointing in 1:2 cement mortar (struck deep) on brick masonary including cost of all material, labour and T&P etc. required for proper completion of work. | 0.6 | sqm | - | - |
| 7Centering and shuttering (steel shuttering) for R.C.C. work up to 3.0 m height including cost of all labour, material and T&P etc. required for proper completion of work. | |||||
| 8 | Reinforcement including cutting, bending & binding in position including cost of bindingwire and also including all cost of labour, material and T&P etc. required for proper completion of work. | 0.38 | M.T | - | - |
| 9 | Laying R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 20 mm down graded stone grit in wearing coat including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement. | 1 | cum | - | - |
| 10Providing and fixing Drainage Spouts (100 mm dia) complete including cost of all material, labour and T&P etc. required for proper completion of work. | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.69 MB
Tendernotice_2.pdf
PDF • 3.86 MB
BOQ_2105648.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid