| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹51.4 LAdmitted-Finance | ₹51.4 L | L1 | Admitted-Finance |
| 2 | L2₹55.4 L+₹3.9 L (7.64%)Admitted-Finance | ₹55.4 L+₹3.9 L (7.64%) | L2 | Admitted-Finance |
| 3 | L2₹55.4 L+₹3.9 L (7.64%)Admitted-Finance | ₹55.4 L+₹3.9 L (7.64%) | L2 | Admitted-Finance |
| 4 | L3₹57.9 L+₹6.5 L (12.6%)Admitted-Finance | ₹57.9 L+₹6.5 L (12.6%) | L3 | Admitted-Finance |
| 5 | L4₹58.4 L+₹7.0 L (13.6%)Admitted-Finance | ₹58.4 L+₹7.0 L (13.6%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S VINAYAK ENGINEERS L1 | JASMEET SINGH L2 | M/s Veena constt. co L4 | M/S RATHER CONSTRUCTIONS AND TRADERS L2 | CEEKAY EPC PROJECTS PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00Supply, Erection/Creation, Testing & Commissioning of 63 KVA Sub Stations | ||||||||
| 1.01 | Supply, Installation & commissioning of 11/0.433 KV, 63 KVA 3-Phase Distribution Transformer with Bi-metallic terminal Connectors, Energy Level: 2, "BIS Marked" (Aluminum Wound) along with LV Cable Box having detachable Aluminum Gland plate including Transportation | 11 | No | 1,42,000 ₹15,62,000 | 1,48,000 ₹16,28,000 | 2,75,000 ₹30,25,000 | 1,48,000 ₹16,28,000 | 1,15,700 ₹12,72,700 Lowest |
| 1.02 | Supply, Transportation, Erection of 9 Mtr Long PCC Poles ( Wl. 300 KG) including excavation of pit and back filling of soil & consolidating by ramming, watering etc. | 22 | No | 8,500 ₹1,87,000 | 9,000 ₹1,98,000 | 7,000 ₹1,54,000 Lowest | 9,000 ₹1,98,000 | 7,700 ₹1,69,400 |
| 1.03 | Supply, Transportation, Fabrication & Fixing of MS Channel Iron, Cross arms, Angle Iron Braces, Clamps etc duly fabricated, red oxide & aluminum paint coated including all necessary Nut & Bolts & Washers etc. | 3,300 | Kgs | 130 ₹4,29,000 | 140 ₹4,62,000 | 125 ₹4,12,500 Lowest | 140 ₹4,62,000 | 150 ₹4,95,000 |
| 1.04 | Supply, Installation, Testing & Commissioning of 11 KV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type | 11 | set | 10,200 ₹1,12,200 | 11,000 ₹1,21,000 | 10,000 ₹1,10,000 Lowest | 11,000 ₹1,21,000 | 12,160 ₹1,33,760 |
| 1.05 | Supply, Installation, Testing & Commissioning of 11 KV Horn Gap Fuse Set 3 Phase 200 A . | 11 | set | 4,990 ₹54,890 Lowest | 5,000 ₹55,000 | 5,000 ₹55,000 | 5,000 ₹55,000 | 5,190 ₹57,090 |
| 1.06 | Supply & Fixing of Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type | 11 | set | 9,500 ₹1,04,500 | 9,500 ₹1,04,500 | 8,000 ₹88,000 Lowest | 9,500 ₹1,04,500 | 12,000 ₹1,32,000 |
| 1.07 | Providing & Fixing of 120 mm² Single-Core Cable,1.1kV Grade, PVC Insulated Stranded Conductor FRLS type | 484 | mtrs | 400 ₹1,93,600 | 400 ₹1,93,600 | 225 ₹1,08,900 Lowest | 400 ₹1,93,600 | 1,270 ₹6,14,680 |
| 1.08 | Providing & Fixing of Distribution Box for 63 kVA DTR with MCCB for incomer & SFU's for Outgoing Circuits | 11 | No | 35,000 ₹3,85,000 | 38,000 ₹4,18,000 | 28,000 ₹3,08,000 Lowest | 38,000 ₹4,18,000 | 31,750 ₹3,49,250 |
| 1.09 | Providing of Earthing of substation --Excavation of earth pit of dia. 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GIStrip for neutral earthing of size 25 mm x 3 mm for connection of transformer body ,G.O Set &lightening arrestor as per IS 2629/85, GI nuts &bolts ,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. | 33 | nos | 3,900 ₹1,28,700 | 4,000 ₹1,32,000 | 2,500 ₹82,500 Lowest | 4,000 ₹1,32,000 | 3,850 ₹1,27,050 |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
11 Dec 2021, 4:00 pmClosed
Executive Engineer
Office of the Executive Engineer, Electric Division Vijaypur
Supply, Erection, Creation, Testing and Commissioning of 63 KVA transformer substation along with laying of HT and LT line under the jurisdiction of Executive Engineer Electric Division Vijaypur, JPDCL, Jammu
2021_PDD_150571_1
EDV/ 37 of 2021-2022 Dated 03-12-2021
Open Tender
Electrical Works
Turn-key
30 days
Samba District
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,000
Executive Engineer Electric Division Vijaypur
₹1.2 L
2 Jun 2022
3 Dec 2021
13 Dec 2021
4 Dec 2021
11 Dec 2021
4 Dec 2021
4 Dec 2021 - 11 Dec 2021
Amount
Supply, Erection/Creation, Testing & Commissioning of 63 KVA Sub Stations
Supply, Installation & commissioning of 11/0.433 KV, 63 KVA 3-Phase Distribution Transformer with Bi-metallic terminal Connectors, Energy Level: 2, "BIS Marked" (Aluminum Wound) along with LV Cable Box having detachable Aluminum Gland plate including Transportation
Supply, Transportation, Erection of 9 Mtr Long PCC Poles ( Wl. 300 KG) including excavation of pit and back filling of soil & consolidating by ramming, watering etc.
Supply, Transportation, Fabrication & Fixing of MS Channel Iron, Cross arms, Angle Iron Braces, Clamps etc duly fabricated, red oxide & aluminum paint coated including all necessary Nut & Bolts & Washers etc.
Supply, Installation, Testing & Commissioning of 11 KV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type
Supply, Installation, Testing & Commissioning of 11 KV Horn Gap Fuse Set 3 Phase 200 A .
Supply & Fixing of Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type
Providing & Fixing of 120 mm² Single-Core Cable,1.1kV Grade, PVC Insulated Stranded Conductor FRLS type
Providing & Fixing of Distribution Box for 63 kVA DTR with MCCB for incomer & SFU's for Outgoing Circuits
Providing of Earthing of substation --Excavation of earth pit of dia. 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GIStrip for neutral earthing of size 25 mm x 3 mm for connection of transformer body ,G.O Set &lightening arrestor as per IS 2629/85, GI nuts &bolts ,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
Providing of Stone Pad 300 mmx300mmx75mm
Providing & Fixing of 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
Providing & Fixing of 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
Providing & Fixing of Anti Climbing device with Clamps
Providing & Fixing of Danger Plates with Clamps
Providing & Fixing of Galvanized Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm),nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia. GI stranded wire complete
SCOPE OF WORK FOR LAYING OF HT LINE ON 9 MTR PCC POLES USING ACSR WEASEL Conductor
Supply, Transportation, Erection of 9 Mtr Long PCC Pole (WL-300 KG) including excavation of pit and back filling of soil & consolidating by ramming, watering etc.
Supply, Transportation, Fabrication & Fixing of MS Channel Iron, Cross arms, Angle Iron Braces, Clamps etc duly fabricated, red oxide & aluminium paint coated including all necessary Nut & Bolts & Washers etc.
Supply, Laying & Stringing of ACSR Weasel Conductor on Cross arms through insulators including proper binding & twisting with soft Aluminium Wire
Supply Installation, Testing & Commissioning of 11kV Polymeric composite Pin Insulator 12kV, 5kN,Lighting Impulse 75kV Positive and 80kV Negative,creepage distance 320mm
Supply Installation, Testing & Commissioning of 11kV Polymeric composite Disc Insulator 12kV,minfailing load 45kN, Lighting Impulse 75kV Positiveand 80kV Negative, creepage distance 320mm
Providing & Fixing of Galvanised Stay Set with 50 x 8 mm Stay Clamp, Guy Insulator (2 Nos), Anchoring Plate (200 x 200 x 6 mm), Nut & Bolts, 2 No Turn Buckle, 1.8m long, 16 mm diameter solid Stay Rod & 7/3.15 mm dia stranded wire complete
Providing & Fixing of Danger Plates with Clamps
Providing & Fixing of Anti Climbing device with Clamps
Providing of Earthing Complete by GI Pipe 40 mm or GI Rod 20 mm, 2.5 Mtr Long through GI Strip
Providing of Stone Pad 300 mmx300mmx75mm
Providing and fixing of Aluminium Jointing sleeves
Providing and fixing of P G Clamps
SCOPE OF WORK FOR LAYING OF LT LINE ON 8 MTR PCC POLES USING ACSR WEASEL CONDUCTOR ( 3 Phase 4 wire)
Supply, Transportation, Erection of 8 Mtr Long PCC Pole (WL-200 KG) including excavation of pit and back filling of soil & consolidating by ramming, watering etc.
Providing & Fixing of MS U-Clamp with Shakle Insulator (Polymer/Porcelain) alongwith Nut & Bolt of sorts
Supply, Laying & Stringing of ACSR Weasel Conductor through insulators including proper binding & twisting with soft Aluminium Wire(three Phase four wire)
Providing & Fixing of Galvanised Stay Set with 50 x 8 mm Stay Clamp, Guy Insulator (2 Nos), Anchoring Plate (200 x 200 x 6 mm), Nut & Bolts, 2 No Turn Buckle, 1.8m long, 16 mm diameter solid Stay Rod & 7/3.15 mm dia stranded wire complete
Providing & Fixing of Danger Plates with Clamps
Providing & Fixing of Anti Climbing device with Clamps
Providing & Fixing of LT Line Spacers
Providing of Earthing Complete by GI Pipe 40 mm or GI Rod 20 mm, 2.5 Mtr Long through GI Strip
Providing of Stone Pad 300 mmx300mmx75mm
Providing and fixing of Aluminium sleeves
M/S RATHER CONSTRUCTIONS AND TRADERS
JASMEET SINGH
CEEKAY EPC PROJECTS PRIVATE LIMITED
M/s Veena constt. co
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .